SOLICITATION NOTICE

Z -- Miller's Flat Gravel Haul-Manti-LaSal National Forest

Notice Date
6/11/2022 5:55:35 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
484220 — Specialized Freight (except Used Goods) Trucking, Local
 
Contracting Office
USDA-FS, CSA INTERMOUNTAIN 7 Ogden UT 844012310 USA
 
ZIP Code
844012310
 
Solicitation Number
1240LS22Q0052
 
Response Due
6/16/2022 12:00:00 PM
 
Archive Date
07/01/2022
 
Point of Contact
Christine Hansen, Phone: 8019081910
 
E-Mail Address
christine.m.hansen@usda.gov
(christine.m.hansen@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Amendment 1** The purpose of this amendment is to provide questions and answers. The closing date and time remain the same. The Manti-LaSal National Forest anticipates a need for loading and hauling of up to 20,000 CY of stockpiled aggregate on the Millers Flat Road 50014 The project consists of: This contract is for the loading and hauling of up to 20,000 CY of stockpiled aggregate on to the Millers flat road 50014. The material for the northern portion of the road, from Highway 31 to the intersection of 53306 at the Scad Valley Divide, will come from the Cabin Hollow Pit. The material for the southern portion of the road, From the intersection of 53306 at Scad Valley Divide to the intersection with 50217 Potters Canyon, will come from the Reederview Pit. This contract also includes options. Option 1:� The loading and hauling of up to 3,200 CY of stockpiled aggregate on to the main roads in the Lake Fork Canyon Campground. This includes roads Lake Canyon 50359, Lake Canyon South Access 53132, Lake Canyon CG New Loop 53133, Lake Canyon Rolfson South 53050 and Lake Canyon Rolfson North 53051 from the Cabin Hollow Pit. Option 2:� The loading and hauling of up to 1,500 CY of stockpiled aggregate on to the Potters Canyon Road 50271 and the South Loop of Potters Campground 52217 from the Reederview Pit. Option 3:� The loading and hauling of up to 6,000 CY of stockpiled aggregate on to the South Skyline Drive Road from Highway 31 to the end of the gravel, approximately 7 miles. Option 4:� The loading and hauling of up to 3,000 CY of stockpiled aggregate onto North Skyline from Highway 31 to the pit location. This will occur at locations if they begin to show excess wear from hauling operations. Option 5:� The loading and hauling of up to 3,000 CY of stockpiled aggregate onto the South end of Millers Flat from the pit location to the intersection with Potters Canyon 50271. This will occur at locations if they begin to show excess wear from hauling operations. The contract includes loading stockpiled aggregate into hauling vehicles and dumping onto roadway to be spread and placed by the forest service. Minimum of 6 hauling trucks will be required at all times during hauling days. Hauling days will be Monday � Friday 8am � 5pm, except on Holiday Weekends. The project location is: The Cabin Hollow Pit is located approximately 15 miles northeast of Fairview, Utah. You can access the Cabin Hollow Pit from Fairview by traveling east on Highway 31 up Fairview Canyon to the intersection with Forest road 50150 Skyline drive, then North approximately 5 miles on 50150 Skyline Drive to the pit. The Reederview Pit is located approximately 17 miles northwest of Orangeville, Utah. You can access the Reeder View Pit from Orangeville by traveling west on Highway 29 up Straight Canyon to the intersection with Forest road 50014 Miller Flat Rd, then North approximately 0.7 miles on 50014 Miller Flat Rd to the pit. The Millers Flat road 50014 is located approximately 19 miles northeast of Fairview, Utah, traveling east on Highway 31. This road is the main location for the delivery of the aggregate. From this intersection the project extends south along the Millers Flat road approximately 11 miles. Options 1, 2 & 5 are accessed from this section of roadway. The South Skyline Road 50150 is located approximately 14 miles northeast of Fairview, Utah, traveling east on Highway 31. From this intersection this option of the project extends south along the South Skyline road approximately 7 miles. Questions regarding this opportunity are due in writing to the CO, Chris Hansen, christine.m.hansen@usda.gov� by Tuesday, May 31, 2022 at 1:00 PM Mountain Time (local time). Project start date will be approximately May 1, 2023 This project is a total Small Business Set Aside. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. SAM REGISTRATION REQUIREMENTS: Prospective contractors must be registered in the System for Award Management (SAM) prior to submitting a proposal www.sam.gov.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6ac1bb2a851b49d5801fcc47f6a71771/view)
 
Place of Performance
Address: Price, UT, USA
Country: USA
 
Record
SN06355238-F 20220613/220611230056 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.