Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 17, 2022 SAM #7504
SOLICITATION NOTICE

43 -- 43--SEAL ASSEMBLY,SHAFT

Notice Date
6/15/2022 12:51:44 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
 
ZIP Code
17050-0788
 
Solicitation Number
N0010422QNF13
 
Response Due
7/10/2022 10:00:00 PM
 
Archive Date
07/26/2022
 
Point of Contact
Telephone: 7176052995
 
E-Mail Address
CANDICE.BENJAMIN@NAVY.MIL
(CANDICE.BENJAMIN@NAVY.MIL)
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|x||x|x|x|x|x|x|||x|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|FAT details are included in the drawing|||||||||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|x|x|x|||x|||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|333914 |750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| EVALUATION OF FIRST ARTICLE TESTING|3|||x| The quantity has been increased from 24 units to 32 units. SUBCLIN 0001AA has changed from 12 units to 16 units. SUBCLIN 0001AB has changed from 12 units to 16 units. All other terms and conditions remain unchanged. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to this procurement are considered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such asemail. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual documents as detailed herein. In accordance with DFAR 217.7301, Contractors shall identify their sources ofsupply in contracts for supplies. If the item currently being procured is anon-value added item, please provide: Actual Manufacturer: Cage Code: Address: Delivery Lead Time: __________________________ Offer valid for ___________________ days. Please provide email address for follow-up communications_______________________________________. Packaging location if different than Offeror: Name/Cage ___________________________________________ Address______________________________________________ NOTICE TO CONTRACTOR'S PROVIDING SURPLUS MATERIAL: A surplus material certificate and label MUST accompany your quotation forsurplus/new surplus/new manufactured surplus material. ALL surplus materialMUST have traceability back to a Government contract in order to be consideredfor award. Without this information we are unable to determine when theGovernment purchased and inspected the item and therefore, we cannot be assured of technical acceptability. If submitting your quotation via EDI, a faxed or email copy of the surpluscertificate, along with a photo of the box and label MUST be sent to the buyerASAP. It is recommended that vendors provide contact information to NAVSUP WSSMechanicsburg in order to receive automated notifications from Navy ElectronicCommerce Online (NECO) when contracts/modifications are issued by NAVSUP WSS and posted on EDA. To receive these notifications, contact: NAVSUP WSS Code 025, Procurement Systems Design and Contract Support Division via email at NAVSUPWSSITIMPHelpDesk@navy.mil. Please include the following information with your request: CAGE Code, company name and address and POC with phone number and email address. Contractors can view their orders, contracts and modifications at theElectronic Document Access (EDA) web tool. This web tool is located at the Wide Area Workflow (WAWF) website. It is recommended that contractors register for EDA at: https://wawf.eb.mil. Click on New User and Registration. The Department of Defense (DoD) has issued an interim rule (2019-D041), effective November 30, 2020, related to the cyber security requirements in DFARS 252.204-7012. The purpose of this new rule is to assess the cybersecurity protections each individual contractor has in place and includes the implementation of a DoD NIST SP 800-171 Assessment Methodology. The offeror, by submission of its quotation, represents the following, if DFARS clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, applies - (1) in accordance with DFARS provision 252.204-7019, it has implemented the NIST SP 800-171 security requirements for its information systems; and (2) its summary level scores are posted in the supplier performance risk system (SPRS) (https://www.sprs.csd.disa.mil/) in accordance with paragraph (d) of DFARS clause 252.204-7020, NIST SP 800-171 DoD assessment requirements. Failure to comply may result in being unable to award to the offeror. This order requires a Higher Level Inspection. Please review the attached DD1423 for special testing instructions. Please include a proposed schedule for all CDRLs with your quote. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;Seal Assembly, Dynamic (Dash 2); for use on NAVY submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 2.1.2 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The ""Document Changes"" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=6878927 |53711| A|FN |D|0001 | |49998|0687949 DRAWING DATA=6878928 |53711| -|FN |D|0001 | -|49998|0008458 DRAWING DATA=6878928 |53711| -|FN |D|0002 | -|49998|0005559 DRAWING DATA=6878928 |53711| -|FN |D|0003 | -|49998|0006388 DRAWING DATA=6878928 |53711| -|FN |D|0004 | -|49998|0006057 DRAWING DATA=6878928 |53711| -|FN |D|0005 | -|49998|0006588 DRAWING DATA=6878928 |53711| -|FN |D|0006 | -|49998|0006364 DRAWING DATA=6878928 |53711| -|FN |D|0007 | -|49998|0006696 DRAWING DATA=6878928 |53711| -|FN |D|0008 | -|49998|0005960 DRAWING DATA=6878928 |53711| -|FN |D|0009 | -|49998|0003779 DRAWING DATA=6878929 |53711| A|FN |D|0001 | A|49998|0842117 DRAWING DATA=6878930 |53711| -|FN |D|0001 | -|49998|0026768 DRAWING DATA=6878931 |53711| A|FN |D|0001 | |49998|0083215 DOCUMENT REF DATA=FED-STD-H28 | |20|B |941221|A| |01| DOCUMENT REF DATA=ADIPRENE L-167 | | | |900101|A| | | DOCUMENT REF DATA=MIL-STD-130N | | | |121116|A| |01| DOCUMENT REF DATA=QQ-N-281D | | | |851023|A|2 | | DOCUMENT REF DATA=ASME B46.1 | | | |190101|A| | | DOCUMENT REF DATA=QQ-B-654A | | | |840210|A|01| | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | | DOCUMENT REF DATA=MIL-I-45208A | | | |810724|A|1 | | DOCUMENT REF DATA=ISO9001 | | | |150915|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| 3. REQUIREMENTS 3.1 ;Design and Manufacturing - The ;Seal Assembly, Dynamic (Dash 2); furnished under this contract/purchase order shall meet the material, physical and mechanical requirements as specified on Drawing 6878927 (Dash 2) consisting of Item Nos. 1, 2, 4, thru 7, including associated specifications mentioned in this procurement.; 3.2 ;Marking Requirements - The supplier shall label each first article and production lot unit ;Seal Assembly, Dynamic (Dash 2); in according with Note 6 of Drawing 6878927. The supplier shall mark (bag or tag) each assembly with contract and assembly serial number per MIL-STD-130.; 3.2.1 ;The supplier shall mark and identify (bag or tag) each item numbers 1, 2, 5 and 6 of drawing 6878927 (dash 2) with the applicable drawing/part, contract, heat, lot or batch and serial number per MIL-STD-130 until installed in the designated assembly.; 3.3 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The first article testing/inspection procedure and approval are required for ;Seal Assembly, Dynamic (Dash 2);. Government approval is required prior to commencement of first article unit.; 3.4 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.ogilvie@navy.mil, Code 242MO after award of contract.; 3.4.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.5 Configuration Control - MIL-STD-973 entitled ""Configuration Management"", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.5.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.6 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a ""Warning Plate"" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110 ; 4.5 ;Surface Roughness - All surface finishes are in RMS measurements. Where the degree of surface roughness is indicated, the surface shall be free from all visible imperfections as defined by Standard ASME B46.1.; 4.6 ;Finishes Edges - Finished edges shall be in accordance with the applicable drawing requirements.; 4.7 ;Threads - Threads shall be inspected in accordance with FED-STD-H28/20 System 21 requirements. Thread inspection shall include the measurement and recording of the major diameter for external threads and the minor diameter for internal threads.; 4.8 ;Material Control - The supplier shall have an effective material control system that provides for certified quantitative mill or industrial laboratory reports of chemical and physical analysis by heat, lot or batch for raw material ordered production units. If the material(s) is subsequently heat-treated, a certification of physical analysis,after heat treatment, is also required for each heat, lot or batch. Also, where the applicable material specification calls out (e.g. corrosion resistance test, macro-etch test, etc.,) these test results shall also be reported on the applicable mill industrial laboratory report. The physical analysis shall establish the following properties for metallic part: Ultimate Tensile Strength, Yield Strength and Elongation. ; 4.9 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on the ;Seal Assembly, Dynamic (Dash 2); in accordance with the applicable drawings and their approved first article procedure. ; 4.9.1 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an NSWCPD representative has the option of being present during the first article testing/inspection.; 4.9.2 ;First Article Approval for Testing/Inspection Procedure and Acceptance - (Supplier Testing/Inspection). The supplier shall prepare and submit their First Article Testing/Inspection Procedure for ;Seal Assembly, Dynamic (Dash 2) in accordance with the requirements of DI-NDTI-80603 and the applicable drawings as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the procedure is required prior to commencement of first article unit. CDRL: FIRST ARTICLE TESTING/INSPECTION PROC per DI-NDTI-80603A; 4.9.3 ;First Article Visual/Dimensional Inspection - The supplier shall visually and Physically inspect 100% the first article unit (componenet parts/assembly) and record the actual measurements of each dimension and threads (also the major diameter for external threads and the minor diameter for internal threads) identified on the applicable drawings including hardness test on (Seal, p/n 6878929). Threads shall be inspected 100% and results recorded.; 4.9.4 ;First Article Testing/Inspection Reports and Acceptance - (Supplier Testing/ Inspection). The supplier shall submit for the first article unit, testing/ inspection reports in compliance with the requirements of DI-NDTI-80603 and the applicable drawings. The report shall also include a copy of ;Certified Mill Certification, Certificate of Compliance Material, Certificate of Conformance Material, Visual/Dimensional Inspection Report including a copy of the completed Assembly and Inspection Document 6878928 (Dash 2); identifiedin the Objective Quality Evidence Records Section of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the first article testing/inspection report is required prior to commencement of production units. CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.10 ;Production Lot. ; 4.10.1 ;Visual/Dimensional Inspection - The supplier shall visually and physically inspect 100% the production lot units (component parts/assemblies) and record the actual measurements of each dimension and threads (also the major diameter for external threads and the minor diameter for internal threads) identified on the applicable drawings including hardness test on (Seal, p/n 6878929). Threads shall be inspected 100% and results recorded.; 4.10.2 ;Production Lot Testing/Inspection Reports and Acceptance - (Supplier Testing/ Inspection). The supplier shall submit for the completed production units testing/inspection reports in compliance with the applicable Data Item Descriptions (DIDs) and drawings. The Production Lot Testing/Inspectionreport shall consist of ;Certified Mill Certification, Certificate of Compliance Material, Certificate of Conformance Material, Visual/Dimensional Inspection Report including a copy of the completed Assembly and Inspection Document 6878928 (Dash 2) and Mercury document and as indicated on the Production Lot Test/Inspection (PLT) Contract Data Requirements List(DD Form 1423). Government approval of the production lot testing/inspection report is required prior to shipment of production lot units. CDRL: PRODUCTION LOT TESTING/INSPECTION REPORT per DI-NDTI-80809b; 4.11 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this documentand as indicated on the Production Lot Testing/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units.; 4.12 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR. NSWCPD shall either issue Specific Government Inspection Instructions or Inspection Hold Points based on whether DCMA or NSWCPD will be performing the required Inspection/ Tests. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.; 4.13 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of raw material and finished parts. Records shall be traceable by drawing/part, heat, lot, batch, serial and contract number. All OQEDS shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.; 4.13.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/part, heat, lot, atch, serial and contract number. Supplier format is acceptable for the below listed CDRLs. a. Certified Quantitative Mill Certification or Industrial Laboratory Certification (chemical and physical analysis for Item Nos. 1, 5 and 6 of drawing 6878927). CDRL: CERTIFIED QUANTITATIVE MILL CERTIFICATION per DI-MISC-80678 b. Certificate of Compliance for Materials: (1) Certifying drawing 6878929 material Adiprene L-167 to drawing requirements. (2) Certifying drawing 6878927, Item 4 material Epoxy Adhesive 1751 A/B to drawing requirements. CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-80678 c. Certificate of Conformance for Material (certifying Item No. 7 of drawing 6878927 to drawing and Specification QQ-B-654 requirements). CDRL: CERTIFICATE OF CONFORMANCE per DI-MISC-80678 d. Visual/Dimensional Inspection Report shall show all the characteristics, the actual measurement results of each dimension inspected (component parts/ assemblies) including threads (also the major diameter for external threads and the minor diameter for internal threads), hardness test, contract number, name of supplier, drawing/part number, drawing revision letter, heat , lot batch and serial number of finished part and assembly, item nomenclature, inspector's acceptance signature and date. The supplier shall include a copy of the completed Assembly and Inspection Document 6878928 (Dash 2). The supplier shall annotate the contract, assembly part and assembly serial number on the completed Assembly and Inspection Document 6878928. CDRL: DIMENSIONAL INSPECTION REPORT per DI-NDTI-80809B e. Mercury Exclusion Certification (Representing the contract units shipment) CDRL: MERCURY EXCLUSION CERTIFICATION per DI-MISC-80678 ; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for ""Official Use Only"" and ""NOFORN"" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE QUALITY INSPECTION PLAN BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A001. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;; DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A002. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;; DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A003.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;; DATE OF FIRST SUBMISSION=ASREQ ;;SUPPLIER FORMAT IS ACCEPTABLE;; ;;PLT REPORT SHALL CONSIST OF OQED RECORDS LISTED IN CONTRACT SECTION E: CERTIFIED MILL CERTIFICATE; CERTIFICATION OF COMPLIANCE MATERIAL; CERTIFICATE OF CONFORMANCE MATERIAL; VISUAL/DIMENSIONAL INSPECTION REPORT INCLUDING A COPY OF THE COMPLETED ASSEMBLY & INSPECTION DOCUMENT 6878928 (DASH 2) AND MERCURY EXCLUSION CERTIFICATION.;; ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;;
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/2dca0016c155478f9f8445c7cd00d9c6/view)
 
Record
SN06359443-F 20220617/220615230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.