Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 24, 2022 SAM #7511
MODIFICATION

38 -- Crack Sealer W912EF22Q0161

Notice Date
6/22/2022 11:48:17 AM
 
Notice Type
Solicitation
 
NAICS
333120 — Construction Machinery Manufacturing
 
Contracting Office
US ARMY ENGINEER DISTRICT WALLA WAL WALLA WALLA WA 99362-1876 USA
 
ZIP Code
99362-1876
 
Solicitation Number
W912EF22Q0161
 
Response Due
7/5/2022 11:00:00 AM
 
Archive Date
07/20/2022
 
Point of Contact
Amber Pope, Phone: 5095277223
 
E-Mail Address
amber.r.pope@usace.army.mil
(amber.r.pope@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
TECHNICAL SPECIFICATIONS Ice Harbor Lock and Dam Trailer Mounted Crack Sealer 1. �Scope of Work The Contractor shall procure a trailer mounted crack sealer.� The contractor will deliver the trailer and provide a basic overview of how the crack sealer operates and the features of the machine. 2. �Specifications The crack sealer shall be a new, currently produced model, trailer mounted crack sealer meeting the following specifications. Single axle trailer mounted crack sealer that meets all DOT specification for highway class travel All lighting on trailer will be sealed LED�s and weatherproof connectors on all lights 125�150-gallon capacity for all grades of asphalt rubber sealants Diesel powered 3-cylinder direct injected tier 4 engine and self-igniting diesel heated with a pump and capable of bringing the material to pouring temperate from air temp within one hour and rated at 250,000 BTU The manufacturer shall warranty the equipment for a period of one year Must have a locking engine cover Single mast mounted LED strobe 10lb fire extinguisher mounted on trailer with suitable bracket Full size spare tire mounted to trailer that matches the other two tires Must have sealant agitation and recirculation ability 2 sets of operations manuals and parts lists must be furnished with the unit A factory-trained representative will provide basic operation instruction to on-site staff within 5 business days of delivery of machine Electric heated sealing hose that is at least 20 feet in length with a ball valve to minimize dripping and waste and a 2.5-inch swivel disk will be included Tank will be the double boiler design Tank must be insulated on all sides 2� or 2 5/16� hitch provided Swing-away weight appropriate adjustable screw jack Electric brakes, emergency breakaway switch, radial tires, and safety chains with slip hooks A seven pin flat RV round plug will be included 3. �Shipment and Delivery The contractor shall delivery the new trailer mounted crack sealer to Tri Rivers Natural Resources Maintenance Yard within 90 days of award of this contract.� All deliveries will be coordinated with the Corps POC Brandon Frazier, 541-314-2070, at least 1 week prior to delivery.� No shipments will be allowed other than normal business hours of Monday-Thursday 7:30AM-4:00PM PST, excluding federal holidays. All shipments shall be delivered to: US Army Corps of Engineers Tri Rivers Natural Resources Attn: Brandon Frazier 1215 E Ainsworth Pasco WA, 99301
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a202a901706040348ee41b390345ff9f/view)
 
Place of Performance
Address: Pasco, WA 99301, USA
Zip Code: 99301
Country: USA
 
Record
SN06364676-F 20220624/220623060610 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.