Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 24, 2022 SAM #7511
SOURCES SOUGHT

99 -- 175' WLM GYROCOMPASS

Notice Date
6/22/2022 11:34:53 AM
 
Notice Type
Sources Sought
 
NAICS
334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
 
Contracting Office
SFLC PROCUREMENT BRANCH 3(00040) BALTIMORE MD 21226 USA
 
ZIP Code
21226
 
Solicitation Number
175GYRO
 
Response Due
7/22/2022 11:00:00 AM
 
Archive Date
07/22/2022
 
Point of Contact
Kelly Wyatt, Phone: 4438676131
 
E-Mail Address
kelly.a.wyatt@uscg.mil
(kelly.a.wyatt@uscg.mil)
 
Description
The U.S. Coast Guard (USCG) Surface Force Logistics Center (SFLC), In-Service Vessel Sustainment (ISVS) Section, in support of the 175 WLM Major Maintenance Availability (MMA) is releasing this Request for Information (RFI) to gather information related to commercially-available solutions associated with the Gyrocompass. Request for Information (RFI) Only. This RFI is issued solely for information and planning purposes � it does not constitute as a Request for Proposal (RFP) or a promise to issue an RFP in the future. This request for information does not commit the Government to contract for any supply or service. Further, the Government is not at this time seeking proposals and will not accept unsolicited proposals. The Government will not pay for any information or administrative costs incurred in response to this RFI; all costs associated with responding to this RFI will be solely at the interested party�s expense. The USCG 175 WLM MMA will include an upgrade of the existing Gyrocompass that includes the capacities as shown in the requirements below.� A Sustainment Conference was conducted leading up to the planning of the 175 WLM MMA and Design Study Reports were conducted to determine the intended work items.� The Gyrocompass was identified as a high priority work item to ensure the Cutters remain mission ready and maintainable throughout their service life. Requirements General The gyrocompass shall be Fiber Optic Gyrocompass (FOG) or other comparable non-mechanical gyrocompass technology. The gyrocompass shall not utilize rotating or moving parts. The replacement gyrocompass system shall be maintenance-free and require no periodic calibration. Performance The new gyrocompass shall at least meet the following performance requirements: Accuracy:� Heading 0.1� deg. x Secant Latitude Roll/Pitch Range:� � 180� Dynamic Motion:� Roll -� � 45� ���� Pitch - � 45� Speed:� -10 to 90 Knots Settling Time:� < 30 minutes (full accuracy), unaided. As defined in IMO ��������������� A.424(X1) and A.821(19) resolutions. Rate:� < 90 degrees/second Availability:� Gyro shall continue to output data in an alarm state if heading accuracy is + or - .2 - .5 degree MTBF shall exceed 50,000 hours Environmental The gyrocompass at a minimum shall meet the following environmental conditions: Operating Temperature:������������������� -20�C to +55�C (-4�F to +131�F) Storage Temperature:����������������������� -40�C to +80�C (-40�F to +176�F) Humidity������������������������������������������ 0% to 90%, relative, non-condensing Vibration:����������������������������������������� MIL-STD-167, type I Noise:� MIL-STD-740-1 Grade C Airborne MIL-STD-740-2 Type 3 Structure Interface Requirements The following systems shall use the gyrocompass data: SPS-50 Radar Electronic Charting Display and Information System (ECDIS) Autopilot Dynamic Positioning System (DPS) Scalable Integrated Navigation System 2 (SINS-2) Heading Repeater interfaces CG Machinery Control System (MCS) Physical Dimensions Maximum dimenstions � 15inch wide x 20inch high x 15inch depth fully assembled Electric Power Requirements The gyrocompass and data distribution units shall be capable of operation from a nominal 24VDC source. Requested Information Interested parties are requested to respond to this RFI with the following information (including drawings where applicable): OEM/Make/Model of proposed components Capacity Performance Parameters Overall dimensions Dimensions of major components Mounting dimensions (footprint) and arrangement Maintenance envelope Locations of external connections (electrical, control, etc.) Overall weight (as installed) List of standard equipment Available options Environmental requirements (temperature, humidity, vibration, etc.) Power rating (continuous duty and overload) Description of monitoring and control features Diagnostics, alarms, interlocks, and shutdowns Remote M&C capabilities (inputs/outputs) Availability Supportability and tech services within United States Time in production Estimated timeframe for removal from production Warranty options Standard testing/certification Maintenance requirements and frequency Distributor/dealer support network Lead time for parts and services Recommended spare parts Applicable industry standards and certifications Business size Concerns with 10-year contract
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/3f29794b2f71437683215b4db799fbfc/view)
 
Record
SN06366073-F 20220624/220623060619 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.