Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 25, 2022 SAM #7512
SOLICITATION NOTICE

Y -- LOWER WICOMICO RIVER MAINTENANCE DREDGING

Notice Date
6/23/2022 8:31:18 AM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST BALTIMORE BALTIMORE MD 21201-2526 USA
 
ZIP Code
21201-2526
 
Solicitation Number
W912DR22B0018
 
Response Due
8/8/2022 8:00:00 AM
 
Point of Contact
Carrie Lowber, Phone: 4109626749, Katie R. Marrette, Phone: 4109620147
 
E-Mail Address
carrie.a.lowber@usace.army.mil, katie.r.marrette@usace.army.mil
(carrie.a.lowber@usace.army.mil, katie.r.marrette@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
PRE-SOLICITATION NOTICE SOLICITATION: W912DR22B0018 Lower Wicomico River Maintenance Dredging at�Wicomico County, MD This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237990 �Other Heavy and Civil Engineering Construction� with a size standard of $39,500,000.00.� Total 100% Small Business Set-aside. Project Description: The U.S. Army Corps of Engineers, Baltimore District (NAB), has been tasked to solicit for and award construction services for a dredging project entitled, Lower Wicomico River Maintenance Dredging, Wicomico County, MD. The place of performance is in Wicomico and Somerset Counties, Maryland. Material will be placed beneficially for wetland restoration at the Deal Island Wildlife Management Area (WMA) located in Somerset County, MD.� The proposed project will be a competitive, firm-fixed-price, contract procured in accordance with FAR 14, Sealed Bidding, via an Invitation for Bid (IFB). SCOPE: This project is to include the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable over depth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. The pipeline will be placed atop the existing berm at the WMA impoundment and a diffuser shall be used at multiple locations to place the material at a lower velocity into the placement site.� The outflow of the pipeline shall be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 70 acres of land will be restored.� Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. Wetland restoration is meant to increase migratory bird nesting habitat. To ensure the restoration goals are met the placement location shall also include placing straw bales as natural containment around the southern end of the placement site. The straw bales are to act as containment for dredged material placed for wetland restoration and increasing migratory bird nesting habitat. Approximately 11,000 strawbales will be used stacked two high with an additional single stacked row at the interior of the placement site to provide proper containment of the dredged material. Tidal ditch plugs shall be constructed in areas of high erosion or open water. Approximately 20 ditch plugs of varying size are to be constructed. After dredged material placement, vegetation will be planted to restore the wetland. Planting of vegetation will occur over the two growing seasons post dredged material placement. Vegetation will be Spartina patens and Distichlis spicata, and possibly a smaller amount of Panicum. Vegetation the first growing season may require aerial seeding, based on consolidation of the dredged material. Vegetation the first growing season shall also require the exterior edge only to be hand planted to provide stabilization, with interior planting occurring the second growing season once material has consolidated. The magnitude of construction is between $5,000,000 and $10,000,000. Construction duration is approximately 24 months from Notice to Proceed (NTP).� Additional information in accordance with the statement of work will be included in the IFB package. This solicitation will be available on or about 8 July 2022, bids due on or about 8 August 2022 by 11:00 am. The solicitation will be provided in an electronic format, free of charge to all authenticated account holders of the SAM.gov system. Please note that all USACE acquisitions are considered sensitive, but unclassified documents. Vendors must be registered with the System for Award Management (SAM) database to receive a government contract award. Vendors must also be registered in Representations and Certifications Applications (included in SAM). The North American Industry Classification System (NAICS) Code (237990) applicable to this acquisition must be in vendor�s SAM registration. Note: Update SAM profile to include all applicable NAICS Codes associated with your company. Vendors may register for SAM online at www.sam.gov or by calling 1-866-606-8220.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/ed498e0bc64a4726892b6cf5a4bd178b/view)
 
Place of Performance
Address: Deal Island, MD 21821, USA
Zip Code: 21821
Country: USA
 
Record
SN06366909-F 20220625/220623230121 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.