Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 29, 2022 SAM #7516
SOURCES SOUGHT

91 -- FUEL REMOVAL - VA MEDICAL CENTER WILMINGTON

Notice Date
6/27/2022 11:42:02 AM
 
Notice Type
Sources Sought
 
NAICS
562211 — Hazardous Waste Treatment and Disposal
 
Contracting Office
244-NETWORK CONTRACT OFFICE 4 (36C244) PITTSBURGH PA 15215 USA
 
ZIP Code
15215
 
Solicitation Number
36C24422Q0871
 
Response Due
6/30/2022 9:00:00 AM
 
Archive Date
08/14/2022
 
Point of Contact
Derrick.Maruski2@va.gov, Derrick L. Maruski, Phone: (215) 823-5253
 
E-Mail Address
Derrick.Maruski2@va.gov
(Derrick.Maruski2@va.gov)
 
Awardee
null
 
Description
STATEMENT OF WORK (SOW) I. Purpose The Wilmington VA Medical Center (VAMCW or the facility) has a need to properly dispose/recycle of approximately 18,000 gallons of No. 2 oil/heating oil (boiler plant tank) and 9,000 gallons of diesel fuel from underground and above ground storage tanks associated to emergency generators (EGs) and fire pump as identified by the Table 1 of this SOW due to elevated sulfur content in fuel. All units identified by the Table 1 except Bld. 15 s EG tank need to be filled with new fuel with sulfur content equal to or less than 15 ppm. Other job responsibilities are identified by the Action/Remediation section of the Table 1. It is the facility s understanding that the elevated sulfur content in fuel cannot be resolved by fuel polishing alone. The Action/Remediation described by the Table 1 below is necessary to comply with the state and/or federal regulations and the Joint Commissions (JC) standards. The VAMCW is seeking a contractor to facilitate all tasks identified by this SOW. The VAMCW is located at 1601 Kirkwood Hwy, Wilmington, DE 19805. All underground (UST) and above ground (AST) storage tanks are located at the Kirkwood Hwy location within close proximity. To maintain facility readiness and capabilities during emergency situations, the VAMCW is also seeking contractor to have additional Ultra Low Sulfur Diesel (ULSD) fuel available for use at the site during Action/Remediation process described by the Table 1 of this SOW. II. Period of Performance The prosed project does not have any option year contracts. III. Services & Requirements and Initial Fuel Delivery The contractor shall submit safety and spill prevention plans to project COR (contract officer representative) and VAMCW Safety Manager for carrying out the requirements of this document. The spill prevention and safety plans including confined space entry must be approved by the VAMCW before project can start. All tanks identified by the Table 1 will be filled up with new ULSD to a maximum 90% capacity or as recommended by the manufacturer s specification. Contractor will be required to remove all over-fill fuel if the monitoring system detects the tank is filled over 90% forcing it to alarm. Contractor is responsible for the removal and cleanup of all fuel that is spilled during the fuel disposal or refueling process. This will include any fuel spilled in all underground storage tank sump containments. Facility staff will continually monitor the contractor during the fulfillment of all services rendered under this contract to ensure compliance with this requirement. All spill response efforts must be in compliance with DNREC, Delaware Emergency Response Program or any other applicable local regulations. All discarded fuel will be transported out of the facility, recycled, or disposed of by the contractor with no additional cost to VAMCW. All fuel credits for waste fuel will be applied to services rendered as part of this contract or issued directly to the facility. All delivered fuel oil or diesel fuel will have a sulfur content equal to or below 15 ppm (0.0015% by weight) which will be confirmed by the contractor by providing copies of the fuel manifest from each fuel delivery to the site during the Action/Remediation process identified by the Table 1 of this document. In addition, within 60 calendar days of the project completion, the contractor shall provide third-party testing on the fuel in the tanks listed in this document that complies with ASTM D, NFPA 110 and the Joint Commission requirements for mission critical equipment. Appropriate remediation is required by the contractor if the required sulfur content is not achieved. The facility s goal from this project is to achieve compliance with the JC standards for fuel quality including sulfur content in fuel and to comply with the State/EPA requirements for ULSD that can be burned on the fuel burning equipment. The contractor shall discuss with the contracting officer and the facility COR prior to the actual work if the proposed actions by this SOW may not help to achieve facility s goal. The contractor s technician(s) assigned to provide the services required under this document must have all applicable valid training certificates. IV. Scheduling of Services All work completed under this contract will be required to be scheduled in close coordination with the COR and the contractor. Contractor will be responsible for emptying tanks as scheduled and approved by the COR. Scheduling may be staggered to accommodate scheduling requirements of the facility and maintain sufficient fuel onsite to maintain facility readiness for emergency purposes and allow all fuel tanks to be cleaned before fuel replenishment. The COR and other facility staff will attempt to give contractor as much lead time as possible when scheduling the removal of all waste fuel and refueling of facility fuel tanks after they have been cleaned however this may not always be possible. All or part of Action/Remediation processes outlined by the Table 1 may need weekend works to minimize traffic and safety issues. The weekend work schedule must be consulted with the COR in advance. 6. It is of great importance that the facility maintain compliance with VHA requirements of maintaining facility readiness for emergency situations including maintaining adequate backup fuel sources on premises. As a result, the contractor will be responsible for having fuel in sufficient quantities to fill all underground storage tanks and generator tanks immediately after tank cleaning is completed. Table 1: Tank Location, Capacity and Action/Remediation Item # Location/Unit Tank type Tank capacity (gal) 90% of tank capacity (gal) Action/Remediation 1 Boiler Plant USTTank #1-East UST 20,000 18,000 Remove existing fuel from the tank. Transport existing fuel from the medical center to disposal/recycling facility. Provide cleaning of the empty tank including bottom cleaning of the tank. Refuel clean tank with ULSD up to 90% of the tank capacity or as recommended by the manufacturer spec to comply with the State and EPA regulations. Treat new fuel (add stabilizer & biocide) Sample and analyze new fuel from the tank or service line within 60 calendar days from refueling. Submit report with sampling results to facility COR within 30 calendar days from sampling date. 2 Bld. 7 EG tank SBT 2,500 2,250 See Action/Remediation above for Item #1 3 Bld. 15 EG tank SBT 2,000 1,800 No fuel replacement. Treat existing fuel with stabilizer & biocide; sample and test fuel 4 Bld. 17 EG tank UST 2,500 2,250 See Action/Remediation above for Item #1 5 Bld. 18 EG tank UST 2,000 1,800 See Action/Remediation above for Item #1 6 Bld. 19 EG tank UST 2,500 2,250 See Action/Remediation above for Item #1 7 Bld. 1-Ground floor Fire Pump AST 500 450 See Action/Remediation above for Item #1 Notes: Bld. 15 EG (Emergency Generator): No fuel replacement is recommended based on the last sampling results. 2. Old fuel will be transported to recycling/disposal facility by the contractor with no additional cost to VAMCW. Fuel disposal/recycling shall comply with all applicable local, state, and federal regulations. Copies of the documentations including waste manifest shall be provided to the facility COR within 30 calendar days from the project completion showing compliance with all applicable regulations.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/5362fd9329c04278abda4b25d2f74b37/view)
 
Place of Performance
Address: Department of Veterans Affairs VA Medical Center - Wilmington 1601 Kirkwood Highway Wilmington, DE 19805, USA
Country: USA
 
Record
SN06370813-F 20220629/220627230104 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.