Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 01, 2022 SAM #7518
SOLICITATION NOTICE

Y -- Correct SPS Deficiencies 610A4-20-513

Notice Date
6/29/2022 1:44:22 PM
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
250-NETWORK CONTRACT OFFICE 10 (36C250) DAYTON OH 45428 USA
 
ZIP Code
45428
 
Solicitation Number
36C25022B0062
 
Response Due
7/29/2022 8:30:00 AM
 
Archive Date
09/27/2022
 
Point of Contact
Eric Sweatt, Contract Specialist, Phone: 317-988-1511
 
E-Mail Address
eric.sweatt@va.gov
(eric.sweatt@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
Correct SPS Deficiencies Project: 610A4-20-513 VA Northern Indiana Health Care System (VANIHCS) Ft. Wayne, IN Project Background: The new Sterile Processing Service (SPS) area has struggled with maintaining the proper negative and positive pressure in rooms since it was built. This project will correct the HVAC deficiencies inside of SPS. Statement of Work: Contractor will provide all labor, equipment, materials, and supervision necessary to Correct SPS Deficiencies, Building 1 at the Fort Wayne campus of the VANIHCS following the A/E s design drawings to include but not limited to the following: Correct negative and positive pressures inside of SPS, add a door and several door closures to the SPS breakroom, add a door and door closure to the scope decontamination room, build an equipment storage room inside of SPS and correct the balance in the warehouse and corridor C3 and conference room B106E, and SPS staff office. The SPS and warehouse areas were constructed post-2015. The VA shall provide the most recent hazardous survey. This report is merely a starting point and should not be considered to have captured every area. The project is divided into 6 areas per the A/E s drawings. The areas do not have to be completed in sequence and can be completed concurrently. As a working hospital, the adjacent spaces and functions will need to be maintained and a high degree of coordination, scheduling, and phasing will be required to allow the continuation of the existing hospital services during the entire construction project. Corridors shall not be blocked during normal business hours. Phase I shall be bid as after-hour or weekend work. Working inside of the SPS department will require SPS to be shut down. Work is expected to take 45 calendar days inside of SPS and another 45 calendar days of work outside of SPS. The total project should not exceed three months of construction. All work is to be completed at the VA Northern Indiana Health Care Fort Wayne Campus, 2121 Lake Ave, Fort Wayne, IN 46805. Work to be completed within 95 calendar days from notice to proceed. Justification of Work: This project is designed to correct the SPS room pressure deficiencies to allow the VA and SPS to work in a more climate-controlled cleaning environment. This in turn will provide a world-class scope cleaning environment to ensure the cleanest possible items are being used on our Veterans.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/214fa1bab5734f4b9e950c50328910c1/view)
 
Place of Performance
Address: Department of Veterans Affairs Network Contracting Office 10 VA Northern Indiana Health Care System (VANIHCS) 2121 Lake Avenue, Fort Wayne, IN 46805, USA
Zip Code: 46805
Country: USA
 
Record
SN06373307-F 20220701/220629230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.