Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 02, 2022 SAM #7519
SOURCES SOUGHT

C -- Construct Centralized Chilled Water Plant 589A7-21-131

Notice Date
6/30/2022 11:58:12 AM
 
Notice Type
Sources Sought
 
NAICS
541330 — Engineering Services
 
Contracting Office
255-NETWORK CONTRACT OFFICE 15 (36C255) LEAVENWORTH KS 66048 USA
 
ZIP Code
66048
 
Solicitation Number
36C25522Q0387
 
Response Due
7/13/2022 1:00:00 PM
 
Archive Date
10/11/2022
 
Point of Contact
Sean Jackson, Contracting Officer, Phone: 913-946-1126
 
E-Mail Address
sean.jackson@va.gov
(sean.jackson@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
Title: Construct Centralized Chilled Water Plant and Associated Infrastructure and Controls Systems Project 589A7-21-131 for the Wichita VA Medical Center, Wichita, Kansas Solicitation Number: Agency: Department of Veterans Affairs Contracting Office: Network Contracting Office 15 Contracting Office Location: 3450 S 4th Street Traffic way, Leavenworth, Kansas Type of Notice: Sources Sought Posted Date: 6/30/2022 Response Date: 7/13/2022 at 3:00 PM Central Time Set Aside: Service-Disabled Veteran Owned Small Business Classification Code: C-Architect and Engineering services NAICS Code: 541330 Engineering Services Synopsis: Please note that this is NOT a request for SF330's or proposals, the Government is seeking information for market research purposes only. The Government may or may not issue solicitation documents. The Department of Veterans Affairs Network Contracting Office (NCO) 15, is conducting a market survey for qualified: Service-Disabled Veteran Owned Small Businesses (SDVOSB), capable of providing the required services outlined below for the VA Medical Center located in Wichita, Kansas. The applicable NAICS code 541330 Engineering Services and the size standard is $22.5 Million. Responses to this notice must be submitted via e-mail and received no later than July 13, 2022 at 3:00 PM Central Time. No telephone inquiries will be accepted or returned. Additional information about this project will be issued on the Federal Business Opportunities website https://www.fbo.gov once available. Prospective SDVOSB firms are reminded that in accordance with VA Acquisition Regulation (VAAR) 852.219-10, at least 50 percent of the cost of personnel for contract performance of the contract shall be spent for employees of the SDVOSB concern or employees of other eligible service-disabled veteran-owned small business concerns. The prime architect shall provide written certification of this to the Contracting Officer with the response provided for this market research. SCOPE OF DESIGN/CONSTRUCTION PROJECT: A/E shall be required to provide all technical and engineering disciplines as needed to meet project requirements as outlined. The project will consist of, but is not limited to, construction of an N+1 centralized chiller plant and creates a campus wide chilled water supply and return loop. The project will remove approximately 17 small chillers serving various buildings throughout the campus. Work includes associated building controls, building service equipment, piping, electrical, and modifications to support appropriate supply and connections at building service points. May include renovation or demolition and construction of a new utility building to house new chillers and systems. A/E will review VA furnished asbestos survey to identify known areas of remediation. The A/E shall conduct a study to supplement VA furnished survey to identify additional possible asbestos and/or lead contamination. The A/E will be responsible for all specifications and cost estimations associated with remediation required as part of the design period of services. Construction shall include the abatement of any hazardous materials as identified on the provided drawings. Construction contractor shall be responsible for third party air monitoring services to be provided during remediation of hazardous materials (i.e. asbestos, lead, mold, etc). Remediation shall be performed by the construction contractor. The construction of this project will take place in a very busy occupied campus and is to be completed to allow medical care functions to be maintained uninterrupted throughout construction necessitating carefully phased construction and coordination with VA COR/users. The A/E shall make investigations necessary to thoroughly evaluate the area, including interviewing the staff impacted because of this project. All design shall be in accordance with A/E Submission Instructions for Minor and NRM Construction Program, Program Guide PG-18-15, Volume C, all VA supplemental physical security directives, and provide commissioning in accordance with VA whole building commissioning manual requirements. A/E shall work in collaboration with VHA staff and State Historic Preservation Organization, SHPO, to mitigate and come to agreeable terms for historic buildings on the campus for any construction that may disrupt or change the appearance of historic buildings in the historic registry. The A/E shall produce documentation that they will upload to the SHPO website that clearly states the agreed upon terms. The A/E shall apply for SHPO approval at their web site, https://www.kshs.org/shpo, then provide the Government documentation of application and SHPO approval letter prior to changes to buildings, building material or landscapes. A/E shall design to Guiding Principles Compliance and Validation requirements within VA Sustainable Design Manual. Project shall follow Internal Certification for NRM projects A/E to complete checklist and supporting documents and provide a copy to COR as well as email final check list to VA s Green Management Program (GMP) at Energy@va.gov . Design multiple deductive bid alternates into the construction documents equal to at least 20% of the total construction cost (Design Limitation) not including contingency. The base design must be fully functional with or without the alternates. Provide an itemized cost estimate associated with each deduct alternate. Bid deduct alternates will reflect the appropriate reduction in project completion time (days). Each subsequent design submission shall incorporate all required changes/corrections from the previous set. A/E shall furnish summary of changes with comments on concurrence or reason change was not incorporated (i.e. code or VA requirements). Anticipated time for completion of design is 258 calendar days including time for VA reviews. In accordance with VAAR 836.204, the estimated magnitude of the resulting construction price range is estimated to be between $20,000,000.00 and $50,000,000.00. The North American Industrial Classification System (NAICS) code is 541330, Engineering Services, small business size standard of $22.5 Million in average annual receipts for the preceding three years. Interested firms must be registered in https:www.SAM.gov with this NAICS code and qualified as a service disabled veteran owned small business under this NAICS code. Qualified service-disabled veteran owned small businesses are encouraged to respond and required to be registered in the VetBiz registry https://www.vetbiz.va.gov/ on or before the response date. In order to be considered, the A/E must have a working office located within 450 miles of the Wichita VA Medical Center located at 5500 E. Kellogg Ave, Wichita, Kansas 67218. The proximity of each firm which would provide the professional services and familiarity with the area in which the project is located. This distance is determined according to http://maps.google.com/ The response to this notice shall be in summary format and shall not exceed ten (10) total pages and include the following: Company name, DUNS number, verification of social economic category (SDVOSB), address, point of contact, telephone number and email address, sample information on same or similar type projects completed. No basis for claim against the Government shall arise as a result of a response to this sources sought or Government use of any information provided. The Government will not pay for information or comments provided and will not recognize any costs associated with submission of comments. There is no guarantee, expressed or implicit, that market research for this acquisition will result in a particular set-aside, or any other guarantee of award or acquisition strategy. Responses must be received by 3:00 PM Central on July 13, 2022 via e-mail to the Contracting Officer at sean.jackson@va.gov. PLEASE REFERENCE ""SOURCES SOUGHT: Construct Centralized Chilled Water Plant and Associated Infrastructure Controls Systems 589A7-21-131"" IN THE SUBJECT LINE and cover sheet. Respondents will not be contacted regarding their submission or information gathered as a result of this Sources Sought notice. Interested firms shall be required to respond to additional announcements separately from this announcement without further notice from the Government when posted to the Contract Opportunities website at https://sam.gov/. The Contract Opportunities website is the only official site to obtain these documents. Contracting Office Address: Department of Veterans Affairs; Network 15 Contracting Office; 3450 S. 4th Street, Leavenworth, KS 66048 Point of Contact(s): Sean Jackson, Contracting Officer e-mail address: sean.jackson@va.gov
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/fb593410176640dab0538b94c9260cc3/view)
 
Place of Performance
Address: Robert J Dole VA Medical Center 5500 E Kellogg, Wichita, KS 67218, USA
Zip Code: 67218
Country: USA
 
Record
SN06376017-F 20220702/220630230213 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers