SOLICITATION NOTICE
Y -- Central Everglades Planning Project (CEPP) Contract 11A, Everglades Agricultural Area (EAA) A-2 Reservoir Foundation & Cutoff Wall Project
- Notice Date
- 7/8/2022 12:45:29 PM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT JACKSONVI JACKSONVILLE FL 32207-0019 USA
- ZIP Code
- 32207-0019
- Solicitation Number
- W912EP22R0005
- Response Due
- 7/25/2022 11:00:00 AM
- Archive Date
- 08/09/2022
- Point of Contact
- Martha Sequeira, Phone: 9042321792, James T. Tracy, Phone: 9042322107
- E-Mail Address
-
martha.g.sequeira@usace.army.mil, James.T.Tracy@usace.army.mil
(martha.g.sequeira@usace.army.mil, James.T.Tracy@usace.army.mil)
- Description
- The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11A, Everglades Agricultural Area (EAA) A-2 Reservoir Foundation & Cutoff Wall Project, Palm Beach County, Florida. Preproposal Conference A Pre-Proposal Conference will be held on Wednesday, 22 June 2022 from 10:00am - 11:00am, EST via teleconference. The call-in number is: 1-844-800-2712 and the ACCESS CODE is: 199 227 9920## https://usace1.webex.com/meet/james.t.tracy * It is requested that an email be sent to martha.g.sequeira@usace.army.mil to confirm attendance by your organization. Scope of Work The Scope of Work for this project includes the following features: Clearing, grubbing, de-mucking, blasting, foundation preparation, installation of a seepage cutoff wall, canal backfilling, and all incidental related work to prepare approximately 15.3 miles of foundation for a 17.3 miles-long embankment dam, to be constructed under separate contract within the Everglades Agricultural Area (EAA). The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Dewatering will be required to control the groundwater and conduct work in the dry in accordance with contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and provided to the USACE for construction of these project features. ESTIMATED MAGNITUDE OF CONSTRUCTION: $250,000,000 and $500,000,000 ESTIMATED PERIOD OF PERFORMANCE: 2,044 calendar days NAICS: 237990 SIZESTANDARD: $39,500,000 PROPOSAL REQUIREMENTS: Award will be made to the offeror whose proposal represents the best value to the government utilizing best value source selection procedures. Proposals will be evaluated in the areas of Technical Merit, Past Performance, Small Business Participation, and Price. ATTACHMENTS: VOL1, VOL2, PLANS
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/e41a7e5db17e40328b745cbd9820e113/view)
- Place of Performance
- Address: Palm Beach, FL, USA
- Country: USA
- Country: USA
- Record
- SN06382716-F 20220710/220708230104 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |