Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 22, 2022 SAM #7539
MODIFICATION

99 -- MNA Hatch Cover Assembly

Notice Date
7/20/2022 9:03:18 AM
 
Notice Type
Solicitation
 
NAICS
332312 — Fabricated Structural Metal Manufacturing
 
Contracting Office
US ARMY ENGINEER DISTRICT WALLA WAL WALLA WALLA WA 99362-1876 USA
 
ZIP Code
99362-1876
 
Solicitation Number
W912EF22Q0151
 
Response Due
8/2/2022 2:00:00 PM
 
Archive Date
09/30/2022
 
Point of Contact
Richard A. Harvey, Phone: 5095277504
 
E-Mail Address
richard.a.harvey2@usace.army.mil
(richard.a.harvey2@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
SCOPE OF WORK It is the intent of the US Army Corps of Engineers to award a contract to have ONE (1) 4A VBS Hatch Cover assembly, Mounting Hardware, and Support Beam supplied to McNary Dam. � FABRICATION OF VBS HATCH COVER ASSEMBLY �The Contractor shall manufacture ONE (1) 4A Hatch Cover assembly. �VBS Hatch Cover Manufacturing� Manufacture ONE (1) hatch cover per drawings S-401. All concrete shall meet specifications 03 40 00.00 28 PRECAST CONCRETE. All steel shall meet specifications 05 05 23.00 28 STRUCTURAL STEEL, METALWORK FABRICATION, AND WELDING. VBS Structural Support Assembly Manufacture ONE (1) hatch cover support assembly per drawing S-402 All steel shall meet specifications 05 05 23.00 28 STRUCTURAL STEEL, METALWORK FABRICATION, AND WELDING. VBS Hardware package Supply ONE (1) set of any hardware needed for the VBS hatch cover and structural support assembly. All hardware shall meet specifications 03 40 00.00 28 PRECAST CONCRETE. All hardware shall meet specifications 05 05 23.00 28 STRUCTURAL STEEL, METALWORK FABRICATION, AND WELDING. 3.0�� SUBMTTTALS After acceptance, submittals must include approval drawings for tooling fabrication and seal assembly. NOTE:� The Government Technical Point of Contact for this requirement is Mr. Michael Timm.� He can be reached at (541) 922-1347 or email to Michael.b.timm@usace.army.mil.� Mr. Timm will conduct a site visit during production of the hatch cover to ensure the cover and all accessories meet our technical specifications and all requirements therein. SHIPMENT AND DELIVERY The seal assemblies shall be delivered as FOB Destination. The Contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to McNary Lock and Dam.� Delivery of all components shall be within FOURTEEN (14) weeks of award of contract.� Shipments are only allowed during normal business hours of Monday � Thursday 7:00am to 4:00pm. All shipments shall be delivered to: ��������������� McNary Lock and Dam ��������������� 82790 Devore Rd. ��������������� Umatilla, OR 97882
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/9113cbd719704df781446d06b4ed560b/view)
 
Place of Performance
Address: Umatilla, OR 97882, USA
Zip Code: 97882
Country: USA
 
Record
SN06395025-F 20220722/220720230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.