Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 22, 2022 SAM #7539
SOLICITATION NOTICE

Z -- Road Construction MATOC for Alaska

Notice Date
7/20/2022 9:08:54 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Alaska Regional Office, R10 JUNEAU AK 99802 USA
 
ZIP Code
99802
 
Solicitation Number
1240BJ22R0003
 
Response Due
8/26/2022 4:00:00 PM
 
Archive Date
09/10/2022
 
Point of Contact
Loyd Childs, Bryce Kamerdula
 
E-Mail Address
loyd.childs@usda.gov, bryce.kamerdula@usda.gov
(loyd.childs@usda.gov, bryce.kamerdula@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The scope of this Multiple Award Task Order Contract (MATOC) includes, but is not limited to, the following types of highway, street, trail, and bridge construction. The work performed may include new work, additions, alterations, maintenance, and repairs.� Road Construction: New road construction Road reconstruction/restoration Other roadbed construction (turnouts, trail head construction, roadside recreation sites) Road decommissioning Construction of steel, concrete, and timber road bridges Trail bridges, trail construction, and other trail related work Culverts, aquatic organism passage structures, and ancillary structures Erosion control-type work for roads, stream banks, and lake shore erosion Other requirements cited under Divisions 100 through 700 of the FP-14 The major categories of work activities required by the contract include clearing, earthwork, structural embankments, drainage structures, pit/quarry development, aggregate crushing, road base and surfacing, road structure demolition, road structure construction, retaining walls, and bridge construction and road obliteration (decommissioning) emergency road reconstruction In carrying out work issued as task orders under the awarded MATOC, the contractor shall furnish the personnel, equipment, tools, materials, vehicles, facilities, supervision and other items and services necessary for, or incidental to, the performance of work set forth in the task order�s Scope/Statement of Work. The Contractor shall assume all risk, loss, damage, or expense arising out of the performance of the work, except as otherwise provided in the contract. Contractor personnel shall possess appropriate certifications and training to accomplish the required work as specified in individual task orders.� Individual Projects will be packaged with the project-specific details that supplement the standard specifications and terms of the basic contract. These Individual Project requirements will include detailed payment items, special or supplemental project specifications, drawings, specialized inspection terms, performance period requirements, government-furnished property, government furnished facilities, or government-furnished services, special contract requirements, exhibits and other detailed requirements applicable to the specific Individual Project.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/4df75a4e4aac49668e5c8ac43ef70d97/view)
 
Place of Performance
Address: AK, USA
Country: USA
 
Record
SN06395583-F 20220722/220720230114 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.