SOLICITATION NOTICE
Z -- Replace CRAC Unit#2 Building 54 - 184 Wing, Kansas Air National Guard
- Notice Date
- 7/25/2022 5:40:28 AM
- Notice Type
- Solicitation
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- W7M9 USPFO ACTIVITY KSANG 184 MCCONNELL AFB KS 67221-9000 USA
- ZIP Code
- 67221-9000
- Solicitation Number
- W50S7X-22-B-0002
- Response Due
- 8/5/2022 12:00:00 PM
- Archive Date
- 08/20/2022
- Point of Contact
- Darin L Brun, Phone: 3167597591, Brent E. Geschwentner, Phone: 3167597590
- E-Mail Address
-
darin.brun@us.af.mil, brent.geschwentner@us.af.mil
(darin.brun@us.af.mil, brent.geschwentner@us.af.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- Work shall consist of but is not limited to the following: Task 1: Replace and reroute a portion of the existing copper refrigerant line sets on two existing 30 Ton Liebert Computer Room Air Conditioning (CRAC) Units. �Each Liebert Unit has two R-22 refrigerant circuits each having approximately 120 pounds of refrigerant.� Due to operational requirements of the server farm, only one circuit of one Liebert Unit can be down at a time.� R-22 Freon can be recycled for #1 and #3 CRAC units if the acid content is acceptable, otherwise new Freon shall be used. CRAC-2 will be completely replaced with a new unit.� Completely replace the refrigerant lines for the new CRAC-2 and charge the system. Each of the 6 existing line sets is comprised of one 1 inch line and one 1� inch line (see drawings for new and existing routing).� Replacement lines will use ACR copper piping and will be insulated with Rubatex insulation.� Provide insulation blocks at pipe supports and aluminum jacket around exterior piping to protect insulation.� There will be combination isolation/shraeder valves installed at the condenser end of the new portion of the line sets as well as isolation/shraeder valves installed on the linesets just outside the indoor unit (Evaporator) approximately 4 feet above the finished floor.� The result will be two isolation/shraeder valves on each line. Include installation of replaceable filter dryer assemblies. Linesets will exit the building through the concrete precast wall at approximately 12 feet high.� Lines will be supported by pipe stands or hangers keeping at least a 12 foot clearance above the ground until they reach the condensing units. Note:� The contractor will ensure cooling to the server farm is maintainted during the performance of this work by only having one circuit of each CRAC unit down at a time. Air conditioning must be sufficient to keep the server farm continuously at 73 degrees +/- 2 degrees. Task 2: Replace CRAC-2 in its intirety.� The new unit will consist of an interior 30 Ton Precision Cooling System CRAC Unit with a new 30 Ton DX Air-Cooled Microchannel Condensing Unit.� The new units will be installed in the same locations as the old interior/exterior systems.� Due to the criticality of the server farm, it is critical the demolition of the existing CRAC only occur immediately prior to the installation of the new unit.� Install combination isolation/shraeder valves at the condenser end of the line sets as well as just outside the indoor unit (Evaporator) approximately 4 feet above the finished floor.�
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/c6d7f608563f48e483ec6009991b4271/view)
- Place of Performance
- Address: McConnell AFB, KS 67221, USA
- Zip Code: 67221
- Country: USA
- Zip Code: 67221
- Record
- SN06400600-F 20220727/220725230108 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |