Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 28, 2022 SAM #7545
MODIFICATION

52 -- Lower Monumental Staff Gauges

Notice Date
7/26/2022 9:44:08 AM
 
Notice Type
Solicitation
 
NAICS
334513 — Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables
 
Contracting Office
US ARMY ENGINEER DISTRICT WALLA WAL WALLA WALLA WA 99362-1876 USA
 
ZIP Code
99362-1876
 
Solicitation Number
W912EF22Q0175
 
Response Due
8/4/2022 2:00:00 PM
 
Archive Date
09/30/2022
 
Point of Contact
Richard A. Harvey, Phone: 5095277504
 
E-Mail Address
richard.a.harvey2@usace.army.mil
(richard.a.harvey2@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
INTENT The following specifications pertain to the purchase of a replacement staff gauges for the forebay, fish ladder exits, collection channel and tailraces at Lower Monumental Project.� SCOPE The successful bidder shall be required to furnish and deliver staff gauges in accordance with Section 3.0, Equipment Requirements. ��Delivery shall be in accordance with Section 7.0, Shipment and Delivery.� �EQUIPMENT REQUIREMENTS The staff gauges listed below shall meet the following salient characteristics: 3.1� Staff Gauges (Forebay and fish ladder exit): Quantity:� 4 each Replacement Staff Gauge must be an �S� style stencil gage Must be constructed of Fiberglas Reinforced Plastic Have Ultra-Violet (UV) inhibitor properties Corrosion resistant White in color Marked in 1/10 of a foot increments in Black Every foot marked with black 3-inch numerals starting from 536 to 542 feet Size:� 8.75 inches Width x 6 feet height x 1/8 inch thick Replacement staff gauge must fit into current frame holder already mounted Surface shall be smooth to allow easy cleaning and maintenance. 3.2� Staff Gauges (Tailrace Channel): Quantity:� 2 each Replacement Staff Gauge must be an �S� style stencil gage Must be constructed of Fiberglas Reinforced Plastic Have Ultra-Violet (UV) inhibitor properties Corrosion resistant White in color Marked in 1/10 of a foot increments in Black Every foot marked with black 3-inch numerals starting from 436 to 445 feet Size:� 8.75 inches Width x 9 feet Height x 1/8 inch thick (can be in two sections) Replacement staff gauge must fit into current frame holder already mounted Surface shall be smooth to allow easy cleaning and maintenance. 3.3� Staff Gauges (South Powerhouse Collection Channel): Quantity:� 1 each Replacement Staff Gauge must be an �S� style stencil gage Must be constructed of Fiberglas Reinforced Plastic Have Ultra-Violet (UV) inhibitor properties Corrosion resistant White in color Marked in 1/10 of a foot increments in Black Every foot marked with black 3-inch numerals starting from 437 to 446 feet Size:� 8.75 inches Width x 9 feet Height x 1/8 inch thick (can be in two sections) Replacement staff gauge must fit into current frame holder already mounted Surface shall be smooth to allow easy cleaning and maintenance. 3.4� Staff Gauges (North Shore Collection Channel): Quantity:� 1 each Replacement Staff Gauge must be an �S� style stencil gage Must be constructed of Fiberglas Reinforced Plastic Have Ultra-Violet (UV) inhibitor properties Corrosion resistant White in color Marked in 1/10 of a foot increments in Black Every foot marked with black 3-inch numerals starting from 437 to 445 feet Size:� 8.75 inches Width x 8 feet Height x 1/8 inch thick Replacement staff gauge must fit into current frame holder already mounted Surface shall be smooth to allow easy cleaning and maintenance. �SUBMITTALS The vendor shall provide brochures or any information with their quote for the Government to review for technical acceptability.� All quoted information will be sent with your quote and shall be of sufficient detail to show conformance to the specifications.� Failure to provide acceptable proof of conformance or failure to meet the requirement of the specifications may result in disqualification from award. OPERATIONS AND MAINTENANCE MANUALS: Contractor shall provide one electronic copy of the Operations and Maintenance (O&M) manual.� The O&M manual shall include instruction on the maintenance, repair, and warranty of the equipment. WARRANTY: All Staff gauges shall be covered by a minimum one-year warranty on all parts, labor, and workmanship from factory defects.� SHIPMENT AND DELIVERY All items shall be delivered FOB to Lower Monumental Dam within 20 weeks of contract award. The contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival. No shipments are allowed other than normal business hours of Monday-Thursday 7:30 AM � 4:00 PM, excluding federal holidays. All shipments shall be delivered to: Lower Monumental Lock and Dam ATTN: Contract Performance Specialist 5520 Devils Canyon Rd Kahlotus, WA 99335
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/fecc139a009f4db291d98fa17172238f/view)
 
Place of Performance
Address: Kahlotus, WA 99335, USA
Zip Code: 99335
Country: USA
 
Record
SN06401524-F 20220728/220726230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.