SOLICITATION NOTICE
43 -- 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF
- Notice Date
- 7/26/2022 5:23:58 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
- ZIP Code
- 17050-0788
- Solicitation Number
- N0010422RZB67
- Response Due
- 8/17/2022 9:00:00 PM
- Archive Date
- 09/02/2022
- Point of Contact
- Telephone: 7176053261
- E-Mail Address
-
AMBER.L.MILLER@NAVY.MIL
(AMBER.L.MILLER@NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N742.3|WR5DD|(717)605-3261|amber.l.miller.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001|THREE (3)|565|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoice Combo|Material - Inspect & Accept at Source|HQ0337|N00104|S4306A|Certifications - N45404 Material - S4306A|Certifications - N4 5404 Material - SW3117|0UBG9|N/A|N/A|N/A|Certifications - N45404|N/A|N/A|See DD Form 1423|1-866-618-5988 - WAWF Helpdesk| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2021)|4||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (SEP 1999))|9|||||||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| PROGRESS PAYMENTS (NOV 2021)(DEVIATION 2020-O0010)|4||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS ($100K)(FEB 1997)|1|| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||X|||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (SEP 2021)|4||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|333996|1250|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| TYPE OF CONTRACT (APR 1984)|1|Firm-Fixed Price (FFP)| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JUN 2019))|1|| 1. This solicitation is for the repair of NIIN 003837939 (PUMP UNIT,CENTRIFUG), quantity 3. 2. Proposal is to be submitted as an Estimated, Not-To-Exceed (NTE) price for the full repair of the requirement. Vendor will have 90 days to complete a teardown and evaluation of the carcasses and submit a Firm-Fixed Price proposal. 3. When submitting a proposal, make sure to specify any exceptions, i.e. MIL-STD packaging, MIL-STD labeling, Inspection & Acceptance locations, Packaging House, Surplus Material, etc. If no exceptions are indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award shall have consideration costs deducted from unit price. 4. Include in NTE repair price all costs associated with receipt of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also, please provide the following: a. Teardown and Evaluation Rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration: Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Requested RTAT: 565 Days Proposals shall reference proposed RTAT and any capacity constraints. Price Reductions: Any asset for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's rights to terminate for default. 5. If supplies will be packaged at a location different from the Offeror's address, the Offeror shall provide the Name, Street Address, and CAGE of the Packaging Facility. 6. If you are not the manufacturer of the material called out in the requirement, the actual manufacturer must be stated in (Name and CAGE) and be able to provide traceability documentation if requested. Examples of traceability documentation include but are not limited to the following: - Purchase order/invoice between offeror and the manufacturer identifying the part number, revision level and quantities. - Manufacturer's packing slip or certification identifying the part number, revision level and quantities. 7. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for Naitonal Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. 8. Offerors must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N00104-22-R-ZB67, because N00104-22-R-ZB67 includes an annex (information) classified at the CONFIDENTIAL level which will be released only to the offerors possessing the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM)(DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R). 9. This requirement will be contracted under Basic Ordering Agreement (BOA) N00104-17-G-AS01. 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;Drawing 10640-A-18 - CONFIDENTIAL Tech Manual 0947-LP-200-5010 - CONFIDENTIAL; 2.3 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3.1 Specification Revisions - The specification revisions listed under ""Documents References"" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;10591-H-18 88032 F D PL-10591-H-18 88032 C E 10580-F-18 88032 I B 10560-C-18 88032 B B 10563-B-18 88032 B B 10564-B-18 88032 B B 10565-B-18 88032 C B 10568-B-18 88032 A B 10569-B-18 88032 B B 10576-C-18 88032 B B 10582-C-18 88032 D B 10579-F-18 88032 G B 10632-C-18 88032 D B 10566-B-18 88032 A B 10567-B-18 88032 A B; 2.3.3 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 2.3.4 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=10640-A-18 |88032| B|CD |D|0001 | B|00026|0000000 DRAWING DATA=3505-20 |95402| | |D|0001 | |49998|0782765 DRAWING DATA=3505-9 |95402| B| |D|0001 | B|49998|2401675 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A193 | | | |200515|A| | | DOCUMENT REF DATA=ASTM-A194 | | | |200501|A| | | DOCUMENT REF DATA=ASTM-A285 | | | |030910|A| | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=ASTM-A479 | | | |200701|A| | | DOCUMENT REF DATA=ASTM-A487 | | | |200501|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-S-24093 | | |A |911105|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout refurbishment. 3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied. 3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this TDP (Technical Data Package). 3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Ingersoll Rand Co. drawings 10591-H-18 and PL-10591-H-18, Maintenance Standard 2550-081-066 Revision B Change 3, SHIPALT SSN3982 Revision 0, Tech Manual 0947-LP-200-5010 Revision 01 dated 3/12/09, Ingersoll Rand Co drawing 10640-A-18, General Dynamics motor drawing 3505-9 with Maintenance Standard 2550-081-062 Revision D Change 3 or General Dynamics motor drawing 3505-20 with Maintenance Standard 2550-081-063 Revision C Change 1, and Refurbishment Instruction 5520-012-0700 (CSD223); , except as amplified or modified herein. This applies to all ""Parts Requiring Certification"" as identified elsewhere in this Contract/Purchase Order. 3.1.5 Additional SOW Requirements - ;N/A; 3.1.6 ;SMIC Q3 parts for the Pump/Motor assembly which meet RI 5520-012-0700 (CSD223) requirements can be reused.; 3.2 ;No-Forn documents Maintenance Standard 2550-081-066, Maintenance Standard 2550-081-062, Maintenance Standard 2550-081-063, SHIPALT SSN3982 and confidential document Tech Manual 0947-LP-200-5010 will be provided by mail if the bidder does not possess them.; 3.3 ;Replace packing gland assembly with a split mechanical seal assembly in accordance with SHIPALT SSN3982.; 3.4 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD223; in ECDS at https://register.nslc.navy.mil/ 3.5 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;End Cover, Item No. 158 and Shell, Item No. 476; Material - ;MIL-S-24093 Class H; Part - ;Studs, Item No's. 178A, 178B, and 178C; Material - ;ASTM-A193 Grade B7; Part - ;Nuts, Item No's. 179A, 179B, and 179C; Material - ;ASTM-A194 Grade 2H; Part - ;Blind Flange, Item No. 186; Material - ;ASTM-A285 Grade C; Part - ;Nut, Slotted, Item No. 179G; Material - ;QQ-N-286 FORM 2, Hot Finished, Annealed and Age Hardened or Cold Drawn, Annealed and Age Hardened; Part - ;Rod, Tie, Item No. 374; Material - ;QQ-N-286 Form 2, annealed and age hardened; Part - ;Nozzle Head, Item No. 360 on drawing 10580-F-18; Material - ;ASTM-A487 Grade CA-6NM; Part - ;Nipple, Flanged on drawing 10632-C-18; Material - ;SAE-AMS-QQ-S-763 Forging, Class 410, Condition T, Hot Finished; Part - ;Plug, Item 417A; Material - ;ASTM-A479 Type 316 Annealed; Part - ;Shaft, item 42 of drawing 3505-9; Material - ;MIL-S-24093 Class D Type II or AISI 4140 or 4340 Quenched and Tempered and meeting the mechanical properties of note 22 of drawing 3505-9; 3.6 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Magnetic Particle Inspection; Item - ;Nozzle Head, Item No. 360 on drawing 10580-F-18; Performance - T9074-AS-GIB-010/271 Acceptance - S9074-AR-GIB-010A/278 Test - 5x Visual Magnification or Dye Penetrant Inspection (root layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Visual and Dye Penetrant Inspection (final layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Liquid Penetrant Inspection; Item - ;Nut Slotted, Item No. 179G; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Liquid Penetrant Inspection or Magnetic Particle Inspection (Wet Method) (Either inspection is acceptable); Item - ;Studs, Item No's 178A, 178B, and 178C and Nuts, Item No's 179A, 179B, and 179C; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Test - ;Insulation Resistance; Item - ;Motor; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Test - ;Structureborne noise test; Item - ;Each Pump/Motor assembly; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Test - ;Operational Test; Item - ;Each Pump/Motor assembly; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Test - ;Hydrostatic test; Item - ;Pump; Performance - ;Paragraph 1.al. of MS 2550-081-066; Acceptance - ;Paragraph 1.al. of MS 2550-081-066; Attribute - ;Maintenance Standard 2550-081-066 inspections requiring a recorded measurement or checked as SAT or UNSAT; Item - ;Each Pump assembly; Performance - ;Maintenance Standard 2550-081-066; Attribute - ;Maintenance Standard inspections requiring a recorded measurement or checked as SAT or UNSAT; Item - ;Each Motor assembly; Performance - ;Maintenance Standard 2550-081-062 for General Dynamics motor drawing 3505-9 or Maintenance Standard 2550-081-063 for General Dynamics motor drawing 3505-20; Test - ;Hydraulic pump curve test; Item - ;Each Pump/Motor assembly; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Test - ;Pump and motor design capacity test; Item - ;Each Pump/Motor assembly; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Test - ;Pump mechanical seal leakage test; Item - ;Each Pump; Performance - ;Refurbishment Instruction 5520-012-0700; Acceptance - ;Refurbishment Instruction 5520-012-0700; Attribute - Annealing and Age Hardening Item - ;Nut, Slotted, Item No. 179G and Rod, Tie, Item No. 374; Performance - QQ-N-286 3.7 Radiography is required on ;Nozzle Head, Item No. 360 on drawing 10580-F-18; . 3.8 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.9 K-MONEL Fasteners - Material must be heat treated per QQ-N-286. 3.9.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the annealed and age hardened material and must meet the requirements of QQ-N-286. 3.9.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be cut or ground only. 3.10 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.11 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.12 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;Tech Manual 0947-LP-200-5010; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 3.13 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.13.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.13.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.13.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.14 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.15 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.16 Component Identification - An AERP serial number will be assigned to each component and a nameplate will be provided by NAVSUP WSS MECH, Code N97121, as Government Furnished Equipment (GFE) prior to packaging and shipment. The Contractor is requested to notify NAVSUP WSS MECH, Code N97121 when the manufacturing process is ready for the nameplate(s), allowing sufficient time for mailing. Additional details are clarified in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP. 3.16.1 ;The AERP label is to be placed as close to the manufacturers label plate as possible.; 3.17 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.18 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.18.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.18.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.18.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.19 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.20 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.20.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.21 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.22 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.22.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.22.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.22.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the contract. 3.22.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.22.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies....
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/68eba7e853e64d4a95569195e12234a1/view)
- Record
- SN06402311-F 20220728/220726230111 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |