Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 03, 2022 SAM #7551
SOLICITATION NOTICE

F -- GAOA-Fremont River RD Trail Maintenance-Fishlake NF

Notice Date
8/1/2022 6:48:33 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
115310 — Support Activities for Forestry
 
Contracting Office
USDA-FS, CSA INTERMOUNTAIN 7 Ogden UT 844012310 USA
 
ZIP Code
844012310
 
Solicitation Number
1240LS22Q0063
 
Response Due
8/10/2022 12:00:00 PM
 
Archive Date
08/25/2022
 
Point of Contact
Christine Hansen, Phone: 8019081910
 
E-Mail Address
christine.m.hansen@usda.gov
(christine.m.hansen@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
**Amendment 1** Extend closing date to Wednesday, August 10, 2022 at 1:00 PM Mountain Time (local time) The Fishlake National Forest anticipates a need for Trail Maintenance on the Fremont River Ranger District. The project consists of: Clearing Out. Cut and remove all logs that extend across or into the clearing limits. The portions of cut logs that remain on the upper side of the trail shall be either firmly anchored to prevent sliding or rolling onto the trail way or moved across the trail to the lower side and scattered outside the clearing limits. Fell all trees over 4 inches in diameter that are leaning into the clearing limits and that are within 10 feet above the trail bed. Stump height of leaning trees that are cut outside the clearing limits shall not exceed one (1) foot as measured on the uphill side of the stump. Disposal and payment for the leaning trees described above will be the same as for down logs and trees. Remove roots and stumps from trees within the trail way that have been uprooted. Rerouting the trail around windfalls, uprooted trees, and other obstacles will not be permitted. Ramp or reroute sections of the trail tread that have been damaged by uprooted stumps as necessary to provide safe passage on the trail. Payment for such work will be incidental to the specified work item, and no extra payment will be made. Remove sticks or wood chunks exceeding 2 inches in diameter and 1 foot in length that have fallen on to the trail bed. Scatter the down trees on the lower side of the trail way outside the clearing limits. Do not place such materials in stream channels, drainage ways, ditches, culvert catch basins, or other locations where they would prevent the free flow of water away from the trail bed. The project location is: On the Fremont River Ranger district and includes trails in the Fishlake basin, Thousand Lakes mountains and the Boulder mountains. Questions regarding this opportunity are due in writing to the CO, Chris Hansen, christine.m.hansen@usda.gov� by Friday, July 22, 2022 at 1:00 PM Mountain Time (local time). Project start date will be approximately August 2022 This project is a total Small Business Set Aside. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. SAM REGISTRATION REQUIREMENTS: Prospective contractors must be registered in the System for Award Management (SAM) prior to submitting a proposal www.sam.gov.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/7d96240db0a84ec7a09520b10b42765a/view)
 
Place of Performance
Address: UT, USA
Country: USA
 
Record
SN06408804-F 20220803/220801230127 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.