SOLICITATION NOTICE
Z -- Z--Genoa NFH Ponds 12 and 13 Kettles
- Notice Date
- 8/1/2022 12:44:14 PM
- Notice Type
- Presolicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- FWS SOUTHWEST REGIONAL OFFICE ALBUQUERQUE NM 871031306 USA
- ZIP Code
- 871031306
- Solicitation Number
- 140F0222R0035
- Response Due
- 9/13/2022 10:00:00 AM
- Point of Contact
- Breske, Tiffany, Phone: 6127135187, Fax: (612) 713
- E-Mail Address
-
Tiffany_Breske@fws.gov
(Tiffany_Breske@fws.gov)
- Description
- PROJECT LOCATION: U.S. Fish & Wildlife Service, Genoa National Fish Hatchery, Genoa, Wisconsin ESTIMATED MAGNITUDE: The magnitude of this requirement in terms of physical characteristics and estimated price range is between $1,000,000.00 and $5,000,000.00. SOCIOECONOMIC PROGRAMS: Potential Offerors are advised that this procurement is a Total Small Business Set-aside without further socio-economic set aside in accordance with FAR 19.203(c). The North American Industry Classification Code (NAICS) is 237990, Other Heavy and Civil Engineering Construction, with a size standard of $39.5 million. The Solicitation Package will be available via electronic commerce on beta.SAM.gov on or about August 15, 2022 with Proposals due on or about September 13, 2022. The Solicitation Package will include, at a minimum, the following: Specifications, Drawings, and Prevailing Wage Determinations. Please ensure you have a complete downloaded Solicitation Package before submitting your Proposal. It is the Contractor's responsibility to ensure that they receive all appropriate solicitation documents to submit a competitive Proposal. Please contact Tiffany Breske, Contracting Officer, via email at tiffany_breske@fws.gov for any questions concerning this announcement. PROJECT CONSISTS OF: Base Bid Item 1 - Pond 12 Kettle Structure and work under this item includes mobilization and demobilization, cofferdam construction, site excavation, removal of existing structure, installation of steel shell piling, placement of foundation gravel and geogrid, concrete placement, connecting supply piping, backfilling and compacting of embankments, installing gate valves, handrails, and grating, miscellaneous metal work, adding and regrading pond gravel around structure to drain to new kettle entrance, restoring road gravel, and seeding. Item 2 - Pond 13 Kettle Structure and work under this item includes cofferdam construction, site excavation, removal of existing structure, installation of steel shell piling, placement of foundation gravel, geogrid and reinforced concrete, connecting supply piping, backfilling and compacting of embankments, installing gate valves, handrails, and grating, miscellaneous metal work, adding and regrading pond gravel to drain to new kettle entrance, restoring road gravel, and seeding. Alternate Bid Item 1 Pond 13 Rehabilitation and work under this item includes dewatering, excavation of approximately 4,987 cubic yards of pond bottom spoil material, re-grading approximately 107,730 square feet of fish rearing pond bottom, placement of a plastic geo-grid layer, placement, compaction, and leveling of gravel 18"" deep, and removal and trucking of excess spoil material to off-site locations. The 4,987 cubic yards of material being removed shall be placed in a spoil site location approximately 11 miles away. SITE VISIT: Offerors are urged and expected to inspect the site where the work will be performed. Site visit details will be provided when the full solicitation package is available.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/67c6c1aea5284ab389e1d2a335df5ad5/view)
- Place of Performance
- Address: Vernon County, WI
- Record
- SN06409115-F 20220803/220801230129 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |