Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 10, 2022 SAM #7558
SOLICITATION NOTICE

Z -- Sewage Pump Station Rehabilitation at Dashields Locks and Dam

Notice Date
8/8/2022 4:23:41 PM
 
Notice Type
Solicitation
 
NAICS
562991 — Septic Tank and Related Services
 
Contracting Office
US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W911WN22Q8007
 
Response Due
8/15/2022 2:00:00 PM
 
Archive Date
09/30/2022
 
Point of Contact
Erica Mullen, Phone: 4123957256, Janie Roney, Phone: 4123957474
 
E-Mail Address
erica.l.mullen@usace.army.mil, janie.l.roney@usace.army.mil
(erica.l.mullen@usace.army.mil, janie.l.roney@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
The US Army Corps of Engineers, Pittsburgh District, has a requirement to rehabilitate the existing sewage pump station at Dashields Locks and Dam, Allegheny County, Coraopolis, Pennsylvania. This requirement is to rehabilitate the existing swage pump to include the submersible pumps, motors, motor controls, portions of the discharge piping and all associated pump station hardware exposed to the untreated sewage. The existing concrete sump vault and valve pit will be reused. In general, the tasks required in performance of this contract include: Secure and pump out the vault, dispose of the pumped waste. Clean and sanitize the vault interior in preparation for equipment replacement. Remove existing sewage pumps and install two (2) new Contractor provided vertical electric submersible pump/motor units in accordance with these specifications. Remove the existing 4? diameter discharge pipe from each pump discharge up to and including the discharge check valve and replace the piping in kind in accordance with these specifications. Piping to be supplied by the Contractor. Remove existing pump guide rails and lifting chains and install new Contractor supplied stainless steel pump guides and stainless steel lifting chains of the same size or as appropriate. Remove existing electrical components to include the dual pump motor controller, all cable in the vault, all watertight fittings and vault penetrations, all float switch and alarm actuators located in the vaults and all mounting hardware. Replace all items removed with all new contractor supplied electrical components and stainless steel mounting hardware. Test the completed system. The RFQ Package contains the Solicitation and six (6) Attachments. Amendments issued include 0001, 0002 and 0003. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22Q8007' to obtain more details.* 8/8/22: (Combined) Pre-Quote Site Visit documents have been attached to this Notice including the Sign-In Sheet, Agenda, and Contracting Discussion. Pre-Quote Site Visit was held on 8/2/22.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/9e31016effa94405b1949fdfe56de2ec/view)
 
Record
SN06417866-F 20220810/220808230114 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.