Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 10, 2022 SAM #7558
SOLICITATION NOTICE

Z -- Fort Peck Butterfly Valve Rehabilitation

Notice Date
8/8/2022 12:21:13 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W071 ENDIST OMAHA OMAHA NE 68102-4901 USA
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F22R0049
 
Response Due
9/1/2022 12:00:00 PM
 
Archive Date
09/16/2022
 
Point of Contact
Lynne D. Reed, Phone: 4029952039, Daniel D. Monahan
 
E-Mail Address
lynne.d.reed@usace.army.mil, daniel.d.monahan@usace.army.mil
(lynne.d.reed@usace.army.mil, daniel.d.monahan@usace.army.mil)
 
Description
The U.S. Army Corps of Engineers (USACE), Omaha District NWO, intends to pursue award of a contract to refurbish the eighteen (18) foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam locat3ed near Glasgow, MT. This includes associated� equipment such as valve operaors (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintencance platforms, hydraulic power units (HPUs) and BFV controls. non-destructive examination (NDE) of the penstocktunnels will also be required to assess tunnel wall corrosion.� The U.S. Army Corps of Engineers (USACE), Omaha District NWO, intends to pursue award of a contract to refurbish the eighteen (18) foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam locat3ed near Glasgow, MT. This includes associated� equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs) and BFV controls. non-destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion.� The BFVs will be refurbished in-place to improve internal bypass leakage on unites 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and re-coating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs.� The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project.� Contractor will be required to provide all equipment and certifications/licensure necessary to complete this project. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including the cost of materials, with their own employees for general construction-type procurement. **NOTE** Please note that all provided documents are final to include a Change Document for the Specification from the presolicitation notice.� The BFVs will be refurbished in-place to improve internal bypass leakage on unites 4 and 5 valve discs and address component end of life and system realiability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and re-coating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs.� The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project.� Contractor will be required to provide all equipment and certifications/licensure necessary to complete this project. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including the cost of materials, with their own employees for general construction-type procurement. **NOTE** Please note that all provided documents are final to include a Change Document for the Specification from the presolicitation notice.� **NOTE**�Solicitation questions and/or comments must be submitted via Bidder Inquiry in ProjNet at:�https://www.projnet.org/projnet/.� All Bidder Inquiries must be submitted no later than ten (10)�calendar days before the proposal due date in order for inquiries to be given consideration or�actions taken prior to the receipt of offers. All timely questions and approved answers will be�made available through ProjNet. Please do not call the Contracting Specialist. - All questions must be addressed in ProjNet only. Solicitation Number is: W912822R0049 Bidder Inquiry Key is: GFJJ8D-AI8IDU
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/35c4820c2f5344f68bea92f8d93148a2/view)
 
Place of Performance
Address: Fort Peck, MT 59223, USA
Zip Code: 59223
Country: USA
 
Record
SN06417887-F 20220810/220808230114 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.