Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 10, 2022 SAM #7558
SOURCES SOUGHT

99 -- Design and Fabrication of Bulkheads for Advanced Test Reactor Canal

Notice Date
8/8/2022 1:53:22 PM
 
Notice Type
Sources Sought
 
NAICS
332999 — All Other Miscellaneous Fabricated Metal Product Manufacturing
 
Contracting Office
BATTELLE ENERGY ALLIANCE�DOE CNTR Idaho Falls ID 83415 USA
 
ZIP Code
83415
 
Solicitation Number
INL-22-011
 
Response Due
8/15/2022 4:00:00 PM
 
Point of Contact
Blake Weekes
 
E-Mail Address
blake.weekes@inl.gov
(blake.weekes@inl.gov)
 
Description
ADDITIONAL SUBMITTAL REQUIREMENTS ADDED �EXPRESSION OF INTEREST INL-22-011 REVISION 2 Design and Fabrication of Bulkheads for Advanced Test Reactor Canal I. INTRODUCTION Battelle Energy Alliance, LLC (BEA), Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from prospective suppliers to provide the design and fabrication of replacement half-height and full-height bulkheads for the Advanced Test Reactor (ATR) working and storage canal. The bulkheads will replace the existing bulkheads which have been problematic in terms of their ability to effectively seal and isolate water in specific portions of the canal. This EOI shall serve as a method of identifying qualified suppliers interested in providing the bulkheads to INL; participation in the activities described herein neither prequalifies nor disqualifies the prospective supplier for later material supply to the INL. Requests for Proposals (RFPs) may be issued as a result of responses from this EOI. II. BACKGROUND The ATR canal allows for safe storage and handling of nuclear fuels, experiments, and hardware that have undergone irradiation in the ATR. The canal water inventory provides cooling for these irradiated materials and provides the radiation shielding necessary to keep dose rates to ATR personnel to a level well below acceptance standards. The ATR canal walls and floors are constructed of reinforced concrete and lined throughout with seam-welded stainless steel that extends to the top of the parapet. The canal is 21 ft deep measured from the top of the parapet (the water level is 20 feet deep), except for a small deep well section. Five pairs of wall pockets allow the use of bulkheads to isolate canal areas. This allows portions of the canal to be drained occasionally for maintenance or program support work while keeping other portions of the canal filled. More importantly, pocket locations also allow utilization of bulkheads as a barrier to accidental drainage events in order to maintain required water levels within other portions of the canal. III. SCOPE OF WORK The scope of work associated with this Expression of Interest is the design, fabrication, inspection, testing, packaging, and shipment to the ATR of the type (i.e., half height or full height) and quantity of replacement bulkheads ordered by the BEA Purchasing Agent. Additionally, for each bulkhead ordered and delivered, the associated tools, handling equipment (e.g., hoisting and rigging), and spare parts (e.g., seals) shall be provided. Any exceptions to this Expression of Interest shall be clearly defined in the supplier's initial proposal submittal and specifically identified as exceptions. FOR-457, �Functional and Operational Requirements, ATR Bulkhead Replacement,� Rev. 0 and SPC-2697, �Specification. ATR Bulkhead Replacement,� Rev. 1 will be provided upon request. IV. APPLICABLE CODES AND STANDARDS The bulkheads furnished under this specification shall be manufactured and tested in accordance with applicable national consensus standards The standards listed below, alone or in combination, shall be considered applicable by the BEA contract specialist. A list of standards selected by the supplier for design, fabrication, examination and testing shall be submitted to the contract specialist for approval. Conflicts in any Code or Standard requirements shall be documented by the supplier and provided to the BEA contract specialist for resolution concurrence. � ASME BPVC, Section VIII, Division 2 (BPVC.VIII.2), Alternate Rules � Rules for 38 Construction of Pressure Vessels, 2021 Edition. 39 � ASME BPVC, Section II, Part A, Ferrous Material Specifications, 2021 Edition. � ASME BPVC, Section II, Part B, Nonferrous Material Specifications, 2021 Edition. � ASME Boiler and Pressure Vessel Code (BPVC), Section IX, Welding, Brazing, and Fusing 1 Qualifications, 2019 Edition. � AISC � Steel Construction Manual, 15th Edition. � AISC � Design Guide 27: Structural Stainless Steel, 2013 Edition. � ANSI/AISC N690-18, Specification for Safety-Related Steel Structures for Nuclear 8 Facilities, June 2018 � ASTM International material standards, latest editions. � Aluminum Association � Aluminum Design Manual, 2020 Edition. � AWS D1.2/D1.2M, Structural Welding Code-Aluminum 2014 Edition � AWS D1.6/D1.6M, Structural Welding Code � Stainless Steel, latest Edition. � ASTM D395, Standard Test Methods for Rubber Property, 2018 Edition � Compression Set. � ASME - ANSI N45.2.1, Cleaning of Fluid Systems and Associated Components for Nuclear 21 Power Plants, 1980 Edition. � ASME � ANSI N45.2.2, Packaging, Shipping, Receiving, Storage, and Handling of Items for 24 Nuclear Power plants; QA Cases, December 1978. � ASME B30.26-2015, Rigging Hardware. Additionally, the bulkheads shall meet the functional and operational requirements of FOR-457.1. It is the BEA contract specialist's intent that the requirements of FOR-457 have been adequately and accurately captured in this specification. FOR-457 provides additional requirement bases information that shall be considered by the supplier. Any supplier identified discrepancies between the requirements of the FOR and this specification shall be promptly brought to the attention of the BEA contract specialist for resolution. V. CODE CLASSIFICATION AND SAFETY CLASSIFICATION The bulkheads are Safety-Related components per the ATR safety basis. As such, they shall be 40 treated as Class 1 Vessels as defined in ASME BPVC.VIII.2 Annex 1-B, ""Definitions."" IV. SUBMITTAL REQUIREMENTS To qualify for consideration, prospective subcontractors shall provide brief statements of how they meet the mandatory requirements listed below: Overview of the candidate company. Suppliers will have at least 20 years� experience in the design and manufacture of bulkheads utilizing elastomers engineered for sealing solutions specific to nuclear applications. In-house fabrication of these elastomers is preferred. The supplier shall have a documented quality program and must demonstrate effective implementation of their quality process and controls during an in-person evaluation by Idaho National Laboratory (INL). Submit evidence of having the ability to perform underwater dimensional measurements for verification of existing INL drawings. Submit evidence of having the ability to perform full scale mockup testing. Due to programmatic requirements, delivery of bulkheads will be required 16-months after APO. Name, telephone number, and e-mail address of a representative of your firm who can answer questions regarding this request for expression of interest. BEA plans to issue a Request for Proposal that will allow award of a subcontract to fabricate these bulkhead assemblies. Please provide your expression of interest by email Blake Weekes at Blake.Weekes@inl.gov by Close-of-Business, August 15, 2022. Included must be sufficient written information confirming the responder�s qualifications as a potential offeror under a prospective RFP(s). Note that qualification packages must be no more than 10 pages in length.� Questions can be submitted via email to Blake Weekes (Blake.Weekes@inl.gov).
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/ae428c15f2be48d3b12167bfbeb0f0e7/view)
 
Place of Performance
Address: Idaho Falls, ID 83415, USA
Zip Code: 83415
Country: USA
 
Record
SN06418598-F 20220810/220808230120 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.