Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 14, 2022 SAM #7562
SOLICITATION NOTICE

Y -- Antilles Middle School Repair HVAC System

Notice Date
8/12/2022 7:28:13 AM
 
Notice Type
Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
US ARMY ENGINEER DISTRICT SAVANNAH SAVANNAH GA 31401-3604 USA
 
ZIP Code
31401-3604
 
Solicitation Number
W912HN22B4015
 
Response Due
9/20/2022 10:00:00 AM
 
Archive Date
08/12/2023
 
Point of Contact
MICHAEL WELCH, Phone: 912-652-5416
 
E-Mail Address
michael.j.welch@usace.army.mil
(michael.j.welch@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Replace two exterior, air-cooled, 150-ton water chillers (CH-1, CH-2).Provide and connect temporary chillers for cooling until permanent chillers installed for the entire school year while building is occupied. Replace approximately 13 rooftop dehumidifiers. Replace failing ductwork insulation in Building C and other locations shown on the drawings. The 13 existing, roof-mounted, packaged dehumidification and cooling units shall be removed and replaced with new units. The units are located on the roofs of Buildings 1073, 1075, 1077, 1079, 1081, 1083, 1085, and 1087. The new units will provide dehumidified ventilation air to the buildings existing air handling systems. Modify the existing roof mounted ductwork as required to make proper connection to the new units. Repair and modify the existing mechanical unit support frames as required to accommodate the new units. Prepare the surface of the existing mechanical unit support frames and apply marine grade epoxy multi-coat system to them. Provide and install new split system condenser (CU-K1), two new chilled water pumps (PCHP-01 and PCHP-02) and associated VFDs. Control devices shall be replaced in accordance with the drawings to include those in the chilled water supply and return piping, and other identified locations. Chilled water valves (manual and electrically actuated) shall be replaced, connected to power, and integrated BACNET controller/interface. For new devices, furnish and install wiring and programing for full communication from and to the Metasys control system in coordination with Base controls contractor (JCI). Perform factory start-up, connectivity, and commissioning on all repaired/replaced systems. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B4015' to obtain more details.*
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/e1f2b5ca703d44efb3a7703ab62d6ea4/view)
 
Record
SN06425223-F 20220814/220812230121 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.