Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 14, 2022 SAM #7562
SOLICITATION NOTICE

Y -- USACE SPK Design Build Construction - AFTC Munitions Storage Magazines - Hill AFB, UT

Notice Date
8/12/2022 6:46:57 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT SACRAMENT SACRAMENTO CA 95814-2922 USA
 
ZIP Code
95814-2922
 
Solicitation Number
W9123822R0016
 
Response Due
8/22/2022 9:00:00 AM
 
Archive Date
09/06/2022
 
Point of Contact
Jeremy Grimley
 
E-Mail Address
jeremy.j.grimley@usace.army.mil
(jeremy.j.grimley@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
United States Army Corps of Engineers (USACE), Sacramento District (SPK) requires Design-Build (DB) construction services to build seven (7) earth covered reinforced concrete Munitions Storage Magazines (MSMs) also referred to as igloos, measuring 26 feet x 80 feet each, capable of storing 500,000 pounds of Class 1.1 munitions each. Work is anticipated to include demolition of 1,350 Square Meters (SM) in obsolete facilities to clear the site for the new igloos, as well as construction of access roads, reinforced concrete aprons, utilities, site improvements, communication support, and all other necessary support for the Air Force Training Center (AFTC) at - Hill Air Force Base (HAFB), Utah (UT). Facilities must be designed as permanent construction in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 1-200-01. Sustainable principles, to include life cycle cost-effective practices, must be incorporated into the design, development, and construction of this project in accordance with UFC 1-200-02. This project must comply with DoD Antiterrorism Force Protection (AT/FP) requirements per UFC 4-010-01. Facility must meet DoD Explosive Safety Board (DDESB) requirements in design and construction. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(i), the magnitude of construction is estimated to be between $10,000,000 and $25,000,000.BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. - - - - Solicitation Amendment 0001 is issued to incorporate two attachments, update the proposal due date, and the solicitation Sections 00 10 00 and 00 22 00. - - - - *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0016' to obtain more details.*
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/16468991319c44d182f20e4cd2ded9be/view)
 
Record
SN06425227-F 20220814/220812230121 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.