Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 17, 2022 SAM #7565
SOLICITATION NOTICE

Z -- Repair Big Piney Weir

Notice Date
8/15/2022 5:28:12 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W071 ENDIST KANSAS CITY KANSAS CITY MO 64106-2896 USA
 
ZIP Code
64106-2896
 
Solicitation Number
PANNWD-22-P-0000-004925
 
Response Due
8/22/2022 3:00:00 PM
 
Archive Date
08/23/2022
 
Point of Contact
Christina Lawson, Phone: 8163893182, Keandre Malone, Phone: 8163893596
 
E-Mail Address
christina.j.lawson@usace.army.mil, keandre.d.malone@usace.army.mil
(christina.j.lawson@usace.army.mil, keandre.d.malone@usace.army.mil)
 
Description
475287 FLW Repair Big Piney Weir - Construction;�Fort Leonard Wood, Missouri -�W912DQ22R4021 ***Please see attached B.08.03 W912DQ22R4021 Amendment 0004 Modification Document.*** The U.S. Army Corps of Engineers, Kansas City District, issues Amendment 0001 to Solicitation W912DQ22R4021 for a single Design-Bid-Build, Firm Fixed Price Contract for the Repair of the Water Intake Weir at Big Piney on Fort Leonard Wood in Missouri.� The scope of the requirement includes construction of a repair or replacement weir for the existing water intake weir in the Big Piney River with a service life of 10 years. Weir repair has been designed to maintain the current water pool requirements for the water intake and includes, up & down stream cofferdams, containment walls, and weir injection, as needed. Construction of the weir repair must be within the current environmental permitting, Nationwide Permit 3, for the existing weir. An aquatic organism passage will be included as part of the weir design per environmental requirements, Section 7 Consultation, Fish and Wildlife Coordination Act. The existing canoe portage path is to be replaced as needed to install the new weir and aquatic organism bypass. Dewatering�permissible with approval from 1 April to 1 November. Background: The original weir for the water intake was constructed in the early 1940s, the design drawing is dated September 1942. Historical images from the bridge construction downstream of the weir in 1957 show the weir in the background. From these images it looks like the original weir was replaced with a rock covered earthen berm. It is possible that soil and rock simply accumulated onto the original concrete weir, but we assumed a worse case of the original weir being removed or washed out. In 1986 the weir was raised and repaired. The raise consisted of placing additional soil and rock fill on the existing earthen berm then placing gabion baskets and a concrete cap. The bank slopes also had gabion basket protection placed on them when the weir was raised. Fish passage was one of the concerns listed in the 1986 404 permit, but fish passage was not incorporated into the weir repair. The water intake weir has deteriorated since the 1986 repair. The concrete cap has several large cracks in the surface, the gabion baskets below the cap can be seen in locations, and some pieces of the downstream edge of the concrete weir cap have broken off. The gabion baskets have also deteriorated, many are missing rock material or have broken open. During boring it was observed that there are large voids under the concrete cap and water was flowing through the weir. Site visit details are included in the solicitation. This is a Request for Proposal (RFP). The estimated performance period for completion of construction is 365 calendar days from the issuance of the Notice to Proceed (NTP). The NAICS code is 237990 Other Heavy and Civil Engineering Construction, with a small business size standard of $39.5 Million in average annual receipts. In accordance with FAR 36.204 and DFARS 236.204, the estimated magnitude of this construction project is between $5,000,000 and $10,000,000. The Government will evaluate the performance capability of offerors in accordance with the criteria described in the solicitation. The solicitation includes a detailed list of Evaluation Factors and provides instructions for Proposal Submission Requirements and the Basis for Award. The source selection process will be conducted in accordance with FAR Part 15.3 and DFARS Part 215.2 Source Selection Procedures. To view or download the solicitation requires registration at the SAM.GOV website at https://sam.gov/. Downloads and instructions are available through this website. Any amendments will only be available from this website. Offerors are responsible for checking the website frequently for any update(s) or amendments to this Solicitation. The government is not responsible for any loss of internet connectivity or for an offeror�s inability to access the document at the referenced website. Prior to bidding, vendors must be actively registered in the System for Award Management (SAM) system. The System for Award Management (SAM) is a Federal Government owned and operated free web site. All vendors must verify their information through this website. The point-of-contact for administrative for contractual questions is Christina Lawson, at phone: (816)-389-3182, or email: christina.j.lawson@usace.army.mil, or SFC Keandre Malone at (816)-389-3596 or email: keandre.d.malone@usace.army.mil. Contracting Office Address:�US Army Engineer District, Kansas City, ATTN: CECT-NWK-M, Federal Building, RM 635, 601 East 12th Street, Kansas City, MO 64106-2896. Place of Performance:�Water Intake Weir at Big Piney on Fort Leonard Wood in Missouri Point of Contact(s):�Christina J. Lawson, 816-389-3182.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/244ebd52c47d44c1bd1acd2ca877fb52/view)
 
Place of Performance
Address: Fort Leonard Wood, MO 65473, USA
Zip Code: 65473
Country: USA
 
Record
SN06427050-F 20220817/220815230127 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.