Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 19, 2022 SAM #7567
SOLICITATION NOTICE

J -- Boiler Plant (Building 16) Domestic Water Pumps Replacement

Notice Date
8/17/2022 12:17:57 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
241-NETWORK CONTRACT OFFICE 01 (36C241) TOGUS ME 04330 USA
 
ZIP Code
04330
 
Solicitation Number
36C24122Q1070
 
Response Due
8/23/2022 7:00:00 AM
 
Archive Date
10/22/2022
 
Point of Contact
Tnauri Woodbridge, Contract Specialist, Phone: 203-932-5711 x2892
 
E-Mail Address
tnauri.woodbridge@va.gov
(tnauri.woodbridge@va.gov)
 
Awardee
null
 
Description
Combined Synopsis-Solicitation for Commercial Items Effective Date: 08/01/2022 Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2022-06. This solicitation is set-aside for Small Business The associated North American Industrial Classification System (NAICS) code for this procurement is 238220 with a small business size standard of $16.5 Million. The FSC/PSC is J043. The Contracting Activity is seeking B-16 Domestic Water Pump Replacements at the West Haven VA Medical Center located at 950 Campbell Ave, West Haven, CT 06516. All interested companies shall provide quotations for the following: B-16 Domestic Water Pump Replacements Domestic Water Pump Replacements, West Haven Replacement of Domestic Water Pumps in B-16 Statement of Work The purpose of this statement of work is to provide an outline for the replacement of the Domestic water pumps located at the West Haven VAMC campus, West Haven, CT. The intent is to primarily replace most of the pumps that have been identified as ancient, antiquated, in need of repair, or not working at one identified location. The West Haven VAMC, originally established near 1949 under government control, has numerous domestic water pumps on station. Primary domestic water is brought to the facility s Boiler Plant (B-16), pumped to tanks on top of B-1 to be distributed through the station. Due to limited head pressures, pumps at B-1 SG level and B-2 G level are required to support upper floors. The B-16 s four pumps are believed to be original prior to government ownership of the facility. It would be unwise to say that these have not been reconditioned or rebuilt since 1949 though the quantity, frequency, and records of which are not known to current staff. Pump 2 s motor has been the most recent replaced though the date of which is unknown. The two pumps (not in scope) within B-1 are located within room SG101 and primarily are supplied by the tank within the space. These pumps supply the 8th and 9th floors of B-1 with domestic water. The gold-colored motor with the green pump casing was the most recently replaced unit (date unknown), with the other unit most likely rebuilt at some time in the past, though date of which is unknown. The two pumps (not in scope) within B-2 are located within room G139. These, at one time were supplied by the tank within the space, which is now bypassed, are supplied by the domestic water feed from B-1 and supply the 7th and 8th floors of B-2 with domestic water. Both units have most likely been rebuilt at some time in the past, though date of which is unknown. The VA would like to accomplish: All new pump systems shall be variable drive 208/480V compatible, set to 208V, of same size as existing. Replacement of all four domestic water pumps within B-16 with new pumps and motors. At any time during the replacement, at least two working pumps systems must be active to support facility needs. All new pump systems shall be inspected and tested prior to activation. Reasoning for rebuild vs replacement: It is the understanding of the VA that current supply lines and distribution channels are stressed based upon ongoing economic times. It is believed that the supply chain for new has been extended to two to three times that of just a few years ago, meaning that an ordered item such as new pumps and motors for the pump system can take 18-24 weeks. Refer to photos below for pump systems and plate information. A site visit is encouraged to gather other required information and shall be coordinated through the Contracting Officer/Specialist on this project. The Contractor is responsible for all construction materials and supplies to complete the installation and activation of the pumps systems. The Contractor shall be in coordination of deactivation, activation, and testing of each system with the VA. The contractor shall determine the long-lead items (new pump systems) shall be identified and determined within contract negotiations with the VA and Contractor. Anticipated M-F, 7am-4:30pm general workdays. Weekends and nights are not expected, with exception identified above. Working outside of the hours shall be coordinated between the Contractor, project COR and VA CO. GENERAL SPECIFICATIONS Parking: Parking is rigidly controlled throughout the Medical Center. Parking of vehicles in other than the specified areas will result in said vehicles being towed at the owner s expense off the Medical Center grounds. Coordinate removal and delivery of pump systems with the project COR for temporary arranged parking. Staging Areas: Due to limited space, the contractor is not expected to have set aside staging space to support the project. Arrangements can be made closer to date to request temporary limited storage space prior to installation and may be coordinated through the VA Plumbing shop, the contractor, and the project COR. Scheduling of Work: Upon receipt of the contract award, the Contractor must contact the project manager and CO to schedule the work. Work Completion: All work under this contract shall be completed within 60* days following the award of the contract and the issuance by the VA of the Notice to Proceed letter. Completion of the contract includes inspection of all installed project features by the project manager or designated alternate representatives. (*negotiated) Material & Workmanship Quality: All materials and workmanship shall comply with all applicable codes, regulations, and standards. All work shall be done in a first-class manner according to the best trade practices and to the satisfaction of the COR. Submittals: The contractor shall submit product samples, manufacturers literature, and data. In addition, the contractor shall pay specific attention to ensure timely submission of all product samples, manufacturers literature, and data covering the materials listed below that will be installed in this project. Site Specific Safety Plan including Activity Hazard Analysis (AHA) and Accident Prevention Plan (APP) may apply Lockout/Tagout Procedures plan All Safety Data Sheets (SDS) for all applicable materials All applicable work plans, infectious control plans, etc. (including drawings) if necessary All miscellaneous construction materials OSHA worker certifications and training Quality Control plan O & M Manuals (As Applicable) The contractor shall submit electronically each submittal for approval prior to installation of the related equipment. Materials shall not be ordered or installed prior to approval of the submittals. Direct all submittals through the VA project manager as directed by the VA CO. Pandemic Requirements Due to the nature of the pandemic and the risk factor for the patients and staff that take care of the patients, special requirements shall be taken to minimize potential exposure. Standard PPE requirements have included face masks that must always be worn. Facility policy for contractors can be supplied from the project s CO. Please be aware that the following may or may not apply to this project but must be stated and/or may be within the respective contract s expected verbiage: Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. The Government Agency owns the rights to all data/records produced as part of this contract. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.]. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information. B-16 Pump Systems Pump 1 Plates Pump 2 Plates Pump 3 Plates Pump 4 Plates The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html. The following solicitation provisions apply to this acquisition: FAR 52.212-1, Instructions to Offerors Commercial Items FAR 52.212-3, Offerors Representations and Certifications Commercial Items Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required. The following contract clauses apply to this acquisition: FAR 52.212-4, Contract Terms and Conditions Commercial Items Nov 2021 FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders May 2022 The following subparagraphs of FAR 52.212-5 are applicable: 52.219-6, 52.219-28, 52.219-32, 52.219-6, 52.222-26, 52.222-50, 52.223-18, 52.225-1, 52.225-13, 52.232-33 GRAY MARKET ITEMS (APR 2020) (a) No gray market or remanufactured items will be acceptable. Gray market items are Original Equipment Manufacturers (OEM) goods sold through unauthorized channels in direct competition with authorized distributors. This procurement is for new OEM medical equipment only for VA medical facilities. (b) Vendor shall be an OEM, authorized dealer, authorized distributor or authorized reseller for the proposed equipment/system, verified by an authorization letter or other documents from the OEM. All software licensing, warranty and service associated with the equipment/system shall be in accordance with the OEM terms and conditions. (End of clause) All quoters shall submit the following: QUOTE All quotes shall be sent to the Contract Specialist, Tnauri.Woodbridge@va.gov. Award will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government. The following are the decision factors: price, past performance, technical, speed of delivery, items available The award will be made to the response most advantageous to the Government. Responses should contain your best terms, conditions. ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS COMMERCIAL ITEMS Provisions that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The version of FAR 52.212-1 in the addendum is tailored for Simplified Acquisition Procedures and supersedes the current version of FAR 52.212-1 contained in the FAR. The following provisions are incorporated into 52.212-1 as an addendum to this solicitation: FAR 52.212-1 INSTRUCTIONS TO QUOTERS COMMERCIAL ITEMS North American Industry Classification System (NAICS) code and small business size standard are stated in the combined synopsis/solicitation. Submission of quotations. Submit quotations to the office specified in this solicitation at or before the exact time specified in this solicitation. Quotations may be submitted on letterhead stationery, or as otherwise specified in the solicitation. As a minimum, quotations must show- The solicitation number; The time specified in the solicitation for receipt of quotations; The name, address, and telephone number of the quoter; A technical description of the items being quoted in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary; Terms of any express warranty; Price and any discount terms; Remit to address, if different than mailing address; A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the quoter shall complete electronically); Acknowledgment of Solicitation Amendments; Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and If the quotation is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Quotations that fail to furnish required representations or information or reject the terms and conditions of the solicitation may be excluded from consideration. Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers unless another time period is specified in an addendum to the solicitation. Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of quotations. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender s request and expense, unless they are destroyed during testing. Multiple quotations. Quoters are encouraged to submit multiple quotations presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each quotation submitted will be evaluated separately. Late submissions Quoters are responsible for submitting quotations so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that quotations are due. Any quotation received at the Government office designated in the solicitation after the exact time specified for receipt of quotations is late and will not be considered unless it is received before purchase order issuance and the Contracting Officer determines that accepting the late quotation would not unduly delay the acquisition. If an emergency or unanticipated event interrupts normal Government processes so that quotations cannot be received at the Government office designated for receipt of quotations by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of quotations will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume. Issuance of purchase order. Quotations should contain the quoter s best technical and price terms. The Contracting Officer may reject any or all quotations. The Contracting Officer may issue a purchase order to other than the quoter with the lowest priced quotation. After the evaluation of quotations, the Contracting Officer may negotiate final terms with one or more quoters of the Government s choice before issuing any purchase order. The Contracting Officer will not negotiate with any quoters other than those of the Government s choice and will not use the formal source selection procedures described in FAR part 15. Multiple purchase orders. The Government may issue a purchase order for any item or group of items of a quotation, unless the quoter qualifies the quotation by specific limitations. Unless otherwise provided in the Schedule, quotations may not be submitted for quantities less than those specified. The Government reserves the right to issue a purchase order for a quantity less than the quantity quoted, at the unit prices quoted, unless the quoter specifies otherwise in the quotation. Availability of requirements documents cited in the solicitation. (i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to- GSA Federal Supply Service Specifications Section Suite 8100 470 East L Enfant Plaza, SW Washington, DC 20407 Telephone (202) 619-8925 Facsimile (202) 619-8978 If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision. Additional copies will be issued for a fee. Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites: ASSIST (https://assist.dla.mil/online/start/). Quick Search (http://quicksearch.dla.mil/). ASSISTdocs.com (http://assistdocs.com). Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by- Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm); Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462. Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance. Data Universal Numbering System (DUNS) Number. (Applies to all quotations exceeding the Micro-Purchase Threshold (MPT), and quotations of MPT or less if the solicitation requires the Contractor to be registered in the System for Award Management (SAM) database.) The quoter shall enter, in the block with its name and address on the cover page of its quotation, the annotation DUNS or DUNS+4 followed by the DUNS or DUNS+4 number that identifies the quoter s name and address. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the quoter to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR Subpart 32.11) for the same concern. If the quoter does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one. A quoter within the United States may contact Dun and Bradstreet by calling 1-866-705-5711 or via the internet at http://fedgov.dnb.com/webform. A quoter located outside the United States must contact the local Dun and Bradstreet office for a DUNS number. The quoter should indicate that it is a quoter for a Government contract when contacting the local Dun and Bradstreet office. [Reserved]. Requests for information. The contracting officer will not notify unsuccessful quoters that responded to this solicitation. Quoters may request information on purchase order(s) resulting from this solicitation from the contracting officer. (C$END-OF-PROV) To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows: ""The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition."" OR ""The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:"" Quoters shall list exception(s) and rationale for the exception(s), if any. Submission of your response shall be received not later than 10AM 08/23/2022 at Tnauri.Woodbridge@va.gov Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below. Point of Contact Tnauri Woodbridge tnauri.woodbridge@va.gov Work Phone: 203-932-5711
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b13c5d07be6d4855a99bd26bd7a728ef/view)
 
Place of Performance
Address: West Haven VAMC 950 Campbell Ave, West Haven, CT 06516, USA
Zip Code: 06516
Country: USA
 
Record
SN06430483-F 20220819/220817230125 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.