SOLICITATION NOTICE
Z -- Emergency Automatic Transfer Switch (ATS) Replacement 436-23-116
- Notice Date
- 8/19/2022 11:35:13 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- NETWORK CONTRACT OFFICE 19 (36C259) Greenwood Village CO 80111 USA
- ZIP Code
- 80111
- Solicitation Number
- 36C25922Q0638
- Response Due
- 9/6/2022 1:00:00 PM
- Archive Date
- 11/04/2022
- Point of Contact
- Jared Detton (CS), Contract Specialist
- E-Mail Address
-
jared.detton@va.gov
(jared.detton@va.gov)
- Small Business Set-Aside
- SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Awardee
- null
- Description
- 2 Statement of Work Automatic Transfer Switch Replacement Project Scope The VA Montana Healthcare System requires the services of a qualified General Electrical Contractor to replace the existing Automatic Transfer Switch (ATS) supporting the backup power system for our Miles City facility. The Contractor shall also be responsible for all damages to persons or property that occurs as a result of the Contractor s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract. Site Investigation is highly recommended for this project to ensure accuracy of scope. This is intended to limit unforeseen site conditions not indicated on the drawings. Background and Facility Existing Site Conditions ATS failed and the switch gear will not switch which caused the generator test to fail. Existing ATS cannot be repaired due to age and parts availability. This is an urgent requirement. Tasks and Requirements General Contractor Requirements General Contractor shall provide a certified Construction/Project Manager for this requirement to oversee and provide Quality Control during the construction period. Contractor will provide all materials and labor to perform the work outlined in this scope. Submittals must be reviewed and approved by the VA prior to the start of work. All damage to any VA property to be repaired/replaced by the contractor. Contractor shall be responsible for all construction debris removal. The contractor shall provide their own dumpster as needed. Period of Performance All work to be completed within 14 days of the Construction Notice to Proceed (NTP). Submission of safety plans, quality control plan, phasing, schedules, pre construction submittals, etc. shall be required to be submitted within 7 days of the Administrative NTP. Place of Performance Miles City Community Living Center. Miles City VA Community Living Center is located at 210 South Winchester Avenue, Miles City, MT 59301 Work Schedule Work will be performed during normal business hours 7:00 AM 5:00 PM. Coordinate working schedule with the COR prior to beginning construction. Any work to be performed outside normal business hours and on weekends or holidays will need to be coordinated with the COR three days prior. Privacy Statement Information Security: The C&A requirements do not apply, a Security Accreditation Package is not required. Incidental exposure to protected health information may occur from accessing the work site. Staff will follow all Privacy & Security policies and procedures. Post Construction Quality Validation Warranty of Construction, the Contractor is to provide a one (1) year warranty period, from the date of final acceptance of the work, covering defects related to all work performed and any materials/equipment included in the project.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/d351dc4c08f14d7188ab10416be1b425/view)
- Record
- SN06434283-F 20220821/220819230112 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |