Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 24, 2022 SAM #7572
MODIFICATION

65 -- Brand Name Only Vancouver/Astoria Ceiling Lifts

Notice Date
8/22/2022 10:03:27 AM
 
Notice Type
Solicitation
 
NAICS
339113 — Surgical Appliance and Supplies Manufacturing
 
Contracting Office
260-NETWORK CONTRACT OFFICE 20 (36C260) VANCOUVER WA 98662 USA
 
ZIP Code
98662
 
Solicitation Number
36C26022Q0785
 
Response Due
8/29/2022 4:00:00 PM
 
Archive Date
09/28/2022
 
Point of Contact
Matthew A Combes, Contract Specialist
 
E-Mail Address
matthew.combes@va.gov
(matthew.combes@va.gov)
 
Awardee
null
 
Description
Statement of Work A quote that include all parts, rails, hardware, and equipment to result in a safe and working system. Quote must be presented as firm fixed price and must include the cost of installation. The ability for full XY coverage in all patient care rooms and maximum coverage in patient bathrooms. The ceiling lifts in patient care rooms must have an integrated scale built into the motor casing and is operable via the lift handset; which is attached to the lift in a way that prevents loss, and no decrease in working height. The scale must be able to weigh the patient in either pounds or kilograms and the weight visible on the hand control. The lifts and hangar bar must be able to withstand a patient weight of 770lbs. lifting capacity. Operation of the system must allow for adequate lifting height, allowing for transfer of patient from wheelchair/exam table/toilet, as well as adequate lifting height for the turning and repositioning of the patient on the exam table or lowering height for fall recovery off the floor. The hanger bars must be able to be changed out by the medical center s staff without the assistance of contractor, vendor or special tools. The emergency lowering feature must be operable without the use of any additional tools and the lift motor must be able to be reset by staff without any additional tools, allowing immediate use of the lift after activation of the emergency stop/lowering feature, without the need to call engineering or the manufacturer to reset the lift. The lifting motors will have internal gears that are made of metal, not plastic. Plastic gears may be less stable than metal gears, which may pose a safety issue for patients and staff.  Integrated Technology option for future use that would show lift times and usage via Bluetooth The system s operation must maintain a continuous charge on the rail. Compatible with all loop slings with statement from manufacturer The contractor must also provide a statement that the current hospital approved equipment cleaner/disinfectant may be used to decontaminate both the lifts and the slings. Operation of the system must be smooth with no fast or jerky starts and stops. There must be a minimum warranty period of greater than or equal to three years with part and labor included. Ceiling lifts must be compatible and warranted for use with loop slings including the full range of Guldmann lifting and repositioning slings, Arjo lifting slings, and Alpha Modalities repositioning slings. The company will to provide certification of 2 employees prior to installation of our motors at your facility to handle any repairs you want to handle in house.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/813bc54be9e941faa9a078b6c7f88e48/view)
 
Record
SN06435521-F 20220824/220823060732 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.