Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 24, 2022 SAM #7572
SOLICITATION NOTICE

71 -- Mobile Shelves and Tactical Lockers

Notice Date
8/22/2022 7:02:21 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
337215 — Showcase, Partition, Shelving, and Locker Manufacturing
 
Contracting Office
FA5682 31 CONS DA LGC APO AE 09604-6102 USA
 
ZIP Code
09604-6102
 
Solicitation Number
FA568222Q7045
 
Response Due
9/6/2022 1:00:00 AM
 
Archive Date
09/21/2022
 
Point of Contact
A1C MaryAnn Mallard, Phone: +39 043 430 7132, MELISSA MAURHART, Phone: 390434304318
 
E-Mail Address
maryann.mallard@us.af.mil, melissa.maurhart.it@us.af.mil
(maryann.mallard@us.af.mil, melissa.maurhart.it@us.af.mil)
 
Description
Warranty: Warranty terms must be submitted in a separate document and will be attached to the contract. Technical Literature: the contractor shall submit technical product literature with its quote. Proposed Delivery Schedule: the contractor shall submit a firm lead time with its quote. We are Seeking the Following: CLIN 0001 Tactical Readiness Lockers 1. Must have corner gussets 2. Must have user interchangeable parts 3. Must have Double-wall welded doors 4. Must have Diamond perforated mesh doors 5. Must have Stainless steel lock plate 6. Must have no lock but have a hasp only for padlock 7. Must fit in 480"" x 36"" area 8. Must be user moveable 9. Must be 94�-98� tall 10. Must include at least 48 lockers 11. Lockers must be 3 high per Unit and have Dimensions: 30�D x 30�W 12. Must be one of the following colors (green, grey, tan, black) 13. Must come Assembled or be Assembled by Contractor on Site (Include Shipping and Assembly in Price) CLIN 0002 Mobile Shelving System 1. Must have Width between 175-227"" 2. Must have Depth between 120-152"" 3. Must have Height between 75-90"" 4. Must be able to lock down into place to minimize pilfering 5. Must be a High Density Mobile System 6. Requires Solid Metal Shelves with Dimensions: 24�D x 24�W 7. Must have a Mechanical-Assist Hand Crank system on each section to open the shelves 8. Mechanical-Assist system must be capable of moving 4,000 Lbs of equipment 9. Must come with 80 adjustable shelves and 60 adjustable dividers 10. Must have 36"" openings for walking in between each Shelving unit 11. Must be installed on a rail platform system 12. Shelving must be full depth for outer shelves and divided for inner shelves 13. Shelving myst have closed sides and backs. 14. The Shelf dividers must be adjustable 15. Carriages must have the following dimensions:�Depth is between 120-145"" and width is 24 "" for ends and 48 inches for the other 3 pieces. (Include Shipping in Price) CLIN 0003 On- Site Installation of Mobile Shelving System Warranty: Warranty terms must be submitted in a separate document and will be attached to the contract. Technical Literature: the contractor shall submit technical product literature with its quote. Proposed Delivery Schedule: the contractor shall submit a firm lead time with its quote.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/5972355876fd48bca6f811733ee2a21f/view)
 
Place of Performance
Address: APO, AE 09603, ITA
Zip Code: 09603
Country: ITA
 
Record
SN06437366-F 20220824/220823060746 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.