SOLICITATION NOTICE
99 -- PARTS KIT,BALL VALV
- Notice Date
- 8/22/2022 8:42:36 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
- ZIP Code
- 17050-0788
- Solicitation Number
- N0010422QFF56
- Response Due
- 8/25/2022 10:00:00 PM
- Archive Date
- 09/10/2022
- Point of Contact
- Telephone: 7176051234
- E-Mail Address
-
SYLVIA.SENTZ@NAVY.MIL
(SYLVIA.SENTZ@NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N743.45|WVN|717-605-3353|sylvia.sentz@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| INSPECTION/ACCEPTANCE POINT|6||||||| TIME OF DELIVERY (JUNE 1997)|20|0001|5|145 days|||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Stand-Alone Receiving Report - Certifications Combo-Receiving Report & Invoice - Material |n/a|tbd|N00104|tbd|N39040 - Certifications, S4306A - Material|N50286|tbd|133.2|n/a|n/a|S4306A - Material|n/a|n/a|See DD 1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (SEP 2021)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| The offer due date is extended to 26 August 2022. 1. Data Item A001 (inspection and Test Plan) may be waived if already on fileat NAVSUP WSS Mech. 2. Drawings associated with this solicitation will be made available on theSAM.gov website but will be restricted access which needs to be approved. Onceaccess has been requested, interested vendors should email the POC listed onthe solicitation to inform them of the request. 3. NAVSUP WSS Mech will be considering past performance in the evaluation ofoffers. See Clause 252.213-7000. 4. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Governments acceptance of the contractorsssproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed here in. 5. The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (145 days) Delivery days and past performance will be evaluation factors in determining awardee. 6. All transportation to/from repair site will be paid for by the US Navy. 7. This contract utilizes Commercial Asset Visibility (CAV). See clauseNAVSUPWSSFA24 for further details. 8. Offers shall be submitted as Firm Fixed Price for the full repair effortbased on the Repair Instruction or SOW. If the vendor is unable to provide aFirm Fixed Price, a Not-To-Exceed Price for the full repair effort will beacceptable. If a Not-To-Exceed Price is offered, the contractor shall have 90days to complete a teardown and evaluation of the carcass(es) and submit aRepair Report and Firm Fixed Price offer for the repair. Repair shall not begin until the contract is definitized. In addition to the repair price, include the prices for cost of new and forbeyond repair (BR)/beyond economic repair (BER). 9. Include in Estimated/Not-To-Exceed Repair Price all costs associated withreceipt and complete repair of material that may be in unwhole condition,missing hardware, damaged, handling damage, missing parts, wear damage, andCAV reporting. Also, please provide the following: a. Teardown and Evaluation rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration Date: 10. Any contract/order awarded as a result of this solicitation will be a ""DO""rated order certified for national defense use under the Defense PrioritiesandAllocations System (DPAS). See 52.211-14, Notice of Priority Rating forNational Defense, Emergency Preparedness, and Energy Program Use. 11. This repair effort is issued pursuant to Emergency Acquisition Flexibilities. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 2.2.3 Specification Revisions - The specification revisions listed under ""Documents References"" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DRAWING DATA=2640-801X1E1 |53711| A|ER |D|0001 | A|49998|6353077 DRAWING DATA=7285297 |53711| E| |D|0001 | E|49998|0862180 DRAWING DATA=7285297 |53711| E| |D|0002 | E|49998|0392982 DRAWING DATA=7285297 |53711| E| |D|0003 | E|49998|0280881 DRAWING DATA=7285297 |53711| E| |D|0004 | E|49998|0204692 DRAWING DATA=8617511 |53711| N| |D|0001 | |49998|3447332 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| |01| DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| | | DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B367 | | | |130701|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=MIL-PRF-9954 | | |D |090416|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markings to each unit throughout refurbishment. 3.1.2 IDENTIFYING MARKINGS - Part must have a MIC (Material Identification a and Control) code, heat/heat lot code, or unique Contractor traceability number/code that is visible on the part. See Material Traceability in paragraph 3 (Quality Assurance Provisions) of this contract for traceability requirements. The MIC code can consist of a 2, 3, or 4 letter material identifier, 4 or 5 digit Julian date, 3 digit lot serial number, and Certifying Activity Designator (CAD) which will be 1 or 2 letters; the 4 parts are normally separated by hyphens; examples: TIA-3089-30-QQ and ST-06262-506-A. 3.1.3 RE-USEABLE PARTS - - Any parts of the original assembly that are useable (replacement is not necessary), that are properly marked as identified above, and that have material certifications available may be utilized as initially supplied. Certifications are not required to be resubmitted by the contractor. - Any parts of the original assembly that are useable (replacement is not necessary), are properly marked as identified above, but material certifications are not available at the contractor's facility, a waiver must be submitted in accordance with Waiver/Deviation (Configuration Control) requirements specified elsewhere in the Contract. 3.1.4 NON-USEABLE PARTS - -Any parts of the original assembly that are not properly marked as identified above must be replaced and the required certifications must be submitted. - Any parts of the original assembly that are not usable (replacement is necessary) must be replaced and the required certifications must be submitted. 3.1.5 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;NAVSEA Drawing 845-8617511 for one Ball, piece 62LI and NAVSEA Drawing 845-7285297 along with ER2640-801X1E1 for 2 mating Seats, piece 22; , except as amplified or modified herein. This applies to all ""Parts Requiring Certification"" as identified elsewhere in this Contract/Purchase Order. 3.1.6 ADDITIONAL SOW REQUIREMENTS - ;Balls which are not usable must be dispositioned and new balls are not to be manufactured under this contract.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Ball - piece 62LI on NAVSEA drawing 8617511; Material - SAE-AMS-6931 OR Centrifugally cast 6AL-4V, ASTM-B367, Grade C-5, with mechanical properties as listed in supplementary Requirement S6. Note: Mechanical properties for bars, forgings and forging stock over 10"" must be as specified in the applicable drawing. If the mechanical properties are not provided in the drawing, the mechanical properties specified in SAE-AMS-6931 Table 2 for material 6"" to 10"", must be applied. Part - ;Seats (Q3) - piece 22 on NAVSEA drawing 7285297; Material - Delrin: Dupont AF DE588 (Teflon Filled Acetal) (Properties Specified Below Only) ITEM PROPERTY ASTM TEST METHOD VALUE (A) Specific Gravity D792 (Note 1) 1.50 - 1.57 (B) Melting Point D2133 or D3418 172 - 184 deg C (342 - 363 deg F) (C) Tensile Strength (MIN) D638 (Notes 1 & 5) 6100 PSI (D) Tensile Impact (MIN) D1822 Type S (Notes 1 & 5) 5 FT-LB/SQ IN (E) Compressive Stress D695 2100 @ 1% DEF. (MIN - PSI) (Notes 1 & 5) 11,000 @ 10% DEF. (F) Water Absorption D570 .30% MAX 24 Hours (G) Rockwell Hardness (R) D785 (Note 1) 115 +/- 15 (H) Teflon Fiber Content (Note 2) 18 - 23% (I) Dimensional Change (Note 4) .7% MAX NOTES: 1. Material conditioning prior to test is at the vendor's option. 2. Teflon Fiber Content - As certified by DuPont (raw material). 3. Visual and Dimensional Inspection of Product (Final Machined Condition) - White Teflon string inclusions must not exceed the following: A. Diameter 1/32"" B. Length 1/8"" C. Density 6 indications per 100 SQ IN 4. The test method to determine dimensional stability must be performed as follows: The test specimens (finished pieces) tested must be measured at 23 +/- 3 deg C (73 +/- 5F) and placed in a mineral oil bath maintained at 160 +/- 3 deg C (320 +/- 5F) the specimens must remain in the bath for six (6) hours at temperature and allowed to slow cool in the bath at a rate not to exceed 23 +/- 3 deg C (73 +/- 5F) per hour. When the bath reaches 23 +/- 3 deg C (73 +/- 5F), the test specimens must be removed and measured. The percent change in each dimension, outside diameter, inside diameter and thickness must not be greater than the value specified. ^Mineral oil meets the specification as listed below: Description.......................Passes U.S.P. Test (USP XX, P.1143) Solubility........................Passes U.S.P. Test (USP XX, P.1143) Neutrality........................Passes U.S.P. Test (USP XX, P.532) Readily Carbonizable Substances...Passes U.S.P. Test (USP XX, P.532) Limit of Polynuclear Compounds....Passes U.S.P. Test (USP XX, P.532) Solid Paraffin....................Passes U.S.P. Test (USP XX, P.532) Specific Gravity @ 25 deg C (77 deg F).0.8600 to 0.8900 Viscosity @ 37.8 deg C (100F).....73.6 to 84.4 Centistokes (340-390 SUS) Flash Point Cleveland Open Cup....420 deg F (216C) (Typical) Refractive Index @ 20C (68F)......1.480 (Typical) 5. Values are minimum mean values. Individual specimen values may not vary more than 25% below the specified minimum mean value. Should one specimen exceed the 25% criteria, retest is required. Failure to meet the above criteria a second time is cause for rejection. 3.3 ;Note Clarification: The note in Zone 6F of drawing 7285297 is missing punctuation that may cause misinterpretation that the slot is only required for pieces 30 and 33. The slot is required on all seats on drawing 7285297. The note must be punctuated as follows: 1 SLOT LOCATE AS SHOWN R.06 x .03 DEEP. SEE SECTION 2-6D FOR PC 30 & 33 ONLY.; 3.4 Ball Spherical Surface Finish - Spherical surfaces of valve balls must be finished as follows: Machine finish spherical surfaces of the valve ball to between 30 and 35 RHR; use lubricant. Grind, hone, or cup polish to 16 RHR maximum; use lubricant (light oil or soap solution). Grit blast with glass bead media (MIL-PRF-9954-MIL 10); use a 3/16 inch ID blasting nozzle (not supersonic type) 4 inches from ball at 75 PSI air pressure. The resulting surface finish should be less than 25 RHR.Perform final polish with SUPFINA Polishing Paste (Pink polishing paste, item code 10100244, Supfina Machine Company, North Kingstown, RI). Apply the SUPFINAPolishing Paste that is initially light pink in color over the entire surface of the ball with a brush and perform a low speed finishing process with both theball and a .250"" thick wool pad (Style 22110, Aetna Felt Corporation, Allentown, PA^) turning at the same time with light pressure for approximately 30 seconds^^ (3 revolutions) of the entire surface of the ball. Once the light pink SUPFINA polishing paste that was applied to the surface of the ball turns a grey color, the final finishing process is complete. After the final finishingprocess is complete, the surface of the ball should have a matte dull appearance with a surface finish between RHR 12 and RHR 16. Clean ball with a warm, alkaline solution or a liquid nonionic detergent to remove SUPFINA polishing paste. ^ Reference customer number PLI00499 when ordering wool pad. ^^ CAUTION: Excessive time will cause the ball to be polished in violation of the process."" 3.5 Ball Spherical Surface Waviness - Unless otherwise specified on drawing, all sealing area surfaces must have a spherical surface waviness which does not exceed 0.0005 inches of height per inch of spherical surface. Roughness and waviness ratings must apply in a direction which yields the maximum rating, normally perpendicular to the lay. 3.6 ;Balls which require reworking beyond the limitation specified herein are to be dispositioned as noted elsewhere in the contract.; 3.7 ;Defects in the ball stem slot are acceptable if backlash between the ball and stem does not exceed 5 degrees and defects do not exceed 0.050 in depth or c cover more than 40% of the surface area.; 3.8 ;Ball outside diameter may be reworked to a minimum of 5.113 inches to refurbish the ball surface to meet drawing requirements and represents a relaxation below the drawing dimension. All other dimensions apply.; 3.9 ;Seats are to be manufactured and must meet the drawing stack height requirement when mated with the refurbished ball.; 3.10 Seat Stack Height Measurement - To ensure that each seat is within tolerance, check each seat singularly by measuring the seat height over the ball. This measurement is calculated by adding one-half ball diameter to the half stack height dimension on the drawing. Limits are determined by the ball diameter tolerance and the half stack height tolerance. Check dimensions by measuring from the seat back face to top of ball. Manufacturers of seats that do not have a ball of the required size available will be required to manufacture a dummy ball or segment of a ball with sufficient spherical surface to check the above dimension. 3.11 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.12 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.13 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.13.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.13.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.13.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.14 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.15 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.15.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.15.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.15.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.16 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.17 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.18 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.18.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.19 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.19.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.19.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.19.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the contract. 3.19.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.19.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.19.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.19.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.19.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.19.9 When production or repair welding is required on titanium materials, theapplicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.19.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.19.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.19.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.20 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.20.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/non-acceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.20.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.20.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.20.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.20.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.21 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.21.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition...
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/9a949b840fd3441f9b398d29f179d893/view)
- Record
- SN06437464-F 20220824/220823060747 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |