Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 26, 2022 SAM #7574
SOLICITATION NOTICE

Y -- Big Bend Left Abutment Collector Pipe System

Notice Date
8/24/2022 1:48:10 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W071 ENDIST OMAHA OMAHA NE 68102-4901 USA
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F22R0057
 
Response Due
9/19/2022 10:00:00 AM
 
Archive Date
10/04/2022
 
Point of Contact
Lynne D. Reed, Phone: 4029952039, John Hickman, Phone: 4029952613
 
E-Mail Address
lynne.d.reed@usace.army.mil, john.d.hickman@usace.army.mil
(lynne.d.reed@usace.army.mil, john.d.hickman@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
***UPDATE - AMENDMENT 0001 IS POSTED IN THE ATTACHMENT LINK.� Please be sure to acknowledge the amendment by signing and sending the amendment in with the offfer.*** ***UPDATE TO SITE VISIT***� THE SITE VISIT HAS CHANGED FROM 16 AUGUST 2022 TO TUESDAY, 30 AUGUST 2022 AT 10:00 AM CT.� AN AMENDMENT IS BEING GENERATED AND WILL BE POSTED TOMORROW, 24 AUGUST 2022.�� POC FOR SITE VISIT: Phil Schroeder and Cobly Brakke 605-680-2719 - Please call to make reservations*** ***UPDATE - Documents have been updated, please email Lynne Reed at lynne.d.reed@usace.army.mil if you are not able to open the new documents. *** Big Bend Left Abutment Collector Pipe System, Fort Thompson, South Dakota.� The U.S. Army Corps of Engineers (USACE), Omaha District NWO, intends to pursue an award for the replacement of the Left Abutment Collector Pipe System located at the Big Bend Dam in Fort Thompson, South Dakota.��The work covered in this section is outlined as a statement of�construction requirements common to all the work. Specific requirements�for materials and installations are provided under the Technical Sections�herewith. No claims for extras shall be made on account of items presumed�to have been omitted from this section. The work includes but not limited�to the removal and replacement of the existing left abutment collector�pipe system located on the the downstream left abutment of Big Bend Dam.�The left abutment collector pipe system consists of the existing toe drain�pipe, toe drain outfall, relief well collector, and relief well casing�outfalls. Work to include extending the relief well collector into the�relief well channel and backfilled. Six (6) existing wells are to be�abandoned (RW-66, RW-66A, RW-67, RW-68, RW-68A, RW-68B) and piezometer�(OW20-02) as part of this contract. Abandonment or removal of existing�relief well casing outfalls as indicated on the contract drawings. The new�left abutment collector pipe system will connect existing wells (RW-66B�and RW-67A) and six (6) replacement relief wells (RW-66R, RW-66AR, RW-67R,�RW-68R, RW-68AR, RW-68BR). The six (6) replacement relief wells will be�installed by USACE prior to Contractor mobilizing to the site. Installation of four new manholes and two risers are a part of this�contract. Extension of 24"" CMP Culvert A and 24"" RCP storm drain. A rip�rapped apron will be constructed at the new relief collector pipe outfall�location of the left abutment collector pipe system.� Proposals are due on or before 19 September 2022 by 1200 PM CT.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/796376c76587409587e80672d978ce70/view)
 
Place of Performance
Address: Fort Thompson, SD 57339, USA
Zip Code: 57339
Country: USA
 
Record
SN06438727-F 20220826/220824230118 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.