Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 26, 2022 SAM #7574
SOLICITATION NOTICE

48 -- 48--VALVE,BALL, IN REPAIR/MODIFICATION OF

Notice Date
8/24/2022 6:41:13 AM
 
Notice Type
Solicitation
 
NAICS
332911 — Industrial Valve Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
 
ZIP Code
17050-0788
 
Solicitation Number
N0010422QZB80
 
Response Due
9/18/2022 9:00:00 PM
 
Archive Date
10/04/2022
 
Point of Contact
Telephone: 7176057562
 
E-Mail Address
AMANDA.SWIGONSKI@NAVY.MIL
(AMANDA.SWIGONSKI@NAVY.MIL)
 
Description
CONTACT INFORMATION|4|N742.4|WV4|(717) 605-7562|amanda.a.swigonski.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|see specification sections C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| INSPECTION/ACCEPTANCE POINT|6||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| REPAIR DELIVERY (FIRM FIXED PRICE)|1|365| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report|N/A|TBD|N00104|TBD|Certifications - N39040; Material -S4306A |N50286|TBD|133.2|N/A|N/A|Certifications-N39040|N/A |N/A|see DD 1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery |one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|332911|750 (# of employees)|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. The resultant award of this solicitation will be issued bilaterally,requiring the Contractor's written acceptance prior to execution. 2. The following proposed delivery schedule applies: RADIOGRAPHIC SHOOTING SKETCHES (RSS) 45 DAYS AFTER CONTRACT AWARD PRIOR TOPERFORMING RADIOGRAPHY. REVIEW (APPROVAL/DISAPPROVAL) MUST BE ACCOMPLISHED WITHIN 30 DAYS FROM DATE OFRECEIPT. PRODUCTION RADIOGRAPHY (PR) 135 DAYS AFTER APPROVAL OF RADIOGRAPHIC SHOOTINGSKETCHES. REVIEW (APPROVAL/DISAPPROVAL) MUST BE ACCOMPLISHED WITHIN 30 DAYS FROM DATE OFRECEIPT. Submission of Certification Data CDRLs will be on or before 20 days prior toscheduled delivery. PNSY review/acceptance of Certification CDRLs 6 workingdays after receipt of Certification DD 1423 CDRLs. Final delivery of material shall be on or before 365 days after the effectivedate of the resulting contract. 3. This is a Level 1 Repair. 4. DD1423 Data Item A001 may be waived if already on file at NAVSUP WSS Mechanicsburg. 5. Any contract awarded as a result of this solicitation will be ""DO"" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 6. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with FAR 13.106(a)(2) and DFARS 252.213-7000. 7. This requirement utilizes Government Furnished Property (GFP). Any GFP located at the Contractor's facility in storage that can be used for repair of that requirement must be utilized and called out within the final quote. 8. The Contractor shall comply with the Commercial Asset Visibility (CAV) of the asset(s) in this order in accordance with NAVSUPWSSFA24. 9. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or send by other electronic commercemethods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual documents as detailed herein. 10. If supplies will be packaged at a location different from the offeroraddress, the offeror shall provide the name, street address, and cage code ofthe packaging facility. 11. This requirement requires access to classified drawings. These drawings are not required to submit a quote, however, in the event of an award, a facility clearance may be required in accordance with 52.204-2. 12. Drawings associated with this solicitation will be made available athttps://sam.gov/content/home. Dawings have restricted access which needs to be approved. Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request. 13. Offers shall be submitted as Firm Fixed Price for the full repair effort based on the Repair Instruction or SOW. Please include the following: a. Teardown and Evaluation rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration Date: A cost of new price shall also be provided in addition to the repair price. Reconciliation A reconciliation modification will be issued after final inspection andacceptance of all assets inducted under this contract. The parties have agreedto a price (shown on the schedule page) for each unit at the negotiated RTAT.Such prices are based on the Contractor meeting the RTAT requirements Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Requested RTAT: 365 Days Proposals shall reference the proposed RTAT and any capacity constraints. 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.3 Specification Revisions - The specification revisions listed under ""Docu ments References"" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.1 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. DRAWING DATA=255122 |43689| P| |D|0001 | P|49998|0527806 DRAWING DATA=255123 |43689| J| |D|0001 | J|49998|0237878 DRAWING DATA=255582 |43689| M| |D|0001 | M|49998|0163184 DRAWING DATA=255583 |43689| L| |D|0001 | L|49998|0365060 DRAWING DATA=255584 |43689| J| |D|0001 | J|49998|0383474 DRAWING DATA=255587 |43689| H| |D|0001 | H|49998|0300795 DRAWING DATA=255588 |43689| M| |D|0001 | M|49998|0425967 DRAWING DATA=255589 |43689| F| |D|0001 | F|49998|0189761 DRAWING DATA=255590 |43689| G| |D|0001 | G|49998|0418515 DRAWING DATA=256122 |43689| D| |D|0001 | D|49998|0450109 DRAWING DATA=4384678C01 |53711| C|DN |D|0001 | C|49998|0067532 DRAWING DATA=4384678C01 |53711| C|DN |D|0002 | C|49998|0045081 DRAWING DATA=4384678C01 |53711| C|DN |D|0003 | C|49998|0030946 DRAWING DATA=4384678C02 |53711| C|DN |D|0001 | C|49998|0041260 DRAWING DATA=4384678C03 |53711| C|DN |D|0001 | C|49998|0035403 DRAWING DATA=4384678C04 |53711| C|DN |D|0001 | C|49998|0040252 DRAWING DATA=4384678C05 |53711| C|DN |D|0001 | C|49998|0033942 DRAWING DATA=4384678C06 |53711| C|DN |D|0001 | C|49998|0033961 DRAWING DATA=4456141 |80064| A| |X|0001 | A|00026|0000000 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=ASTM-B367 | | | |130701|A| | | DOCUMENT REF DATA=ASTM-B369 | | | |090401|A| | | DOCUMENT REF DATA=ASTM-A494 | | |A |141001|A| | | DOCUMENT REF DATA=ASTM-B505 | | | |140401|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ASTM-E1417 | | | |130601|A| | | DOCUMENT REF DATA=ASTM-E1444 | | | |160616|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=SAE AMS 2631 | | |E |171201|A| | | DOCUMENT REF DATA=ASTM-D4066 | | | |130701|A| | | DOCUMENT REF DATA=ASTM-D5363 | | | |160401|A| | | DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-C-24723 | | | |890607|A| | | DOCUMENT REF DATA=MIL-N-25027 |0001| |A |990331|A| 1| | DOCUMENT REF DATA=MIL-DTL-32286 | | | |090408|A| 2| | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |A |950907|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=AIA/NAS NASM 25027 | | |1 |121221|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | | |950801|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.0.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout refurbishment. 3.0.2 IDENTIFYING MARKINGS - Part must have a MIC (Material Identification and Control) code, heat/heat lot code, or unique Contractor traceability number/code that is visible on the part. See Material Traceability in paragraph 3 (Quality Assurance Provisions) of this contract for traceability requirements. The MIC code can consist of a 2, 3, or 4 letter material identifier, 4 or 5 digit Julian date, 3 digit lot serial number, and Certifying Activity Designator (CAD) which will be 1 or 2 letters; the 4 parts are normally separated by hyphens; examples: TIA-3089-30-QQ and ST-06262-506-A. 3.0.3 RE-USEABLE PARTS - - Any parts of the original assembly that are useable (replacement is not necessary), that are properly marked as identified above, and that have material certifications available may be utilized as initially supplied. Certifications arenot required to be resubmitted by the contractor. - Any parts of the original assembly that are useable (replacement is not necessary), are properly marked as identified above, but material certifications arenot available at the contractor's facility, a waiver must be submitted in accordance with Waiver/Deviation (Configuration Control) requirements specified elsewhere in the Contract. 3.0.4 NON-USEABLE PARTS - -Any parts of the original assembly that are not properly marked as identifie d above must be replaced and the required certifications must be submitted. - Any parts of the original assembly that are not usable (replacement is necessary) must be replaced and the required certifications must be submitted. 3.0.5 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Newport News Drawing 255122, Assembly RF, (Less Hydraulic Actuators) and MS NO. 5640-081-141 REV F (CSD230); , except as amplified or modified herein. This applies to all ""Parts Requiring Certification"" as identified elsewhere in this Contract/Purchase Order. 3.0.6 Additional SOW Requirements - ;N/A; 3.1 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, piece 43 on Drawing 255122; Material - MIL-C-24723, alloy M30C (with the applicable requirements of ASTM-A494) or ASTM-B369, UNS C96400. Part - ;Discharge Cover, piece 15 on Drawing 255122; Material - ;ASTM-B369, Alloy UNS C96400; Part - ;Stem, piece 44 and Stem, piece 6 on Drawing 255122; Material - ;QQ-N-286, Form 2 Annealed and Age Hardened or Form 7 Annealed and Age Hardened; Part - ;Stem Retaining Nut, piece 7 and Stem Retaining Nut, piece 9 on Drawing 255122; Material - ;ASTM-B505, Alloy UNS C90300; Part - ;Studs, piece 25 on Drawing 255122; Material - ;MIL-DTL-1222, Type IV, QQ-N-286, Annealed and Age Hardened and marked .K; PART - ;Self-Locking Heavy Hex Nuts, piece 29 on Drawing 255122; MATERIAL - QQ-N-281, Class A or B, in accordance with MIL-N-25027/1. All material must be the same Class. SELF-LOCKING ELEMENT - ASTM-D4066, Group 01, Class 1 or 2, Grade 1. For Boilerplate R00375, Part - ;Ball, piece 1 and Ball piece 2 on Drawing 255122; Material - SAE-AMS-6931 OR Centrifugally cast 6AL-4V, ASTM-B367, Grade C-5, with mechanical properties as listed in supplementary Requirement S6. Note: Mechanical properties for bars, forgings and forging stock over 10"" must be as specified in the applicable drawing. If the mechanical properties are not provided in the drawing, the mechanical properties specified in SAE-AMS-6931 Table 2 for material 6"" to 10"", must be applied. Part - ;Seat (Q3), piece 3 and Seat (Q3), piece 4 on Drawing 255122; Material - MD71-GG Mearthane (Graphite Filled Urethane). Material must be manufactured by Mearthane Products Inc. Cranston, RI. (Properties Specified Below Only) ITEM PROPERTY ASTM TEST METHOD VALUE (A) Hardness D2240 70 +/- 5 Shore D (B) Specific Gravity D792 1.18 +/- 0.02 (C) Tensile Strength D412 (DIEC) 5000 PSI MIN (D) Compression-Defl D575 700 PSI MIN @ 2% DEF. (E) Tensile Impact D1822 300 FT-LB/SQ IN (Note 1) (TYPE L SPECIMEN) (F) Water Absorption D570 1.5% MAX (1 Week at R.T.) Note 1: These values are minimum averages. Separate specimen values may not vary more than 25% under the specified minimum. 3.2 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Liquid Penetrant Inspection; Item - ;Studs, piece 25 on Drawing 255122; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Dye Penetrant Inspection for Non-Magnetic Grades; Item - ;Self-Locking Heavy Hex Nuts, piece 29 on Drawing 255122; Performance - T9074-AS-GIB-010/271 or ASTM-E1417/ASTM-E1444 (Method C solvent removal techniques must not be used on thread) Acceptance - ;NASM25027; Attribute - Annealing and Age Hardening Item - ;Stem, piece 44, Stem, piece 6 and Studs, piece 25, on Drawing 255122; Performance - QQ-N-286 Test - Weldability Test of ASTM-B369 material Item - ;Body, piece 43 and Discharge Cover, piece 15 on Drawing 255122 (Note: only required for Body, piece 43 if material is ASTM-B369); Performance - ASTM-B369 Acceptance - ASTM-B369 Test - Weldability Test of MIL-C-24723 material Item - ;Body, piece 43 on Drawing 255122 (Note: only required for Body, piece 43, if material is MIL-C-24723); Performance - ASTM-A494 Acceptance - ASTM-A494 Test - Pressure Tests Item - Each Assembly Performance - ;MS NO. 5640-081-141 paragraph 1.t and 1.u; Acceptance - ;MS NO. 5640-081-141 paragraph 1.t and 1.u; Test - Quality Conformance Tests Item - Self-Locking Nuts Performance - ;NASM25027 and MIL-N-25027/1; Acceptance - ;NASM25027 and MIL-N-25027/1; Attribute - Certificate of Completion Item - Self-Locking Nut Nonmetallic Insert Performance - ASTM-D4066, Group 01, Class 1 or 2, Grade 1 Attribute - Certificate of Compliance Item - Self-Locking Nuts Performance - This Certificate must state that self-locking nuts were manufactured by an approved source. Approved sources are those listed on QPL-25027 for the appropriate fastener. This QPL may also be considered as approved sources for Heavy Hex self-locking nuts. 3.3 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG/-0PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of thesmallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. 30 minutes / - 0 minutes. above 2500 PSIG, the pressure tolerance must be +2%/-0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be + 60 minutes/- 0 minutes. 3.4 ;Radiography is required for Discharge Cover, Piece 15 and Body, piece 43, on Drawing 255122; 3.5 Seat Stack Height Measurement - To ensure that each seat is within tolerance, check each seat singularly by measuring the seat height over the ball. This measurement is calculated by adding one-half ball diameter to the half stack height dimension on the drawing. Limits are determined by the ball diameter tolerance and the half stack height tolerance. Check dimensions by measuring from the seat back face to top of ball. Manufacturers of seats that do not have a ball of the required size available will be required to manufacture a dummy ball or segment of a ball with sufficient spherical surface to check the above dimension. 3.6 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.7 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;845-4456141 Rev A; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 3.8 Dupont Teflon Coating 850G-204 and 852G-201. Use of Dupont Teflon Coating 851N-204 and 852N-201 is acceptable until exhausted - Teflon coating of ball(s) must be in accordance with general note ;4.F.; of drawing ;803-4384678; . 3.9 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD099; in ECDS at https://register.nslc.navy.mil/ 3.9.1 CSD099 provides guidance for acceptance/rejection of teflon-coated valve balls after valve assembly production testing. 3.10 Ball Spherical Surface Waviness - Unless otherwise specified on drawing, all sealing area surfaces must have a spherical surface waviness which does not exceed 0.0005 inches of height per inch of spherical surface. Roughness and waviness ratings must apply in a direction which yields the maximum rating, normally perpendicular to the lay. 3.11 ;Surface waviness must be verified prior to Teflon Coating; 3.12 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.13 K-MONEL Fasteners - Material must be heat treated per QQ-N-286. 3.13.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the annealed and age hardened material and must meet the requirements of QQ-N-286. 3.13.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be cut or ground only. 3.14 K-MONEL Fasteners - K-MONEL externally threaded fasteners must have mechanical properties determined in accordance with MIL-DTL-1222. Test results must include Tensile, Yield, Elongation and Hardness as required by MIL-DTL-1222. (The Hardness tests must be performed on a full size fastener.) 3.14.1 Studs require an Axial Tensile test in accordance with MIL-DTL-1222. 3.14.2 Headed fasteners require a Wedge Tensile test as specified elsewhere in this contract/purchase order. 3.15 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.16 ;Seats are to be manufactured and must meet the drawing stack height requirements when mated with the refurbished ball. All non-metallic parts shall be newly manufactured; 3.17 ;Ball, Piece 1 on drawing 255122, outside diameter may be reworked to a minimum of than 5.113"" inches to be refurbish the Ball surface to meet drawing requirements and represents a relaxation below the drawing dimension. All other dimensions apply; 3.18 ;Ball, Piece 2 on drawing 255122 outside diameter may be reworked to a minimum of than 5.861"" inches to refurbish the Ball surface to meet drawing requirements and represents a relaxation below the drawing dimension. All other dimensions apply; 3.19 ;Defects in the Ball Stem Slot are acceptable if backlash between the Ball and Stem does not exceed 5 degrees and defects do not exceed 0.050"" in depth or cover more than 40% of the surface area; 3.20 ;Balls which require reworking beyond the limitation specified herein are to be disposition as noted elsewhere in the contract; 3.21 Thrust Washer Material - Thrust washer, ;piece 10 and piece 11; to be Nylatron GSVQ-II (Nylon 66 with molybdenum disulfide) in accordance with MIL-DTL-32286, as manufactured by Quadrant Engineering Plastic Products (EPP). 3.22 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.23 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.23.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.23.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.23.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.24 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 884245591; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type ""C"" on brass or Type ""H"" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.25 Stud Replacement - All MIL-DTL-1222 Type III (constant strength) studs with a Class 5 (interference) fit on the stud end must be replaced with Type IV(continuously threaded) studs with a Class 3 fit. Anaerobic adhesive in accordance with ASTM-D5363, adhesive AN0123 or AN0124 must be used on the setting endof these replacement Type IV studs. The mating body stud holes must also be tapped with a Class 3 fit in lieu of an interference fit. 3.26 Welding or Brazing - When welding, brazing, and allied processes are required, they must be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production welding and brazing. Repair welding is not permitted ;ASTM-B505 material; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.27 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.27.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.27.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.27.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or ClassII), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.28 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.29 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.30 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.30.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.31 See CDRL DI-MISC-80678 (Test Certi...
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/80c4e74125ae45158f322a28385867c1/view)
 
Record
SN06439171-F 20220826/220824230122 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.