Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 27, 2022 SAM #7575
MODIFICATION

Y -- 652-19-104 Expand Steam Distribution System (VA-22-00050503)

Notice Date
8/25/2022 10:45:45 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
246-NETWORK CONTRACTING OFFICE 6 (36C246) HAMPTON VA 23667 USA
 
ZIP Code
23667
 
Solicitation Number
36C24622R0063
 
Response Due
9/19/2022 11:00:00 AM
 
Archive Date
12/18/2022
 
Point of Contact
Vangie T Miller, Contract Specialist
 
E-Mail Address
Vangie.miller@va.gov
(Vangie.miller@va.gov)
 
Awardee
null
 
Description
H.H. McGuire V.A. Medical Center 1201 Broad Rock Blvd. Richmond, Virginia 23249 SCOPE OF WORK Project # 652-19-104 Expand Steam Distribution System -- Project Scope -- GENERAL: The contractor shall supply all labor, materials, and supervision necessary to perform the demolition/removal/installation of the systems designated within building 501 at Hunter Holmes McGuire Hospital main building 500 located at 1201 Broad Rock Blvd. Richmond, VA 23249 in accordance with the drawings and specifications. Work shall be conducted during normal business hours M-F 8am-4:30pm (no federal holidays). Special provisions should be made for after/outside normal business hour work specifically for operations producing noise, shutdowns or when work occurs that impacts critical areas of the medical center (examples include hospital systems connections (electrical/plumbing/etc.)), or as otherwise outlined in the bid documents. In these cases, the work shall be performed after business hours and shall be coordinated with medical center staff through the COR. Contractor shall incorporate and maintain all provisions of ICRA s and ILSM s. Work shall include, but is not limited to demolition, mechanical, control systems, plumbing, electrical, high/low voltage, and telecommunications. Bid Items: Item #1 - Base Bid: All work described on the Drawings and Specifications, which generally includes installation of new equipment and the demolition of existing VA equipment in such a manner as to minimize any full system outage durations. Period of Performance: 540 Days
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/7faca5c6696646ff84b47e818b20d194/view)
 
Record
SN06440369-F 20220827/220825230122 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.