SOLICITATION NOTICE
53 -- Special Mission Processor (SMP) Power Transfer Kits and Installs
- Notice Date
- 8/25/2022 8:59:47 AM
- Notice Type
- Solicitation
- NAICS
- 336411
— Aircraft Manufacturing
- Contracting Office
- FA8509 AFLCMC WIUKA ROBINS AFB GA 31098-1670 USA
- ZIP Code
- 31098-1670
- Solicitation Number
- FA850922R0023
- Response Due
- 9/9/2022 1:00:00 PM
- Archive Date
- 09/24/2022
- Point of Contact
- Macie Dyke, Phone: 4784721584, Tyler Nable
- E-Mail Address
-
macie.dyke@us.af.mil, tyler.nable@us.af.mil
(macie.dyke@us.af.mil, tyler.nable@us.af.mil)
- Description
- This is a fair opportunity selection conducted in accordance with (IAW) Federal Acquisition Regulation (FAR) Part 16.505(b)(1). Orders placed under FAR 16.505 IDIQ contracts are not source selections and are not subject to FAR 15.3 procedures. Accordingly, issuance of an order under this Fair Opportunity Proposal Request (FOPR), should an award be made, shall follow the ordering procedures outlined in FAR 16.505, as supplemented and as follows the stated ordering procedures within the Special Operations/personnel Recovery (SOF/PR) Multiple Award Contract for Modifications (MACM) Indefinite-Delivery Indefinite-Quantity (IDIQ) contract. This requirement will cover the procurement, assembly, and delivery of forty six (46) Special Mission Processor (SMP) Power Transfer kits and forty six (46) SMP Power Transfer installations on the AC/MC-J aircraft. In Accordance With (IAW) Time Compliance Technical Order (TCTO) and provided technical data package (build to print). Power Transfer kit part number 3370121 - top level drawing. There are very little risks with a build to print effort. This effort will include a one year basic contract with two (2) one year option periods. Contractor Installation of the 46 kits will be broke out in a three year period: One (1) Trial Install (TI) kit, one (1) trial kit installation, one (1) Kit Proof (KP) kit, one (1) Kit Proof installation, five (5) SMP Power Transfer production kits, and five (5) SMP Power Transfer kit installations in the base year, twenty (20) SMP Power Transfer production kits and twenty (20) SMP Power Transfer production kit installations in Option 1, and nineteen (19) SMP Power Transfer production kits and nineteen (19) SMP Power Transfer production kit installations in Option 2 - to meet the AC/MC-130J install schedule. The order will be awarded to one of the MACM Pool A Awardees listed below: FA850920D001 �DM Aero, LLC��� CAGE:� 6UBJ4 FA850920D002� KiHoMac, Inc.��� CAGE:� 3L2L3 FA850920D003 �iAccess Technologies, Inc.��� CAGE:� 3GVZ7����� FA850920D005� Radiance Technologies, Inc.�� CAGE:� 1H1J5 FA850920D007 �Scientific Research Corp.��� CAGE:��� 0D5A6 FA850920D008� SelectTech Services Corp.��� CAGE:� 7W030 � FA850920D009� Strata-G Solutions, Inc.��� CAGE:� 529L6� FA850920D010� Strategic Enterprise Solutions Corp.��� CAGE:� 4PUA5 FA850920D011� Support System Associates, Inc.��� CAGE:� 60877 � FA850920D012� T3Aerospace, LLC��� CAGE:� 893E2 FA850920D006 Science and Engineering Services CAGE: 4Q232 Please contact the primes listed above for individual subcontracting opportunities.� If you are not a Prime Contractor listed above, please DO NOT submit a proposal. A two week extension has been granted for this opportunity and an amended Fair Opportunity Proposal Request (FOPR Amendment 1) is attached to this posting. Proposals are due by 4:00 pm EST on Friday, 09 September 2022.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/d1e4d517b41d44d28dc513d31fca1b6f/view)
- Record
- SN06441455-F 20220827/220825230129 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |