SOLICITATION NOTICE
59 -- SMALL BUSINESS SET ASIDE - Socket Connector Assembly
- Notice Date
- 8/26/2022 11:24:02 AM
- Notice Type
- Solicitation
- NAICS
- 334417
— Electronic Connector Manufacturing
- Contracting Office
- NAVAL SURFACE WARFARE CENTER PANAMA CITY BEACH FL 32407-7001 USA
- ZIP Code
- 32407-7001
- Solicitation Number
- N61331-22-T-NS12
- Response Due
- 8/31/2022 12:00:00 PM
- Archive Date
- 09/15/2022
- Point of Contact
- Adrienne Brooks, Phone: 8508196328, Nicole Stevens, Phone: 8504812074
- E-Mail Address
-
adrienne.f.brooks.civ@us.navy.mil, nicole.stevens3.civ@us.navy.mil
(adrienne.f.brooks.civ@us.navy.mil, nicole.stevens3.civ@us.navy.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- AMENDMENT #3 ONE ADDITIONAL DRAWING UPLOADED AMENDMENT #2 TWO ADDITIONAL DRAWINGS UPLOADED AMENDMENT #1 CHANGES DRAWINGS FROM PUBLIC TO CONTROLLED Small Business Set Aside. Email quotes to adrienne.f.brooks.civ@us.navy.mil on or before the closing date and time of Wednesday 31 August 2022 2pm Central Time. The Government will not accept late quotes. Provide CAGE code and Lead time on your quote. Be able to invoice through Wide Area Workflow (WAWF). If shipping is not included in the price, please include a line item for shipping. The Government intends to award a firm fixed price purchase order using simplified acquisition procedures. Destination: Naval Base Kitsap-Keyport, Washington.� Please review all attachments. A description of the supplies or services required to meet the agency�s needs: Scope: This proposed contract is for procurement of Socket Connector Assembly, NAVSEA Drawing 2819417-3 Rev E, and NAVSEA Drawing 2823417-3 Rev D, Baseline with Drawing Reference, Sequential, and all associated drawings, changes, and specifications. The award shall be for a base year with one option year. Requirements: CLIN 0001 � Socket Connector Assembly First Article (Qty. 2) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2819417-3 Rev E, Baseline with Drawing Reference - Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU � End user inspection and acceptance. CLIN 0002 - Socket Connector Assembly Production (Qty. 48) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2819417-3 Rev E, Baseline with Drawing Reference - Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU � End user inspection and acceptance. CLIN 0003 � Socket Connector Assembly First Article (Qty. 2) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2823417-3 Rev D, Baseline with Drawing Reference � Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU � End user inspection and acceptance. CLIN 0004 � Socket Connector Assembly Production (Qty. 48) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2823417-3 Rev D, Baseline with Drawing Reference � Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU � End user inspection and acceptance. CLIN 0005 � Socket Connector Assembly Option 1 (Qty. 30) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2819417-3 Rev E, Baseline with Drawing Reference � Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU � End user inspection and acceptance. CLIN 0006 � Socket Connector Assembly Option 1 (Qty. 30) The contractor shall build Socket Connector Assembly in accordance with NAVSEA Drawing 2823417-3 Rev D, Baseline with Drawing Reference � Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU � End user inspection and acceptance.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/86ea6ac8bea847e4a4f7bddeed241635/view)
- Place of Performance
- Address: Keyport, WA, USA
- Country: USA
- Country: USA
- Record
- SN06443160-F 20220828/220826230125 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |