Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 10, 2022 SAM #7589
SOLICITATION NOTICE

Y -- Lolo National Forest Murphy Creek Accessible Trail Construction

Notice Date
9/8/2022 11:35:44 AM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Regional Office, R1 MISSOULA MT 59804 USA
 
ZIP Code
59804
 
Solicitation Number
1240LU22Q0034
 
Response Due
9/23/2022 11:00:00 AM
 
Point of Contact
Tina D Cook, Contracting Officer, Phone: 4065445807, Chris Tweed, Civil Engineer Tech, Phone: 406-822-3920
 
E-Mail Address
tinacook@fs.fed.us, christopher.tweed@usda.gov
(tinacook@fs.fed.us, christopher.tweed@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Pre-Solicitation Notice Description of Work:� This project consists of constructing 1808 feet of ADA compliant accessible trail in the Murphy Creek area west of Superior, MT, and along Road #69.� Work includes excavation, placement and compaction of aggregate base course gravel placement, and optional item of asphalt paving to standard specifications.� The width of the optional paved surface will be 6 feet, with a trail bed of compacted aggregate base course of 8 feet wide, to a depth of 6 inches (compacted) as shown on the drawings. The trail location traverses through a recently logged area and will require minimal clearing.� Excavation will require grubbing or grinding stumps along the route.� Sideslopes of tread construction are predominantly level to 10%, although one section approximately 300 feet long will require full bench construction to trailway width as shown on the drawings. Four picnic table pads (15� x 15�) will be constructed to the same depth and specifications as the trail tread.� Locations of the pads shall be staked by the engineer.� The contractor will be responsible for disposing of all waste material including stumps.� The Contractor shall furnish all the labor, equipment, supervision, transportation, supplies, and incidentals to perform work under this contract. PROJECT LOCATION Construction of Trail #736 begins at the parking area junction with Southside Road #69 and Road #7857, approximately 4 miles west of Superior, MT (See Vicinity Map).� Road #7857 is designated as permanently closed for vehicle traffic (�A� closure on the Lolo NF Travel Plan map). �MAGNITUDE OF CONSTRUCTION PROJECT Estimated Price Range:� $25,000 to $100,000 �SITE VISIT No site visit is planned.� Additional information can be obtained by contacting Mike Frawley at the Lolo National Forest, phone (406) 822-4233.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/0abf9b0fbd8b4e4f8e7e8f3adbaacd36/view)
 
Place of Performance
Address: Superior, MT 59872, USA
Zip Code: 59872
Country: USA
 
Record
SN06457518-F 20220910/220908230127 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.