SOLICITATION NOTICE
Y -- Construction of Thatcher Run PA-112 Conneautville Dam Rehabilitation, Crawford County, PA.
- Notice Date
- 9/9/2022 1:49:43 PM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- FPAC BUS CNTR-ACQ DIV WASHINGTON DC 20250 USA
- ZIP Code
- 20250
- Solicitation Number
- 12FPC322B0012
- Response Due
- 6/23/2022 11:00:00 AM
- Archive Date
- 09/30/2022
- Point of Contact
- Stephen Case, Phone: 9198732121
- E-Mail Address
-
stephen.case@usda.gov
(stephen.case@usda.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- Amendment 002 The purpose of this solicitation amendment 0002 is to post the questions and answers (Amendment 0002 - PA-112 Site Showing Statements Questions) document and to post the revised construction specifications (Amendment 0002 - PA-112 Revised Construction Specifications) document.� This concludes the questions and answers.�� Note: The bid due date was changed on amendment 0001 to 6/23/2022 at 14:00 EST. _________________________________________________________________________ Amendment 001 The purpose of this solicitation amendment is to allow an additional week to address the questions and answers which will be posted as a separate document on 6/14 or 6/15. The due date for the bids is changed from 6/16/2022 at 14:00 EST to 6/23/2022 at 14:00 EST. ___________________________________________________________________________ The Conneautville Dam is in the Borough of Conneautville, Crawford County, Pennsylvania.� Conneautville Dam is owned and operated by the Borough of Conneautville. The objectives of the project are to implement the established design for rehabilitation to rehabilitate the dam to meet or exceed state and federal dam safety criteria, and to maintain the current level of flood protection provided by Conneautville Dam.� � The rehabilitation construction requires realignment of auxiliary spillway channel and expansion of the training dike; installation of a sheetpile wall along the left side of the auxiliary spillway; lime treatment of surficial dispersive soils on the embankment, auxiliary spillway, and training dike; reconfiguration of the 8-inch diameter embankment drain pipes in the vicinity of the principal spillway impact basin; construction of a filter diaphragm below the existing principal spillway outlet conduit; and replacement of the existing trash rack installed on the inlet structure.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/e9574598860d4987b4c2df9b70728d42/view)
- Place of Performance
- Address: Conneautville, PA, USA
- Country: USA
- Country: USA
- Record
- SN06459325-F 20220911/220909230129 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |