Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 11, 2022 SAM #7590
SOLICITATION NOTICE

Y -- Des Moines River Basin, Saylorville Lake, Polk County, IA, Bob Shetler, Cherry Glen and Prairie Flower, Water and Sewer Repairs

Notice Date
9/9/2022 12:42:41 PM
 
Notice Type
Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
W07V ENDIST ROCK ISLAND ROCK ISLAND IL 61299-5001 USA
 
ZIP Code
61299-5001
 
Solicitation Number
W912EK22B0011
 
Response Due
9/7/2022 8:00:00 AM
 
Archive Date
09/22/2022
 
Point of Contact
Bradley Grothus, Phone: 3097945021, Nicholas Moore, Phone: 3097945250
 
E-Mail Address
bradley.j.grothus@usace.army.mil, Nicholas.M.Moore@usace.army.mil
(bradley.j.grothus@usace.army.mil, Nicholas.M.Moore@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The purpose of amendment 0003 is to extend the bid due date to 07 September 2022, update the bid due time to 10:00 AM and revise Spec Section 33 05 23 and a Drawing. _____________________________________________________________________________ The purpose of amendment 0002 is to revise the Contract Duration, CLINs, Schedule of Prices, FAR Clauses: 5152.211-9000, 52.211-10 and 5152.211-9001, Spec Sections: 00 73 05, 01 20 00, 01 33 00 Submittal Register, 33 05 23 and Drawings/Plan Set. _____________________________________________________________________________ The purpose of amendment 0001 is to establish a formal site visit on 16 August 2022, extend the bidder inquiry date to 19 August 2022 and extend the proposal due date to 02 September 2022. _____________________________________________________________________________ Base�Bid � Bob Shetler Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Directional Drilling, Trenching, Gate Valve Installation, Fire Hydrants, Water Meter Vault, Sanitary Sewer Piping, Sanitary Sewer Manhole, Sanitary Sewer Duplex Lift Station, Concrete Work, Asphalt Work, Granular Surfacing, Flowable Fill and Site Restoration. Option A � Cherry Glen Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Water Meter Vault, Sanitary Sewer Lining, Sanitary Sewer, Sanitary Sewer Manhole Rehab, Lagoon Sludge Removal, Lagoon Piping & Manholes, Lagoon Earthwork, Lagoon Slope Protection Stone, Trail Pavement Replacement and Site Restoration. Option B � Prairie Flower Campground includes Mobilization and Demobilization, Demolition, Direction Drilling, Gate Valves, Fire Hydrants, Water Meter Vaults, Sanitary Sewer, Sanitary Sewer Manhole Repair, Sanitary Sewer Duplex Lift Station and Site Restoration.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/3b307262810e4749aba47d0def0f78c0/view)
 
Place of Performance
Address: Johnston, IA 50131, USA
Zip Code: 50131
Country: USA
 
Record
SN06459339-F 20220911/220909230129 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.