SOLICITATION NOTICE

43 -- 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF

Notice Date
9/9/2022 1:09:07 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
 
ZIP Code
17050-0788
 
Solicitation Number
N0010422QZC34
 
Response Due
9/13/2022 10:00:00 PM
 
Archive Date
09/29/2022
 
Point of Contact
Telephone: 7176052982
 
E-Mail Address
BRITTANY.A.LANGLETZ@NAVY.MIL
(BRITTANY.A.LANGLETZ@NAVY.MIL)
 
Description
CONTACT INFORMATION|4|N742.8|WR5DD|717-605-2982|brittany.a.langletz.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001AA|One (1)|600|||||||||||||||||| REPAIR DELIVERY (FIRM FIXED PRICE)|1|600| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoice Combo |Material - Inspect & Accept at Source |To Be Determined (TBD)|N00104|TBD|TBD|N60138|TBD|N/A|N/A|N/A|Certifications - N4 5404 |N/A|N/A|See form DD1423|1-866-618-5988 - WAWF Helpdesk| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| PROGRESS PAYMENTS (NOV 2021)(DEVIATION 2020-O0010)|4||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|333914|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This is an Advanced Equipment Repair Program (AERP) requirement. 2. This solicitation is for the repair of one (1) 7HH 4320 013053619 A3, PUMP UNIT, CENTRIFUG. 3. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either depositedinthe mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. 4. Any contract awarded as a result of this solicitation will be DO certifiedfor national defense use under the Defense Priorities and Allocations System(DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense,Emergency Preparedness, and Energy Program Use, shall be inserted insolicitations when the contract to be awarded will be a rated order. 5.This requirement is pursuant to the Emergency Acquisition Flexibilities (EAF)). 6. Include repair price with all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, missing parts, wear damage, and CAV reporting. 7. Repair Turnaround Time (RTAT): The resultant contractual delivery requirement is measured from asset Return tothe date of asset acceptance under the terms of the contract. For purposes ofthis section, Return is identified as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commerical Asset Visibility (CAV) system.In accordance with the CAV statement of work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the action date entered in CAV must be dated to reflect the actual date of physical receipt. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established within this contract. Requested RTAT: 600 days Proposal shall reference the proposed RTAT and any capacity restraints. All transportation to/from repair site will be paid for by US Navy. Also, please provide: Teardown and Evaluation Rate: ________ RTAT: ____________________ Throughput Constraint: ________________ Induction Expiration Date: ______________ 8. Price Reduction: Any assets for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via aReconciliation Modification at the end of contract performance. Pricereductions made pursuant to this section shall not limit other remediesavailable to the Government for failure to meet required RTATs, including butnot limited to the Government's right to terminate for default. Offerors must have a valid U.S. security clearance of CONFIDENTIAL orhigher in order to respond to this RFQ N00104-22-Q-ZC34, becausesolicitation N00104-22-Q-ZC34 includes and annex (information) classified atthe CONFIDENTIAL level which will be released only to the offerors possessingthe appropriate clearance. All classified material must be handled inaccordancewith the National Industrial Security Program Operating Manual(NISPOM) (DoD5220-22-M)and Industrial Security Regulation (DoD 5220.22-R). 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the PUMP UNIT,CENTRIFUG . ;""A"" Condition Pump NIIN 01-602-1668 and ""A"" Condition Motor 01-306-7675 will be provided to the vendor as Government Furnished Material.; ;""A"" Condition Pump NIIN 01-602-1668 and ""A"" Condition Motor 01-306-7675 will be provided to the vendor as Government Furnished Material.; 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;998F3430 63857 E D; 2.1.2 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;Warren Drawing 51-A-28725, NAVSEA S6225-DU-MMO-010 and NAVSEA Drawing SSN688-845-4456141 CONFIDENTIAL; DRAWING DATA=ADDITIONAL |03950| -| |D|0001 | -|49998|0008916 DRAWING DATA=4456141 |80064| A| |X|0001 | A|00026|0000000 3. REQUIREMENTS 3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;63857; , drawing ;998F3430; ,and the applicable SUBMEPP Repair Instruction ;5080-012-0651 Rev D Ch-2 (CSD283); , except as amplified or modified herein. 3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction. 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD283; in ECDS at https://register.nslc.navy.mil/ 3.3 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;845-4456141 Rev A; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. 5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/1d8186c9e8394ae38bd672eb6c702e24/view)
 
Record
SN06459554-F 20220911/220909230130 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.