Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 14, 2022 SAM #7593
SOLICITATION NOTICE

Y -- TX FTNP LAMR10(3) ALFL106(1) LAMR & ALFL REHAB OF ROADS & PARKING

Notice Date
9/12/2022 1:15:16 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22B000036
 
Archive Date
10/12/2022
 
Point of Contact
Ryan Phillips
 
E-Mail Address
cflacquisitions@dot.gov
(cflacquisitions@dot.gov)
 
Description
PROJECT DESCRIPTION:� The TX FTNP LAMR10(3) ALFL106(1), LAMR & ALFL Rehab of Roads & Parking project is located at Lake Meredith National Park and Alibates Flint Quarries in northern Texas. The purpose of the project is to rehabilitate 6 sections of road, reconstruct and pave 1 road, and rehabilitate 3 parking lots. The existing pavement is at the end of its design life and is in need of rehabilitation to improve the safety/access of the recreational areas, enhancing user�s recreational experience and preserve natural resources. This project has been broken up into a base Schedule with 9 Options: Schedule A � Sanford Yake Road, Option R � Fritch Fortress Road, Option S � Blue West Road, Option T � Harbor Bay Road, Option U � Bates Canyon Road, Option V � Alibates Road (reconstruction), Option W � Alibates Auto Tour Road, Option X � Sanford Yake Parking, Option Y � Harbor Bay Parking A, and Option Z � Harbor Bay Parking B. SCOPE OF THE WORK:� This project is approximately 8 total miles of roadway rehabilitation (approx. 7.75 miles of roadway and 3 parking lots) and reconstruction (approx. 0.25 miles). There are no grade, cross slope, or superelevation corrections for this project. Other items of work include guardrail replacement, minor drainage improvements, and signing and striping. There are no right of way or utility impacts anticipated for this project. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation, Method 2, 6-Inch Depth: 140,000 SQYD 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 32,000 TON The estimated cost for this project is between $10,000,000 and $20,000,000. This will be solicted as full and open competition.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/cd3ddab5a0104d8ebcb438294a9e7ea1/view)
 
Place of Performance
Address: TX, USA
Country: USA
 
Record
SN06461349-F 20220914/220912230122 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.