Y -- 632-23-118 Replace Domestic Water Heaters-Bldg 92

Notice Date
9/27/2022 3:38:44 AM
 
Notice Type
Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24222Q1126
 
Response Due
10/14/2022 9:00:00 AM
 
Archive Date
12/15/2022
 
Point of Contact
Michael Giaquinto, Contract Specialist
 
E-Mail Address
michael.giaquinto2@va.gov
(michael.giaquinto2@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
Amendment 2 to solicitation�36C24222Q1126 project�632-23-118 Replace Domestic Water Heaters-Bldg 92� at the Northport VAMC. This amendment addresses questions and revises the scope of work A site visit is scheduled for September 30th at 9am meeting at Building 92 main lobby at the Northport VAMC. Questions and quotes should be submitted to michael.giaquinto2@va.gov The magnitude of construction is�Between $100,000 and $250,000. The period of performance is 90 days please utilize the following SCOPE OF WORK which is correct PROJECT NO. 632-23-118 DOMESTIC WATER HEATERS REPLACEMENT BUILDING 92 Building 92 is a Geriatrics and Extended Care facility at The Veterans Administration Medical Center located at 70 Middleville Road, Northport, NY, 11768. The buildings domestic hot water has been an ongoing issue with only marginal adequacy for facility operation as the existing domestic water heaters are failing. The two existing domestic water heaters serving Building 92 are approximately 35 years old and are beyond their normal life expectancy. Evidence of leakage of domestic water into the steam coil bundles for the existing water heaters was identified. On 5/18/2022 a test was made of the domestic water heaters at building 92 and it was confirmed that the steam tube bundle was leaking and domestic water was backing up into the tubes. Replacement of the existing water heaters, in their entirety, is required. The C&A requirements do not apply and that a Security Accreditation Package is not required. SCOPE OF WORK Demolish two existing domestic water heaters and domestic hot water return pump. Install two new domestic water heater and new domestic hot water return pump Phase-1: Install new domestic hot water return pump, on existing adjacent pump pad, install new domestic hot water return piping, making ready for tie in to domestic hot water return system under a later phase. coordinate with electrical shop to prepare pump for connection to existing power Phase-2: Disconnect and remove existing domestic hot water return pump P-DHWR. tie in new domestic hot water return piping to existing system and new pump. Coordinate with electrical shop to connect power from existing pump to new pump Phase-3: Demolish abandoned domestic hot water return piping following connection of new piping to existing system. Demolish Kindorf, etc. in front of existing domestic water heater XDWH-1. Make ready for installation of new domestic water heater DWH-1 under next phase. Phase-4: Maintain domestic water heater XDWH-2 in operation. isolate XDWH-1 including valve off low pressure steam, condensate return, domestic cold water, domestic hot water, etc. piping to domestic water heater XDWH-1. Demolish existing domestic water heater XDWH-1 in its entirety including controls, control valve, steam traps, steam piping, domestic hot water piping, steam condensate. Make area and Domestic Water Heaters Replacement Building 92 632-24-119 existing piping ready for installation of new domestic water heater DWH-1 under next phase. Phase-5: Install new domestic water heater DWH-1 in strict accordance with manufacturer's printed instructions and recommendations including new controls, control valve, steam traps, steam piping, domestic hot water piping, steam condensate piping. tie into respective systems. Test new water heater DWH-1. Phase-6: Place new water heater DWH-1 in operation. Phase-7: Maintain domestic water heater XWH-1 in operation. Isolate XDWH-2 including valve off low pressure steam, condensate return, domestic cold water, domestic hot water, etc. piping to domestic water heater XDWH-2. Demolish existing domestic water heater XDWH-2 in its entirety including controls, control valve, steam traps, steam piping, domestic hot water piping, steam condensate. Make area and existing piping ready for installation of new domestic water heater DWH-2 under next phase. Phase-8: Install new domestic water heater DWH-2 in strict accordance with manufacturer's printed instructions and recommendations including new controls, control valve, steam traps, steam piping, domestic hot water piping, steam condensate piping. tie into respective systems. Test new water heater DWH-2. Phase-9: Place new water heater DWH-2 in operation. Phase-10: Clean up and dispose all existing water heaters, existing pump, abandoned piping and equipment in MER END�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/18a788dfd85e494fa6c743f6627f06d4/view)
 
Place of Performance
Address: Northport, NY 11768, USA
Zip Code: 11768
Country: USA
 
Record
SN06479995-F 20220929/220927230120 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.