Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 07, 2022 SAM #7616
SOLICITATION NOTICE

J -- Stager Controllers for well-water filtration systems

Notice Date
10/5/2022 3:15:37 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
W07V ENDIST ST PAUL SAINT PAUL MN 55101-1323 USA
 
ZIP Code
55101-1323
 
Solicitation Number
W912ES22Q0103
 
Response Due
10/18/2022 1:00:00 PM
 
Archive Date
11/02/2022
 
Point of Contact
Jesse Onkka, Phone: 6512905444, Gwendolyn Davis, Phone: 6512905725
 
E-Mail Address
Jesse.l.onkka@usace.army.mil, gwendolyn.k.davis@usace.army.mil
(Jesse.l.onkka@usace.army.mil, gwendolyn.k.davis@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The Contractor shall provide five (5) custom Stager Controllers for the well-water filtration systems that are installed at the following Locks and Dams; LD2 (Hastings, MN), LD5 (Minnesota City, MN), LD5A (Fountain City, WI), LD7 (La Crescent, MN), LD9 (Eastman, WI).� These systems were originally designed, built and installed by Robert Hill Company in St Louis Park, MN. Stager Controller Complete Stager Module UL (or nationally accredited test lab) listed components. 12-month parts and labor warranty Programs start, stop and cycle time of backflush cycle for well water filtration system. Capable of controlling pump and up to four greensand tanks. Measures and displays flow which can be used to determine that system is working effectively. Water flow ranges between 0-100 GPM (gallons per minute).� Typical service flow rate is 75 GPM (@ 3.5 fps). Backwash Cycle: First Stage: 8 GPM/Sq Ft Main Wash: 15 GPM/Sq Ft Maximum Backwash Rate: 18 GPM/Sq Ft Backwash Flow Rate: 75 GPM First Stage Flow Rate: 40 GPM First Stage Duration: 2 minutes Total Backwash Duration: 10 minutes Quantity of Five (5) units at locations listed.� Installation and Training Includes turnkey installation, integration, programming and training Includes Operator and Maintenance (O&M) Manual complete with schematics, recommended spare parts, part numbers.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/85df701429fe42258f552a8a4afaf8b1/view)
 
Record
SN06487087-F 20221007/221005230110 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.