SPECIAL NOTICE
70 -- Unified Voice Mangement System (UVMS) Support Services
- Notice Date
- 10/6/2022 12:23:48 PM
- Notice Type
- Special Notice
- NAICS
- 54151
—
- Contracting Office
- W6QK ACC-APG ABERDEEN PROVING GROU MD 21005-1846 USA
- ZIP Code
- 21005-1846
- Response Due
- 11/2/2022 1:30:00 PM
- Point of Contact
- Kenneth Faulcon, Shannon McBride, Phone: 4438615067
- E-Mail Address
-
Kenneth.faulcon2.civ@army.mil, shannon.m.mcbride6.civ@army.mil
(Kenneth.faulcon2.civ@army.mil, shannon.m.mcbride6.civ@army.mil)
- Description
- Subject: Unified Voice Management System (UVMS) Synopsis Ref#: W15P7T-23-R-0003- Unified Voice Management System (UVMS) Synopsis Posted Date: October 5th, 2022 Response Date: �November 2nd, 2022 PSC: 7D20 IT and TELECOM Services Delivery NAICS Code: 54151 � Computer System Design and Related Services�� Set Asides: There are no appropriate set-asides for this effort. Contracting Office Address: Army Contracting Command - Aberdeen Proving Ground 6565 SURVEILANCE LOOP ABERDEEN PROVING GROUND, MD 21005-1846, USA. Proposed Solicitation Number: W15P7T-23-R-0003 Contract Award and Solicitation Number: �January 2023 Estimated Contract Award Dollar Amount: $ 4.6 Million Contractor: SCI Technologies, Inc. Places of Contract Performance: Aberdeen Proving Ground, MD Fort Worth, TX Joint Base Lewis-McChord, WA Fort Bliss, TX Fort Polk, LA Fort Irwin, CA Fort Drum, NY Fort Wainwright, AK Schofield, HI POCs: Contract Specialist (KS) �Kenneth Faulcon, Kenneth.Faulcon2.civ@army.mil and Contracting Officer (KO)� Shannon Mcbride Shannon.M.Mcbride6.civ@army.mil. Description:� Program Executive Office, Command, Control and Communications Tactical (PEO C3T)� Project Manager Interoperability, Integration and Services (PM I2S)� The Program Executive Office, Command, Control, Communications-Tactical (PEO C3T) on behalf of Headquarters, Department of the Army is seeking eligible business capable of performing Engineering and Business Support services for Product Manager Command Post Integrated Infrastructure (PdM CPI2) at various CONUS locations. As part of the Command Post Integrated Infrastructure (CPI2) Capability Development Document (CDD) dated April 9, 2020 required CPI2 to integrate the Army solution; Unified Voice Management Systems (UVMS) into the Command Post Support Vehicle for use within the Mission Command Platforms (MCPs) at Corps, Division, and Brigade Combat Teams (BCTs). The UVMS will be capable of access to WIN-T Voice-Over-Internet Protocol (VOIP) for telephone, voice radio, and software-based voice collaboration from operator positions and will be capable of wave form and radio cross banding. Additionally, it will be able to enable voice and data communications exchanges between all Army standard network and radio protocols within and between MCPs. DISCLAIMER� �THIS SYNOPSIS IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A �REQUEST FOR PROPOSAL (RFP)� TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. RESPONSES WILL NOT BE RETURNED TO THE RESPONDER. NOT RESPONDING TO THIS NOTICE DOES NOT PRECLUDE PARTICIPATION IN ANY FUTURE REQUEST FOR QUOTE (RFQ) OR INVITATION FOR BID (IFB) OR RFP, IF ANY ISSUED. IF A SOLICITATION IS RELEASED, IT WILL BE SYNOPSIZED ON THE GOVERNMENT-WIDE POINT OF ENTRY (GPE). IT IS THE RESPONSIBILITY OF POTENTIAL OFFERORS TO MONITOR THE GPE FOR ADDITIONAL INFORMMATION PERTAINING TO THIS REQUIREMENT.�� The Period of Performance (PoP) for this IDIQ contract shall be 60 months; 12-month base and four (4) 12-month option periods. Each task order shall have an independent PoP based upon the need under that TO. Any orders issued during the ordering period of the contract shall be completed and delivered with the PoP/delivery date stated with each TO. All data received in response to this Synopsis that is marked or designated as corporate or proprietary will be fully protected from any release outside the Government.� Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. All questions must be submitted to the POCs identified above. The Government is not committed nor obligated to pay for the information provided, and no basis for claims against the Government shall arise because of a response to this Synopsis. All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency.��
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/553fc705841643358d7420ec8168a411/view)
- Place of Performance
- Address: Aberdeen Proving Ground, MD, USA
- Country: USA
- Country: USA
- Record
- SN06488373-F 20221008/221006230057 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |