Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 08, 2022 SAM #7617
SOLICITATION NOTICE

Y -- CA FTNP MOJA 12(1) CIMA ROAD

Notice Date
10/6/2022 1:47:44 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22B000019
 
Response Due
11/10/2022 1:00:00 PM
 
Archive Date
12/10/2022
 
Point of Contact
Leslie Karsten, Ryan Phillips
 
E-Mail Address
CFLAcquisitions@dot.gov, cflacquisitions@dot.gov
(CFLAcquisitions@dot.gov, cflacquisitions@dot.gov)
 
Description
CA FTNP MOJA 12(1) CIMA ROAD The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 17.1 miles of Cima Road in San Bernardino County, California.� The project also includes installation of low water crossings/shoulder stabilization areas along Cima Road with spot locations on Kelbaker Road, Lanfair Road, and Cedar Canyon Road.� The project is located in a remote area approximately 75 miles from Las Vegas, NV, the closest major metropolitan area. The Cima Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment in select areas, reinforcing low water crossings, and improving safety with longitudinal and transverse rumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with rip rap revetment. The Kelbaker Road improvements consist of a rip rap shoulder stabilization area and four shoulder asphalt patching locations.� Lanfair and Cedar Canyon Roads consist of two low water crossings and a roadway slope stabilization area. �Construction duration is estimated at 12-18 months. The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/dde5b9dc87b54408b851df9d7c670104/view)
 
Place of Performance
Address: Baker, CA, USA
Country: USA
 
Record
SN06488542-F 20221008/221006230058 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.