SOLICITATION NOTICE
53 -- SCREW,CAP,CYL HD HX
- Notice Date
- 10/18/2022 3:28:09 PM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
- ZIP Code
- 17050-0788
- Solicitation Number
- N0010420QFA39
- Response Due
- 4/3/2020 1:30:00 PM
- Archive Date
- 04/18/2020
- Point of Contact
- Telephone: 7176058399
- E-Mail Address
-
TIANA.HAMMAKER@NAVY.MIL
(TIANA.HAMMAKER@NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N743.35|WWF|717-605-8399|TIANA.HAMMAKER@NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C AND SECION E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION (JUN 2002)|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|N50286|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (JAN 2019)(DEVIATION 2019-O0003)|2||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JUN 2019)|11|||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS CERTIFICATE (NOV 2014)|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2018)|12|332722|500||||||||||| REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCESERVICES OR EQUIPMENT (AUG 2019))|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| DUE TO ISSUES WITH DRAWINGS BEING POSTED; THIS SOLICIATION IS EXTENDED TO APRIL 3, 2020. DUE TO THE ISSUES ASSOICATED WITH THE NANSUP'S TRANSITION TO BETASAM; THIS SOLICIATION HAS BEEN EXTENDED TO ALLOW TIME FOR ADDITIONAL OFFERS. 1. DD1423 DATA ITEM A001 MAY BE WAIVED IF ALREADY ON FILE AT NAVSUP-WSSMECHANICSBURG. 2. DRAWINGS CAN BE ACCESSED THRU: WWW.NECO.NAVY.MIL 3.SUBMISSION OF ALL CERTIFICATION DD1423 DATA CDRLs WILL BE ON OR BEFORE 20DAYS PRIOR TO DELIVERY PNSY REVIEW/ACCEPTANCE OF CERTIFICATION CDRLs 6 WORKING DAYS AFTER RECEIPT OFCERTIFICATION DD1423 DATA CDRLs FINAL DELIVERY OF MATERIAL WILL BE ON OR BEFORE 186 DAYS AFTER EFFECTIVE DATEOF CONTRACT. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;B; applies to this material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.3 Specification Revisions - The specification revisions listed under ""Docu ments References"" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DRAWING DATA=7627451 |53711| C| |D|0001 | A|49998|0013532 DRAWING DATA=7627451 |53711| C| |D|0002 | A|49998|0004869 DRAWING DATA=7627451 |53711| C| |D|0003 | A|49998|0012982 DRAWING DATA=7627451 |53711| C| |D|0003.A | A|49998|0011000 DRAWING DATA=7627451 |53711| C| |D|0004 | A|49998|0009370 DRAWING DATA=7627451 |53711| C| |D|0005 | -|49998|0007828 DRAWING DATA=7627451 |53711| C| |D|0005.A | A|49998|0009007 DRAWING DATA=7627451 |53711| C| |D|0005.B | A|49998|0004748 DRAWING DATA=7627451 |53711| C| |D|0006 | -|49998|0007222 DRAWING DATA=7627451 |53711| C| |D|0006.A | -|49998|0007233 DRAWING DATA=7627451 |53711| C| |D|0006.B | A|49998|0006847 DRAWING DATA=7627451 |53711| C| |D|0006.C | A|49998|0006763 DRAWING DATA=7627451 |53711| C| |D|0006.D | A|49998|0007615 DRAWING DATA=7627451 |53711| C| |D|0006.E | A|49998|0008924 DRAWING DATA=7627451 |53711| C| |D|0006.F | A|49998|0008588 DRAWING DATA=7627451 |53711| C| |D|0006.G | A|49998|0004572 DRAWING DATA=7627451 |53711| C| |D|0007 | A|49998|0009829 DRAWING DATA=7627451 |53711| C| |D|0007.A | A|49998|0009509 DRAWING DATA=7627451 |53711| C| |D|0007.B | A|49998|0009358 DRAWING DATA=7627451 |53711| C| |D|0007.C | A|49998|0005521 DRAWING DATA=7627451 |53711| C| |D|0008 | A|49998|0009303 DRAWING DATA=7627451 |53711| C| |D|0008.A | A|49998|0007961 DRAWING DATA=7627451 |53711| C| |D|0008.B | A|49998|0007108 DRAWING DATA=7627451 |53711| C| |D|0009 | A|49998|0008821 DRAWING DATA=7627451 |53711| C| |D|0009.A | A|49998|0006971 DRAWING DATA=7627451 |53711| C| |D|0009.B | A|49998|0007794 DRAWING DATA=7627451 |53711| C| |D|0010 | -|49998|0007203 DRAWING DATA=7627451 |53711| C| |D|0010.A | -|49998|0007596 DRAWING DATA=7627451 |53711| C| |D|0011 | -|49998|0044558 DRAWING DATA=7627451 |53711| C| |D|0012 | -|49998|0044700 DRAWING DATA=7627451 |53711| C| |D|0013 | -|49998|0008350 DRAWING DATA=7627451 |53711| C| |D|0014 | -|49998|0011620 DRAWING DATA=7627451 |53711| C| |D|0015 | -|49998|0018990 DRAWING DATA=7627451 |53711| C| |D|0016 | -|49998|0020055 DRAWING DATA=7627451 |53711| C| |D|0017 | -|49998|0007951 DRAWING DATA=7627451 |53711| C| |D|0018 | A|49998|0006571 DRAWING DATA=7627451 |53711| C| |D|0019 | -|49998|0012852 DRAWING DATA=7627451 |53711| C| |D|0020 | A|49998|0012765 DRAWING DATA=7627451 |53711| C| |D|0021 | A|49998|0007232 DRAWING DATA=7627451 |53711| C| |D|0022 | A|49998|0013085 DRAWING DATA=7627451 |53711| C| |D|0023 | -|49998|0012587 DRAWING DATA=7627451 |53711| C| |D|0024 | A|49998|0013738 DRAWING DATA=7627451 |53711| C| |D|0025 | A|49998|0013735 DRAWING DATA=7627451 |53711| C| |D|0026 | A|49998|0023086 DRAWING DATA=7627451 |53711| C| |D|0027 | A|49998|0018416 DRAWING DATA=7627451 |53711| C| |D|0028 | A|49998|0016044 DRAWING DATA=7627451 |53711| C| |D|0029 | A|49998|0044419 DRAWING DATA=7627451 |53711| C| |D|0030 | A|49998|0044342 DRAWING DATA=7627451 |53711| C| |D|0031 | -|49998|0020845 DRAWING DATA=7627451 |53711| C| |D|0032 | -|49998|0019715 DRAWING DATA=7627451 |53711| C| |D|0033 | A|49998|0035929 DRAWING DATA=7627451 |53711| C| |D|0034 | A|49998|0021665 DRAWING DATA=7627451 |53711| C| |D|0035 | A|49998|0012736 DRAWING DATA=7627451 |53711| C| |D|0036 | A|49998|0012247 DRAWING DATA=7627451 |53711| C| |D|0037 | -|49998|0031423 DRAWING DATA=7627451 |53711| C| |D|0038 | -|49998|0031009 DRAWING DATA=7627451 |53711| C| |D|0039 | -|49998|0053754 DRAWING DATA=7627451 |53711| C| |D|0040 | A|49998|0034546 DRAWING DATA=7627451 |53711| C| |D|0041 | A|49998|0027405 DRAWING DATA=7627451 |53711| C| |D|0042 | A|49998|0021604 DRAWING DATA=7627451 |53711| C| |D|0043 | A|49998|0022064 DRAWING DATA=7627451 |53711| C| |D|0044 | A|49998|0032517 DRAWING DATA=7627451 |53711| C| |D|0045 | A|49998|0026566 DRAWING DATA=7627451 |53711| C| |D|0046 | A|49998|0020253 DRAWING DATA=7627451 |53711| C| |D|0047 | A|49998|0021966 DRAWING DATA=7627451 |53711| C| |D|0048 | -|49998|0015885 DRAWING DATA=7627451 |53711| C| |D|0049 | -|49998|0016559 DRAWING DATA=7627451 |53711| C| |D|0050 | -|49998|0006518 DRAWING DATA=7627451 |53711| C| |D|0051 | -|49998|0006128 DRAWING DATA=7627451 |53711| C| |D|0052 | -|49998|0006150 DRAWING DATA=7627451 |53711| C| |D|0053 | -|49998|0006206 DRAWING DATA=7627451 |53711| C| |D|0054 | -|49998|0006235 DRAWING DATA=7627451 |53711| C| |D|0055 | -|49998|0006269 DRAWING DATA=7627451 |53711| C| |D|0056 | -|49998|0006228 DRAWING DATA=7627451 |53711| C| |D|0057 | -|49998|0006224 DRAWING DATA=7627451 |53711| C| |D|0058 | -|49998|0006356 DRAWING DATA=7627451 |53711| C| |D|0059 | -|49998|0016999 DRAWING DATA=7627451 |53711| C| |D|0060 | -|49998|0027125 DRAWING DATA=7627451 |53711| C| |D|0061 | -|49998|0047526 DRAWING DATA=7627451 |53711| C| |D|0062 | A|49998|0059517 DRAWING DATA=7627451 |53711| C| |D|0063 | -|49998|0050172 DRAWING DATA=7627451 |53711| C| |D|0064 | -|49998|0052530 DRAWING DATA=7627451 |53711| C| |D|0065 | -|49998|0011562 DRAWING DATA=7627451 |53711| C| |D|0066 | A|49998|0019192 DRAWING DATA=7627451 |53711| C| |D|0067 | -|49998|0015360 DRAWING DATA=7627451 |53711| C| |D|0068 | -|49998|0015938 DRAWING DATA=7627451 |53711| C| |D|0069 | -|49998|0011063 DRAWING DATA=7627451 |53711| C| |D|0070 | -|49998|0010510 DRAWING DATA=7627451 |53711| C| |D|0071 | -|49998|0009331 DRAWING DATA=7627451 |53711| C| |D|0072 | -|49998|0007960 DRAWING DATA=7627451 |53711| C| |D|0073 | -|49998|0009109 DRAWING DATA=7627451 |53711| C| |D|0074 | -|49998|0009976 DRAWING DATA=7627451 |53711| C| |D|0075 | -|49998|0009005 DRAWING DATA=7627451 |53711| C| |D|0076 | A|49998|0020493 DRAWING DATA=7627451 |53711| C| |D|0077 | A|49998|0035675 DRAWING DATA=7627451 |53711| C| |D|0078 | A|49998|0016753 DRAWING DATA=7627451 |53711| C| |D|0079 | A|49998|0019363 DRAWING DATA=7627451 |53711| C| |D|0080 | A|49998|0021607 DRAWING DATA=7627451 |53711| C| |D|0081 | A|49998|0027901 DRAWING DATA=7627451 |53711| C| |D|0082 | A|49998|0037399 DOCUMENT REF DATA=FF-S-86 | | |E |910116|A| 4| | DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | 3. REQUIREMENTS 3.1 ;The Screw, Cap, Cyl Head, must be in accordance with FF-S-86, Type VI, QQ-N-281, .250""-20UNC-2A X2.50"" long, except as amplified or modified herein.; 3.2 Wedge Tensile Test Specimens (Headed fasteners) - A wedge tensile test shall be conducted on a Full Size Fastener for each production lot. The required specimens for the Wedge Tensile Test shall be separate fasteners from those required for the Yield Test. 3.2.1 Testing for Socket Head Cap Screws shall be in accordance MIL-DTL-1222, paragraphs 4.5.2.3 and 4.5.2.3.1. 3.2.2 Testing for all other Headed Fasteners with a nominal diameter greater than 1/4-inch shall be in accordance with ASTM-F606 for grades 5, 8, B7, and B16.For all other grades, the following wedge angles shall be used. a. Except as specified in item c below, fasteners with a nominal diameter of 1/4-inch through 1-inch (inclusive) shall be tested with a ten degree wedge. b. Except as specified in item c below, fasteners with a nominal diameter over 1-inch shall be tested with a six degree wedge. c. Fasteners that are of grades 8, B7, B16, 410, 416, 416Se, 431, and 630 and are threaded within one diameter to the underside of the head shall be tested as follows: Sizes 1/4 inch through 3/4 inch (inclusive) Use a six degree wedgeSizes over 3/4 inch Use a four degree wedge d. Fasteners which have passed testing with wedge angles greater than those specified should be considered acceptable. 3.2.3 For fasteners of all grades with a nominal diameter less than 1/4-inch, wedge angles in accordance with ASTM-A574 shall be used. 3.2.4 For fasteners having a length less than the minimum specified in Table 1 of ASTM-F606, one ""test specimen fastener"" shall be manufactured from each lot of fasteners and tested to represent that lot. The length of these test specimen fasteners shall meet the minimum specified in table 1 of ASTM-F606 but shall not exceed it by more than 1/4 inch. Test specimen fasteners shall be the same type, style, and diameter as the production lot and shall be manufactured from the same starting material, using the same manufacturing techniques as the production lot, and shall be heat treated (if required) along with the production lot. 3.3 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.3.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.3.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.3.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.4 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor shall prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.4.1 A copy of the final waiver/deviation (both approved and disapproved) shall be forwarded with the applicable asset(s). 3.5 Mercury Free - Mercury and mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.6 Quality System Requirements - The Contractor furnishing items under this contract/purchase order shall provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.6.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.6.2 The Contractor's quality system shall be documented and shall be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor shall, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.6.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.6.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.6.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.7 Contractor Inspection Requirements - The Contractor shall maintain adequate records of all inspections and tests. The records shall indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.7.1 The supplier's gages, measuring and test equipment shall be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel shall be made available for operations of such devices and for verification of their accuracy and condition. 3.7.2 All documents and reference data applicable to this contract shall be available for review by the Government representative. Copies of documents required for Government inspection purposes shall be furnished in accordance with the instructions provided by the Government representative. 3.8 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents shall be annotated with the following statement: ""A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately."" 3.9 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor shall develop documented control procedures that require at least the following: 3.9.1 Visual examination upon receipt to detect damage during transit. 3.9.2 Inspection for completeness and proper type. 3.9.3 Verification of material quality received. 3.9.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.9.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.9.6 Identification and protection from improper use or disposition. 3.9.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier shall determine and record probable cause and necessity for withholding the material from use. 3.9.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property shall be maintained. 3.9.9 Material returned to the contractor shall be handled as GFM. 3.10 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.10.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.11 Material Traceability - Traceability markings shall be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability shall be maintained through all process operations including any subcontracted operations, to the finished component. 3.11.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking shall be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking shall be reapplied upon completion of the final manufacturing process. 3.11.2 The material control process shall include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders shall specify a method and marking location for remarking. The contractor shall also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.12 Final Inspection - The following inspections shall be performed prior to Government inspection and acceptance. 3.12.1 Material Sampling - Material shall be inspected for form, fit, and function. Lot acceptance shall be based on zero defects and lot rejection based on one defect. The sample size shall be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection shall be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size shall be eight units. For lot sizes of eight or less, the sample size shall be one hundred percent of the lot. 3.12.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.12.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) shall be 100% inspected. The certification test reports shall also be 100% inspected for completeness and legibility. 3.13 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as ""to the best of our knowledge"" or ""we believe the information contained herein is true"" are not acceptable. 3.13.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.14 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and shall contain the following information: 1. Contractor's name, address, phone number and date. 2. The contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) 4. Lubricants, sealants, anti-seize, and/or thread locking compounds. (""N/A"" when Not Applicable). 5. Cure date (""N/A"" when Not Applicable). 6. Manufacturer's compound number (""N/A"" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. (""N/A"" when Not Applicable). 8. A statement which lists by name, all tests and inspections specified in Section 3 of this contract, and states that they have been performed satisfactorily. (""N/A"" when Not Applicable). 9. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements. 10. Contractor's or authorized personnel's signature. 3.14.1 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, or S-5343934-3, the Certificate Of Compliance must also include the information below: 11. A notation that 32 root mean square (RMS) finishes are in accordance with the specifications and are free of imperfections. 12. Direct reading of O-ring surface diameters with specified standard. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Severaldefinitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or ""production representative"" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Age...
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/c87f30165f124fac8dd0418ddc410580/view)
- Record
- SN06496480-F 20221020/221018230118 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |