SAMDAILY.US - ISSUE OF OCTOBER 21, 2022 SAM #7630
SOURCES SOUGHT

Y -- Cooling Tower Replacement

Notice Date
10/19/2022 11:29:22 AM
 
Notice Type
Sources Sought
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
PBS R9 ACQ MGMT DIV PROJECTS BRANCH SAN FRANCISCO CA 94102 USA
 
ZIP Code
94102
 
Solicitation Number
300NLACoolingTower
 
Response Due
11/2/2022 3:00:00 PM
 
Point of Contact
Krista M. Miller, Phone: 4155224157
 
E-Mail Address
krista.miller@gsa.gov
(krista.miller@gsa.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Request for Capability Statements This is not a�request�for proposals. This is an inquiry to determine the level of interest and capability to perform a potential design build contract for a project at a federal building in Los Angeles, among small businesses. The estimated contract is valued at between $6-8 million. The NAICS code is 236220.� The contract is anticipated to involve the following work: The overall strategic project goal of the Design-Build (DB) Contractor is for the replacement of (4) 2 Cell Cooling Towers and to perform structural sub-platform and main platform repairs and/or replacement within an occupied building without disruption to occupants and to utilize sustainable design and construction strategies where applicable and practical. Phase 1 Cooling Tower 1 and/or 2: Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Furnish and set-up (1) 500 Ton temporary skid mounted Cooling Tower adjacent to the building on Los Angeles St. within a lockable chain link fence enclosure affording adequate NEC and service clearances, and pipe temporary by-pass CWS/R lines to POCs in the basement. Provide temporary make-up water (MUW) and drain down piping indirectly to the nearest approved sanitary sewer. Provide temporary electrical power via a 200 KVA skid mounted genset and electrical disconnect and service power to the skid mounted Cooling Tower. Provide biocidal and other chemical treatment as needed for a temporary cooling tower. Obtain necessary permits and special inspections if/as required from the City of Los Angeles Public Works. Disconnect controls from CT-1 and/or 2, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-1 and/or 2 and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-1 and/or 2 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness.� Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse.� Install engineered vibration isolators and seismic bracing for CT-1 and/or 2 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to-endpoint testing and verification. Phase 2 Cooling Tower 3 and/or 4: Replace the (2) existing nominal 900-ton Cooling Towers (CTs) in one or two phases of construction. Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Disconnect controls from CT-3 and/or -4, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-3 and/or -4 and their respective CW pumps and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-3 and/or -4 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or an elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness.� Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-3 and/or -4 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to- endpoint testing and verification. (Note: There is no BAS programming nor graphics scope) The above scope of work statement is merely a synopsis of the anticipated scope, and is not a contractual description. If a RFP is issued for this work, the SOW included in the RFP, and eventual contract will be the contractual requirement. This above description is just to convey a general sense of the work to be required, solely for the purposes of this�request�for capability statement, subject to change with the issuance of an RFP and/or contract. It is anticipated that a possible RFP will be issued for this requirement in fall of 2022, with an award projected for approximately winter or early spring 2023.� If your firm is interested in this work, and anticipates submitting a proposal in response to an RFP for this work, please respond to this�request�for capability statements with the following information: 1.�A notarized statement from a Treasury-approved surety of the Offeror�s minimum per-contract bonding capacity of at least $10,000,000.� 2. A statement indicating whether your firm is a small business, or has any socio-economic small business status, and which one(s). 2. A description, which may include pictures, of two projects for which your firm performed the following similar work, not to exceed a total of two 8.5 x 11 inch sized pages. Magnitude: At least $3,000,000 in total construction cost Type:�Repairs or alterations in an occupied space within a�multi-story government�building�or other multi-story institutional or commercial use building�that includes the following elements: Cooling tower replacement Large rooftop equipment replacement requiring a crane lift Structural steel repair and construction
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/122031c8c22d4df49e2833359cdcbcad/view)
 
Place of Performance
Address: Los Angeles, CA 90012, USA
Zip Code: 90012
Country: USA
 
Record
SN06498323-F 20221021/221019230058 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.