Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 26, 2022 SAM #7635
SOLICITATION NOTICE

Y -- CA ERFO SIERRA NF 05S07(1) NORRIS CREEK BRIDGE

Notice Date
10/24/2022 10:40:01 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22B000037
 
Response Due
11/3/2022 1:00:00 PM
 
Archive Date
11/18/2022
 
Point of Contact
Kelly Palmer, Phone: 7209633500, Sheri Walsh, Phone: 720-963-3500
 
E-Mail Address
CFLConracts@dot.gov, cflcontracts@dot.gov
(CFLConracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
CA ERFO SIERRA NF 05S07(1) - NORRIS CREEK BRIDGE PROJECT DESCRIPTION AND LOCATION:� The Sierra National Forest (SNF) sustained significant damage to transportation facilities, including bridges during the 2020 fire season.� The project site is located approximately 37.2 miles northeast of Oakhurst, CA on Forest Service Route 05S007 (Beasore Road) within Sierra National Forest in Madera County, CA. The original bridge was a one lane, two-way traffic single span structure at a 15-degree skew.� It had an overall bridge length of 37 feet, roadway width (curb to curb) of 14.1 ft, and deck width (outside to outside) of 15.4 ft. � SCOPE OF THE WORK: The purpose of the project is to replace the Norris Creek Bridge over Norris Creek within Sierra National Forest in Madera County, California.� The bridge was completely damaged by fire in 2020 and will be fully replaced with a prefabricated steel bridge. A two-lane, 70-ft x 24-ft proposed structure is anticipated. The roadway approaches will be reconstructed for up to 150 feet on either end of the bridges. The bridge and a short section of the roadway approaches will be asphalt overlaid to match the existing roadway section. Bridge rail and guardrail with terminals will be included. Items worth noting: The work will be listed within a single Schedule (Schedule A) and no options are proposed. Adjacent segments of Forest Route 05S007 will remain closed during construction and can be used for contractor staging and storage.� Access is to both sides of the bridge is possible by an approximate 7.5-mile detour. Deep foundations (micro-piles or drilled shafts) are anticipated PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 8500 CUYD of Excavation/Embankment Construction������� 250 CUYD of Riprap 300 TON of Roadway Aggregate 70-ft x 256-ft of Prefabricated Steel Bridge 200 TON of Asphalt Pavement��������������������� 150 LNFT of Guardrail, including terminals 80 hours of Equipment Hours 40 hours of Labor Hours ESITMATED MAGNITUDE: Between $700,000 and $2,000,000
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/c77c7f6b7fea4862a778413924a8bf68/view)
 
Place of Performance
Address: Oakhurst, CA 93644, USA
Zip Code: 93644
Country: USA
 
Record
SN06500989-F 20221026/221024230056 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.