Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 05, 2022 SAM #7645
SOLICITATION NOTICE

Y -- USACE-SPK -DBB - Folsom Main, Left Wing and Right Wing Dams

Notice Date
11/3/2022 4:44:32 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT SACRAMENT SACRAMENTO CA 95814-2922 USA
 
ZIP Code
95814-2922
 
Solicitation Number
W9123822R0055
 
Response Due
12/20/2022 10:00:00 PM
 
Archive Date
02/24/2023
 
Point of Contact
Nadine Catania, Dayon Tre Santos
 
E-Mail Address
nadine.l.catania@usace.army.mil, Dayon.T.Santos2@usace.army.mil
(nadine.l.catania@usace.army.mil, Dayon.T.Santos2@usace.army.mil)
 
Awardee
null
 
Description
***Amendment 0003 has been posted to piee.eb.mil.�Please use the link below to access the amendment. **** Access to the solicitation and Amendment 0003 can be found at�https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055 ***Amendment 0002 has been posted to piee.eb.mil. Please use the link below to access the amendment. Amendment 0001 was skipped and contractors should acknowledge Amd 01 on the SF1442 with their proposal understanding that this amendment will not be utilized. The site visit sign-in sheet is attached at the bottom of this announcement.**** Access to the solicitation and Amendment 0002 can be found at�https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055 The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, ?top seal? structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam. The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00. This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/be095833d0984bcdb143f8cef8eb7db8/view)
 
Record
SN06509205-F 20221105/221103230058 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.