SPECIAL NOTICE
Y -- Upgrade Ext. Infrastructure Bldg#21 589A6-23-238, EK-LV,
- Notice Date
- 11/4/2022 5:27:20 AM
- Notice Type
- Special Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- 255-NETWORK CONTRACT OFFICE 15 (36C255) LEAVENWORTH KS 66048 USA
- ZIP Code
- 66048
- Solicitation Number
- 36C25523R0015
- Archive Date
- 02/02/2023
- Point of Contact
- Timothy Parison, Contracting Officer, Phone: 913-946-1140
- E-Mail Address
-
timothy.parison@va.gov
(timothy.parison@va.gov)
- Awardee
- null
- Description
- Special Notice Page 6 of 6 Special Notice Page 1 of 6 DESCRIPTION FBO NCO15 MATOC SUBCONTRACTING SPECIAL NOTICE THIS INFORMATION IS POSTED FOR SUBCONTRACTING OPPORTUNITIES ONLY. PROPOSALS WILL NOT BE CONSIDERED FROM ANY FIRMS OTHER THAN THE Six (6) PREVIOUSLY SELECTED NCO15 CG CATEGORY II MATOC CONTRACTORS ONLY. NO SOLICITATION DOCUMENT WILL BE POSTED FOR THIS REQUIREMENT. THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THEREFORE, FAR 5.203 DOES NOT APPLY. IDIQ TASK ORDER FOR THE 589A6-23-238 Upgrade Exterior Infrastructure Building 21-Leavenworth Campus, Leavenworth Kansas. The attached project requirements specs and drawing are provided for informational purposes only. THE Six (6) NCO15 CG CATEGORY II MATOC CONTRACTORS AND CURRENT CONTRACT NUMERS ARE LISTED BELOW: Vendor Name IDIQ Contract Number Company POC Contact number GUARANTEE INTERIORS, INC. 36C25518D0072 Robert Farrell robert.farrell@gi-construction.com 314-881-3331 FLOYD CONSTRUCTION CORPORATION 36C25518D0075 Terrance Floyd tfloyd1@floydconst.com 316-648-4529 WFV CONSTRUCTION 36C25518D0076 Mitch Dallas mitchd@wonfreedom.com 816-914-0641 RB CONSTRUCTION COMPANY 36C25518D0079 Robert Hemmer rhemmer@rb-construction.com 618-974-9682 Project 589A6-23-238 Upgrade Exterior Infrastructure Building 21: This project will repair the exterior façade of building 21 at the Leavenworth campus. Work will include the following: replace roof to include new gutters and downspouts, replace windows with insulated efficient windows, tuckpoint, pressure wash and seal exterior brick, replace any rotted/damaged facia and soffit, and paint all trim and façade (to include dormers) of building 21. Performance for this project is 180-days.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/088838052c1640d7a00909123768b689/view)
- Record
- SN06510089-F 20221106/221104230054 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |