Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 11, 2022 SAM #7651
SOLICITATION NOTICE

Z -- Design-Build for Domestic Water Piping Repairs

Notice Date
11/9/2022 7:29:20 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
PBS R2 CAPITAL CONSTRUCTION BRANCH NEW YORK NY 10007 USA
 
ZIP Code
10007
 
Solicitation Number
47PC0322R0010
 
Response Due
11/23/2022 1:00:00 PM
 
Archive Date
12/08/2022
 
Point of Contact
Deborah J. Malachi, CO, Phone: 3475852193, Douglas Tumbrello, Phone: 9175743499
 
E-Mail Address
deborah.malachi@gsa.gov, douglas.tumbrello@gsa.gov
(deborah.malachi@gsa.gov, douglas.tumbrello@gsa.gov)
 
Description
Please send a request from SAM.gov to gain access to the Controlled (CUI) As-Built Drawings in the Zip file. Project Summary Design-Build: Generally described as follows but not limited to: The contractor shall supply all management, supervision, labor, materials, supplies, and equipment (except otherwise provided), and shall plan, schedule, coordinate, and assure the effective performance of the Domestic Water Piping project as described herein.� � � � Provide a phased construction plan. Domestic water piping replacement and installation shall meet Mech code 602.2.1.7 for plenums shall be installed per international plumbing code and approved by an R2 fire protection engineer. All public restrooms will be remodeled, ensuring the use of water-conservation plumbing�fixtures and ABAAS compliance. The main public bathroom layout shall be reconfigured to allow ease of access to the chase wall. While public bathrooms are under construction, one floor at a time, other floor bathrooms must be fully operational. New solar water heating system Sanitary pipe lining for underground piping on the first floor. Cistern repairs to prevent water leakages. The work includes a fire watch. Reconfiguration/relocation of all existing systems, utilities, or other obstructions displaced or otherwise affected by the installation of the new piping and related electrical�circuits: relocation or reconfiguration of lighting, fire suppression,�mechanical, electrical, plumbing, A.V./Telecommunication, and ceiling systems; Replacement/repair of all finishes and structures affected by the work to their pre-construction condition. All new finishes shall match existing ones; Installation, maintenance, and removal of the temporary construction partitions. The Contractor shall provide training on the new water pumping system to the�G.S.A. Building Preventive Maintenance Contractor; Commissioning, labeling, and testing of all piping, equipment, electrical panels, and circuits affected by the work. (Note: Any systems to be removed and reinstalled shall be tested prior to removal to establish agreed-upon baseline performance parameters. Upon re-installation, systems not upgraded in this contract shall be tested and shown to meet the baseline performance parameters.) Commissioning shall include the water treatment plan. END
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/c505b96c8f5d403fa62f051cdaf9483a/view)
 
Place of Performance
Address: Christiansted, VI 00820, USA
Zip Code: 00820
Country: USA
 
Record
SN06513752-F 20221111/221109230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.