SOURCES SOUGHT
Y -- WY FLAP CR CN10-277(1) Wiggins Creek Bridge
- Notice Date
- 11/15/2022 12:29:11 PM
- Notice Type
- Sources Sought
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF23SS0006
- Response Due
- 11/30/2022 3:00:00 PM
- Point of Contact
- Leslie Karsten, Sheri Walsh
- E-Mail Address
-
CFLContracts@dot.gov, CFLAcquisitions@dot.gov
(CFLContracts@dot.gov, CFLAcquisitions@dot.gov)
- Description
- THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT� INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs.� Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:� Leslie Karsten) for receipt by close of business (2 p.m. local Denver time) on November 30, 2022:� (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firm�s capability to bond for a single project of $5 million, and your firm�s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the WY FLAP CR CN10-277(1) Wiggins Creek Bridge project in which you performed removal of bridge, cofferdams, structural concrete, reinforcing steel, prefabricated steel bridge, bridge railing, drilled shafts, and construction and maintenance of a diversion. �DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc.� Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.� All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT NUMBER:� WY FLAP CR CN10-277(1) PROJECT NAME: �WIGGINS CREEK BRIDGE PROJECT DESCRIPTION:� The project is in Fremont County, Wyoming along the East Fork Road, approximately 6 miles north of the intersection with U.S Highway 26. The nearest town is Dubois Wyoming located approximately 15 miles west of the project location. The terrain is mountainous with an elevation of approximately 6700 feet. This project is for bridge replacement. SCOPE OF THE WORK:� The project includes removal of a one-lane bridge. A one lane diversion will be required before the removal of the existing bridge can begin as the roadway must remain open throughout the project. The creek is a sensitive resource area for the Yellowstone cutthroat trout and Brown trout. The construction season that is currently anticipated is that most work will be performed in late summer and through the winter to minimize the impact to the fisheries. There will be some level of public scrutiny as there are three private properties that are adjacent to the bridge. PRINCIPAL WORK ITEMS: The major items of work include the following: Removal of bridge (LPSM) Cofferdams (LPSM) Structural Concrete, Class A (AE) � 150 (CUYD) Reinforcing Steel � 21,700 (LB) Reinforcing Steel, Epoxy Coated � 13,000 (LB) Prefabricated steel bridge (100�x 29� Modular Steel Vehicular Bridge) (LPSM) Bridge Railing, Steel (WYDOT TL-3) � 290 (LNFT) Drilled Shaft, 30-inch diameter � 250 (LNFT) Construction and maintenance of diversion (LPSM) ANTICIPATED SCHEDULE: It is anticipated this project will be advertised in early 2023 and be under construction in August 2023.� The project has an estimated completion date of January 18, 2024. No in-water work can occur between May 15th and July 31st to avoid the Yellowstone cutthroat trout spawning and no in-water work between September 15th through November 30th to avoid brown trout spawning. ESTIMATED COST RANGE:� The estimated price range of the project work is between: $2,000,000 and $5,000,000 FUNDING SOURCE:� The project is funded through the FLAP program which includes a portion of the project being funded through match from Fremont County.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/11f7e89c1f2c478393e501b2697d3d4a/view)
- Place of Performance
- Address: Dubois, WY, USA
- Country: USA
- Country: USA
- Record
- SN06518808-F 20221117/221115230123 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |