Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 08, 2022 SAM #7678
SPECIAL NOTICE

C -- Create Code Compliant Research Lab Space in Building 1 PN:657-23-113JB

Notice Date
12/6/2022 11:02:17 AM
 
Notice Type
Special Notice
 
NAICS
541310 — Architectural Services
 
Contracting Office
255-NETWORK CONTRACT OFFICE 15 (36C255) LEAVENWORTH KS 66048 USA
 
ZIP Code
66048
 
Solicitation Number
36C25523R0031
 
Archive Date
02/04/2023
 
Point of Contact
Kevin D Knight, Contract Specialist, Phone: 913-946-1130
 
E-Mail Address
KEVIN.KNIGHT2@VA.GOV
(KEVIN.KNIGHT2@VA.GOV)
 
Awardee
null
 
Description
Synopsis: Request for Architectural and Engineer SF330 submission Solicitation: 36C25523R0031, FCA Create Code Compliant Research Laboratory Space in Building 1, Project No. 657-23-113JB CONTRACT INFORMATION This A-E Services requirement is being procured in accordance with the Brooks Act (Public Law (PL0582) and implemented in accordance with the Federal Acquisition Regulation (FAR) Subpart 36. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This procurement is restricted to Veteran Owned Small Business (VOSB) firms. This requirement is being procured in accordance with the VAAM 836.6 implemented in FAR Subpart 36.6. This is not a Request for Proposal, and an award will not be made with this announcement. This announcement is a request for SF 330 s from qualified Architectural and Engineer (A&E) contractors that meet the professional requirements. After the evaluation of SF330 submissions in accordance with the evaluation criteria, three or more of the most highly qualified firms will be chosen for interviews to present their approach to the design to arrive at selection of the number one firm for negotiations. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. The contract is anticipated to be awarded no later than December 31, 2022. Award of any resultant contract is contingent upon the availability of funds. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted via email only to (kevin.knight2@va.gov). Personal visits to discuss this announcement will not be allowed. The NAICS Code for this procurement is 541310, Architectural Services and the small business size standard of $11 Million. Award of a Firm Fixed Price contract is anticipated. Anticipated time for completion of design is approximately 199 calendar days including time for VA reviews. The A/E firm shall also be required to perform construction period services if award of a construction project contract is made. DATABASE REGISTRATION INFORMATION: VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR THIS ACQUISITION IS 100% SET-ASIDE FOR QUALIFIED VETERAN OWNED SMALL BUSINESS AE FIRMS INCOMPLIANCE WITH VAAR 852.219-74. ONLY BUSINESSES VERIFIED AND LISTED IN THE VENDOR INFORMATION PAGES DATABASE, (https://www.vetbiz.va.gov/vip), SHALL BE CONSIDERED. SYSTEM FOR AWARD MANAGEMENT (SAM.GOV): Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM.GOV) database at https://sam.gov/content/ and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM.GOV prior to submitting their qualifications package. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at https://sam.gov/content/ for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54) Qualified A-E firms are required to respond if interested by submitting one (1) original completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: : http://www.gsa.gov/portal/forms/download/116486).  Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions must be in pdf and emailed. Completed package shall be delivered on or before December 20, 2022, by 1:00PM CT to the following email address: kevin.knight2@va.gov. Email subject line shall clearly identify Solicitation number: 36C25523R0031 and project name FCA Create Code Compliant Research Laboratory Space in Building 1, Project No.657-22-113JB. The SF330 submission must be a pdf document and must be below 20 MG. EVALUATION FACTORS: Selection criteria are in accordance with Federal Acquisition Regulation (FAR) Part 36.602-1 and VAAM 836.602-1.  Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as necessary.  SF 330 submissions including any additional pages are not to exceed fifty (50) pages. Each page cannot exceed 8 1/2 x 11 in size. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as required and SF 330 submissions including any additional pages are not to exceed fifty (50) pages. If submissions exceed the page limit, only the first 50 pages of information will be considered. Qualifications (SF330) submitted by each firm for Project No. 657-23-113JB, FCA Create Code Compliant Research Laboratory Space in Building 1, will be reviewed and evaluated based on the following evaluation criteria listed below: Professional Qualifications: the qualifications of the individuals will be examined for experience and education and their record of working together as a team that are necessary for satisfactory performance of required services. The firm and A/E s on staff representing the project or signing drawings in each discipline must be licensed to practice in one of the US States. Provide Professional License numbers and/or proof of licensure. Specialized Experience and Technical Competence: specific experience and technical skill in the type and scope of work required on this project including, design of a research laboratory and VA Safety and Physical Security design. Experience in abatement of hazardous construction materials, energy conservation, pollution prevention, and waste reduction. Include government and private experience on projects similar in size, scope and complexity as well as experience with project phasing in order to maintain facility operation during construction. Capacity to Accomplish the Work: the general workload and staffing capacity of the design office which will be responsible for the majority of the design and the ability to accomplish the work in the required time will be evaluated. In accordance with VAAR 852.219-10(d)(1), prime contractors shall clearly state and demonstrate how they will meet the requirement that at least 50 percent of the design work be accomplished by employees of the concern or employees of eligible service-disabled veteran owned small business subcontractor/consultant. Location of Design Firm: Per FAR 36.602-1 Selection Criteria: Market research indicates that at least 3 qualified firms exist within a 600 mile radius of the Jefferson Barracks VA Medical Center located at 1 Jefferson Barracks, Saint Louis, MO 63125. This procurement is restricted to Veteran Owned Small Business (VOSB) firms LOCATED WITHIN A 600 MILE RADIUS OF THE Jefferson Barracks VA Medical Center located at 1 Jefferson Barracks, Saint Louis, MO 63125. Architectural Prime Contractors whose primary (i.e. headquarters, primary corporate office, main office) physical business address is within a 600 mile radius from the Jefferson Barracks VA Medical Center located at 1 Jefferson Barracks, Saint Louis, MO 63125 and resides within the borders of the United States of America will receive a higher score on evaluations. Architectural Prime Contractors whose primary physical business address is outside a 600 mile radius from the Jefferson Barracks VA Medical Center located at 1 Jefferson Barracks, Saint Louis, MO 63125 and resides within the borders of the United States of America will receive a lesser score on this evaluation factor. Architectural Prime Contractors are required to verify the primary physical business address (described above) as part of the SF330 response. If the information cannot be verified as required, the SF330 will be found to be nonresponsive and will not receive further consideration. SF 330 submissions from companies located outside the borders of the United States of America shall not be considered. Past Performance on similar project contracts with the Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. Performance on past Government contracts as indicated in Federal performance reporting databases is encouraged. Failure to provide requested past performance data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. Past projects provided for reference shall be the work of the office/branch/individual team member proposed to be performing work under this contract. Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Reputation and standing of the firm and its principal officers within the design community with respect to professional performance, general management and cooperativeness, including awards, merits and recommendation. Record of significant claims against the firm or terminated contracts because of improper or incomplete architectural and engineering services. The extent to which potential contractors identify and commit to the use of Veteran-Owned Small Businesses. Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates. A/E CONTRACT SUPPLEMENT B PROJECT NUMBER: 657-23-113JB PROJECT TITLE: FCA-Create Code Compliant Research Laboratory Space in Building 1 SUPPLEMENT B (For Schematics, Design Development, Construction Documents, Construction Cost Estimate and Construction Period Services) DESIGN TIMEFRAME: A/E shall deliver final construction documents No Later Than (NLT) 199 days after the Award/Notice to Proceed Letter. CONSTRUCTION BUDGET/DESIGN LIMITATION: $913,000. A/E will also be required to incorporate bid items into the bid documents that will allow for a 20% budget reduction. B1 SCHEDULE OF SERVICES: INTRODUCTION: The mission of the Veterans Affairs Saint Louis Health Care System (VASTLHCS) is to provide the highest quality health care to our nation s veterans. In order to accomplish this mission, VASTLHCS Facility Engineering Service (FES) intends to partner with an A/E Firm on a project to create two code compliant research lab spaces located in Building 1, Jefferson Barracks (JB) Division, St. Louis, MO 63125. The renovation will address and correct several poor Facility Condition Assessments, FCAs. The A/E Firm must provide Basic Professional Services as delineated in the Scope of Work. As part of the Basic Professional Services, FES expects the following primary A/E disciplines to be included: Supervisor, Architectural, Mechanical, Electrical, Plumbing (Including Fire Protection), Structural, VPIH and Commissioning. SCOPE OF CONSTRUCTION PROJECT: Existing Conditions: Building 1 at the Jefferson Barracks VA facility is an existing 4-story building. The area of work is in the central portion of the 2nd & 3rd floors. Both rooms (2C19 & 3C17) have been recently gutted as part of an abatement project. However, in the locations of penetrations or new openings there may be additional demolition required. Project Intent: The current Research Labs in John Cochran Building 7 are non-compliant with NFPA 45 Standard on Fire Protection for Laboratories Using Chemicals. Two existing rooms at Jefferson Barracks will be converted to fully code compliant lab spaces. JB B1 2C19 (500 SF) will be used as a sterile chemical lab with a chemical and tissue hood. JB B1 3C17 (360 SF) will become a bacteria lab with a tissue hood. Chemical usage for both spaces should be evaluated with the service s needs to inform design decisions. Architectural: All applicable codes shall be incorporated into the design. All existing walls and doors should be brought up to required fire rating. All finishes shall be lab grade. Casework, equipment, and layout should be coordinated with the end users. A safety shower and chemical storage will be required. Mechanical: HVAC should accommode all interior space and exhaust requirements for Laboratories with Chemical Usage (NFPA 45 and any other applicable code or standard). Hoods should be exhausted as required. Any HVAC replacement shall include commissioning, testing and balancing of any new equipment or ductwork. Electrical: Design must include all electrical requirements and provide for all Laboratory equipment. Electrical lights & Exit lights shall be replaced with LED fixtures. Workstation locations shall include data, phone and electrical outlets. Plumbing/Fire Suppression: The Plumbing/Fire Suppression Systems shall be in compliance with all applicable codes and standards. Natural Gas: Natural gas at Jefferson Barracks is currently only located at the Energy Plant. Evaluate feasibility of connection to B1 and alternative options. Structural: Structure should be evaluated as needed for new equipment. Asbestos/Lead Abatement: Both rooms (2C19 & 3C17) have been recently abated as part of an abatement project. Existing exterior windows, stair and elevator are not in this project s scope. However, in the locations of penetrations or new openings there may be additional abatement required. Any alterations to the historic significance of the building will require SHPO review. This process should be managed by the A/E if required. Any laboratory space at the VA must be fully coordinated with ORO (Office of Research Oversight) and ORD (Office of Research & Development) requirements. SCOPE OF WORK FOR A/E: Design Development: The A/E shall make investigations necessary to thoroughly evaluate the area. All designs shall be in accordance with A/E Submission Instructions for Minor and NRM Construction Program, Program Guide PG-18-15, Volume C. Upon completion of initial field survey and assessment, provide a comprehensive report of existing conditions and findings to VASTLHCS Facility Engineering Service. Report will include initial cost estimate for all work included in Create Code Compliant Research Laboratory Space in Building 1 project. This report will be considered the Design Narrative as referenced in B5 DESIGN REVIEW AND COMPLETION SCHEDULE below. Construction Document: After the VAMC approves the A/E's design development, the A/E shall prepare construction documents necessary to accomplish the approved design development. As part of the 100% design submission, the A/E shall provide a written synopsis describing the overall scope of the construction project as well as any pertinent information about the project that would assist potential bidders in preparing a comprehensive bid package. This synopsis is intended to be a general description of the project not to exceed two written pages in length. The final design documents from a resultant task order will be subject to review and approval (by signature) of all members of an Integrated Project Team (IPT) consisting of medical center personnel.  These individuals will be identified by the COR at the first design review meeting. Construction Period Service: The A/E shall perform construction period services as detailed later in this scope of work. Functional Product: It is important to emphasize that the A/E shall perform design development and detailed design work, and prepare detailed construction documents, keeping in mind that the end result is a completely functional and fully operational system. VPIH Survey: The A/E Firm will complete a survey, to include testing, identifying any and all asbestos and lead containing materials within the project area. Abatement in these rooms will take place prior to this project but there may be additional areas that will require removal of lead and asbestos for penetrations or other unforeseen circumstances. All spaces within the scope of work must be designed according to applicable codes and standards. The A/E shall submit a design narrative (15%) and design plans (35%, 65%, 95%, 100% Contract Docs for Bidding, and Release for Construction Set) specifications, submittals schedule, estimates and other documentation in accordance with the B4 DESIGN DELIVERABLES section of this Supplement B. The construction work will be performed under a separate Firm-Fixed-Price contract awarded by the VA. As a result, the Construction Documents must conform to the estimated Total Construction Cost Price, not including any contingencies, and convey the entire construction work completely and clearly, such that any bidder can produce an accurate bid without surveying the work site. The A/E will also participate in the VASTLHCS Pre-Construction Risk Assessment to determine the requirements for Infection Control, Interim Life Safety Measures, occupational safety and health, patient safety, public safety, security controls for physical and logistical access, and environmental controls and limitations on vibrations, noise, and disruptions to operations and utilities. The results of these assessments will be included in documentation submitted by the A/E pursuant to, and inclusive of, the Construction Documents. Prior to submittal of a response to this proposal the A/E shall meet with the Contracting Officer s Representative (COR) at the proposed project site to review the scope of services and the project goals. The following Facilities Condition Assessment (FCA) items are applicable to this project and will be integrated into the scope of this project. FCA # 280516 - Research Rooms 3C17: VCT is in poor condition; replace flooring. FCA # 280515 Research Rooms 3C17: Replace wall base at newly painted walls and casework. FCA # 394489 - Replace rubber wall base: 3C17-10 LF Overall site plans will be provided as a Reference Drawing with Room Numbers showing the areas within the project boundary. The C&A requirements do not apply, and a Security Accreditation Package is not required. Sustainability Requirements: Design shall comply with the most current version of the VA Sustainable Design Manual at time of award found on the VA technical Information Library https://www.cfm.va.gov/til/sustain.asp The following deviations are allowed: None. GUIDING PRINCIPLES CHECKLIST:  AE shall complete and submit the appropriate Federal Energy Management Guiding Principles Checklist https://energy.gov/eere/femp/downloads/guiding-principles-checklists-new-construction-and-modernization-and-existing IV. A/E FEE DETERMINATION: The A/E is to present their fee proposal for evaluation and negotiation in the following format: Submit completed Price Proposal on NCO 15 Form 10-6298. The spreadsheet is to have the work broken out in hours by position, by discipline and by design phase. Include a list of the number of drawings required for each design phase broken out by drawing type per discipline. Include a summary of the foregoing with the number of hours required for each drawing type and each major task. The spreadsheet will be used to facilitate review and comprehension of work effort and document fee. Include Part IV in cover letter and Part V (signed) as a separate attachment. Submit the electronic file of the spreadsheet upon request. Include a letter of understanding with the price proposal that presents a detailed understanding of the Supplement B. The letter of understanding shall include an analysis of the fee included and excluded from 6% fee limitation as compared to the estimated Construction Budget. Reproduction and delivery costs of Design Review Material and other direct costs, such as travel costs, are included in the costs for each design phase and are not reimbursable. The costs of Bidding reproduction, delivery and other direct costs in accordance with the Milestone Submittal Requirements are included in the CD Phase. Unused site visits will be deducted at the end of the contract. Provide an outline of the Quality Assurance/Quality Control actions that your firm will take during the design process and construction period. Monthly QA/QC reports are required, including actions taken to maintain project quality, schedule and budget, and will be submitted with project invoices using the NCO 15 invoice format. Correction of A/E s Errors and Omissions, including required site visits to ascertain remedial action, is included in scope of services at no additional cost to the VA. V. REPORTS, DRAWINGS, SPECIFICATIONS AND SCHEDULES: Kick-Off Meeting: An initial kickoff meeting will be held with the Contracting Officer and local staff. This meeting will be intended to provide an onsite familiarization with the project. The VA will provide workload data and as-built drawings. A/E Design Submissions shall comply with the VA A/E Design Submission Requirements as found in the VA Technical Information Library (TIL). The VA will provide comments and guidance following each design review session. All meetings shall be held at Jefferson Barracks Division of the VASTLHCS in Saint Louis, MO or via Microsoft Teams. Schematic Design: The A/E firm shall conduct an onsite review of the existing locations of the various functions that will be relocated to and/or remodeled within the space to help understand the needs of the departments. They shall meet with the representatives of these departments to review and compare the VA design guides to the specific departmental needs. This will serve as an opportunity for the A/E to gain a further understanding of the direction the facility wants the project to go. After meeting with the departments, the A/E shall prepare a minimum of three separate schematic layouts of the space for review. The A/E shall provide pros and cons for each option. The A/E shall present these options to the COR who will in turn present them to the departmental leads and senior leadership. The VA will select the preferred option for the design. Space layouts shall meet current VA Space Planning Criteria s (7610 Building Design Guide) and be in compliance with the Uniform Federal Accessibility Standards (UFAS), and VA Barrier Free Design Guide (PG-18-13). At the Schematic Design Review Meeting, the A/E should be prepared to discuss the scope of the project, provide examples of current VA standard room layouts, site drawings identifying the project area showing a basic schematic layout of the various functions, a timeline for design and a brief construction summary. The A/E shall record the minutes of the meeting to document the thoughts and concerns of the facility. Design Development: The A/E firm shall make investigations necessary to thoroughly evaluate the conditions of the existing space. There will not be a systems redesign for this process. The design shall include any energy efficiency improvements available for the application. All designs shall be in accordance with A/E Submission Instructions for Minor and NRM Construction Program, PG-18-15, Volume C. Mechanical, plumbing, electrical, and fire and safety systems must meet current codes and standards, including VA Standards. All new space and utilities will be designed to meet the Interagency Security Committee s and other relevant physical security guidelines. The completed project shall be capable of achieving LEEDS certification. Construction Documents: The A/E firm shall complete such further investigations to develop the accepted design development documents into working drawings and specifications for issuance through the competitive bid process. The A/E firm shall provide a complete construction plan detailing all phases and sequencing of construction to minimize the impact on the facility. In most instances, the VA Master Construction Specifications will be edited and incorporated in the project specifications. However, in those instances where corresponding VA Master Construction Specifications are not available, the A/E shall develop the specification for incorporation into the project specifications. It is required that the A/E design in accordance to VA guidelines as these guidelines supersede any other industry guidelines. It is important to note that all specification sections are to be thoroughly edited to maintain uniformity of formatting and structure. All spec writer notes must be removed. Working drawings and specifications shall provide for construction within the National Fire Protection Association Code, VA Standards, and other applicable national codes. The A/E firm shall provide a clause in the specifications indicating method by which a contractor will provide information to the firm to allow the firm to provide as-built drawings upon completion of construction. As-Built Drawings: The A/E firm shall submit one (1) complete set of drawings provided via file share software using AutoCAD Release 2022 and also .pdf format. Models should be provided in Revit 2022. The A/E shall follow the VA Standard CAD format for layering in accordance with the B3 DESIGN CRITERIA section of this Supplement B. The A/E firm shall submit said As-Built (aka Record Drawings) drawings within 30 days of receipt of red lined drawings. Reproduction of Drawings and Specifications: Specifications shall be prepared in MS Word and drawings shall be prepared in Revit 2022 and submitted to the VA in Revit & AutoCAD formatted files in accordance with the B4 DESIGN DELIVERABLES section of this Supplement B. The A/E is required to prepare drawings in Revit. One transfer via file share software containing all reports, specifications, documents and drawings will be required for each milestone submission. The final Construction Document submission shall include copies of the original digital files (in *.dwg and *.rvt) in addition to the .pdf format files. All necessary reports, cost estimates and other documents shall be prepared in accordance with all applicable portions of the A/E Submission Instructions, Program Guide PG-18-15, Volume C. The VA reserves the right to require immediate delivery of the A/E s digital files to the VA at any time. Specifications should be provided in both hardcopy and electronic form. One half size set of drawings and one set of specs shall be sent to the Contracting Officer at the 95% and 100% construction document review periods. At the 95% and 100% construction document review periods, the specifications should have all revisions incorporated providing a clean set of specifications for review and approval. VI. PROMOTION OF FULL AND OPEN COMPETITION: A/E agrees to prepare specifications that are not competitively restrictive or proprietary. Specifications will be based on performance criteria when possible and will not use a product by a specific manufacturer, except as a basis of design. If an occasion arises that use of a product by a specific manufacturer is necessary, the A/E will provide a justification including: Why the particular manufacturer/product must be used or why a performance specification cannot be written (proprietary design, etc.). The evaluation criteria of alternate manufacturer s product that must be met to be considered equal. These evaluation criteria will be used to accept the alternate manufacturer s product as equal to the specified product. These evaluation criteria shall be comprehensive to ensure an equal product is supplied meeting contract requirements. In the event it is necessary to pre-qualify major components, the A/E will advise the Contracting Officer of such, so that the necessary action can be taken to establish a Qualified Products List. In addition to requirements of these special provisions, a certification will be provided stating the specification solicitation is not restrictive; it has been written to provide full and open competition; and will list at least three manufacturers who can supply the specified major components or systems of the project. VII. MISCELLANEOUS: The existing drawings for Building 1 included within the limits of this project will be provided to the A/E consultant For Reference Only. As-Built and Record Drawings have been found to not show the actual location, quantity, etc., of all building features and should only be used as a general guide. The A/E shall verify the existing drawings to the extent necessary for completion of construction. Files in *.dwg or*.rvt format will be provided to the A/E if those files are available for distribution. The VA COR will assist the A/E when site inspection procedures impact the functioning of any of the building utility systems, services or health care operations. Spaces with controlledaccess will require a member of the VA staff to continuously escort the A/E Consultant whilst accessing the space. As a result, the A/E must coordinate with VA Engineering (COR) to identify where the A/E is intending to perform site visit surveys at least fourteen (14) days in advance of any site visit. Some utility systems, services or health care operations are critical, and if a disruption is required, it must be executed outside of normal working hours. Normal working hours are Monday through Friday, 7:30 a.m. to 4:00 p.m. This schedule must be coordinated with the VA COR fourteen (14) days in advance. The A/E is responsible for recording the minutes of all meetings with the VA. The format of the meeting minutes shall be subject to prior approval from the VA COR. The draft meeting minutes shall be distributed for review and comment within one working day following the meeting to the COR, who will in turn distribute the same to each invited VA-attendee as required. Meeting minutes are loaded to Submittal Exchange or equal web system. The VA shall have two working days upon receipt of the meeting draft documents to make any additional comments or corrections. The final meeting minutes shall be issued within three working days after the meeting to the VA CO and the COR. Coordination of each submittal will be fully documented by the A/E. Using industry standard methods, the A/E will collect, document and resolve all comments and consolidate them into a usable format. The resolution of each comment requires the COR and commenter s concurrence. For each design submittal, the A/E will conduct a comment review meeting where each comment received will be either: Concurred as Written Non-Concurred; Request Discussion Requires Clarification At the conclusion of the comment review meeting, the A/E will provide meeting minutes showing the status of each comment made. The resolution will be incorporated into the project documents (drawings, specifications, etc.) prior to the next submittal. Any commen...
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/32a39edbdf104d8fb1a3a5422ab54514/view)
 
Record
SN06535757-F 20221208/221206230054 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.