Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 14, 2022 SAM #7684
SOLICITATION NOTICE

47 -- RFI for LBNF FSCF - Grooved Pipe Couplers

Notice Date
12/12/2022 12:09:43 PM
 
Notice Type
Presolicitation
 
NAICS
332919 — Other Metal Valve and Pipe Fitting Manufacturing
 
Contracting Office
FERMILAB - DOE CONTRACTOR Batavia IL 60510 USA
 
ZIP Code
60510
 
Solicitation Number
LBNF-FSCF-GPC-RFI
 
Response Due
12/16/2022 1:00:00 PM
 
Point of Contact
Craig Schmitz, Phone: 6308403998
 
E-Mail Address
schmitzc@fnal.gov
(schmitzc@fnal.gov)
 
Description
Request for Information This is a request for Information (RFI) issued by Fermi Research Alliance, LLC (�FRA�), manager and operator of Fermi National Accelerator Laboratory (�FERMILAB�), under its Prime Contract Number DE-AC02-07CH11359 with the United States Department of Energy (�DOE�). FRA is leading the Long Baseline Neutrino Facility (LBNF) Project to enable a world-class program in neutrino physics. Background The LBNF project (httpsw://lbnf-dune.fnal.gov/) will provide facilities to enable a world-class program in neutrino physics that can measure fundamental physical parameters, explore physics beyond the Standard Model, and better elucidate the nature of matter and anti-matter. Specifically, the LBNF Project will build a new high-intensity neutrino beam at the Fermi National Accelerator Laboratory aimed at the LBNF Far Site, located at the Sanford Underground Research Facility (SURF) in Lead, South Dakota, 1,300 km away, where the associated Deep Underground Neutrino Experiment (DUNE) will build a neutrino detector, known as the Far Detector. DUNE will also build a neutrino detector at Fermilab, known as the Near Detector, to characterize the neutrino beam as it leaves Fermilab. The experiment will be optimized for precision measurement of neutrino oscillations with the goal of searching for charge parity-violation in the neutrino sector, as well as making other precision oscillation measurements. Far Site Construction Fermi Research Alliance�s Long Baseline Neutrino Facility (LBNF) Project requests your valuable input. Please see attached documents regarding grooved pipe couplers for the Far Site liquid Argon service pipe. The primary point of contact for the RFI is Craig Schmitz, LBNF Procurement Manager, or his designee. All questions regarding this RFI should be submitted via electronic mail to schmitzc@fnal.gov by 3:00 P.M. CST on December 13, 2022. All responses to this RFI should be submitted by electronic mail to schmitzc@fnal.gov by 3:00P.M. CST on December 16, 2022. This is not a Request for Proposal (RFP) or Quote (RFQ) and no submissions will be accepted as official offers for a contract. FRA will not reimburse respondents for any expenses associated with this RFI.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/f6c89856c3cb41ccaa3034bd9ae3bc6f/view)
 
Place of Performance
Address: Lead, SD 57754, USA
Zip Code: 57754
Country: USA
 
Record
SN06540205-F 20221214/221213084344 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.